Resolve Site Drainage Issues at the Delaware Valley JCC
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1605AE-22-B-00002
- Agency
- Office of the Assistant Secretary for Administration and Management Department of Labor
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Callicoon, New York 12723, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to complete renovation and improvements to the campus-wide storm water management drainage system at the Delaware Valley Job Corps Center in Callicoon, New York. The Department of Labor Office of the Assistant Secretary for Administration and Management requires the contractor to install drainage piping and catch basins in phases, conduct associated demolition and excavation work, trench, regrade the site to create drainage swales, and perform miscellaneous paved roadway and grounds restoration. The work must be completed on a firm fixed-price basis within 240 calendar days of receiving the notice to proceed. Amendments to the solicitation provided responses to vendor questions and maintained the response deadline of May 25, 2022.
The opportunity is set aside for total small business concerns. The primary NAICS code is 237110 for water and sewer line and related structures construction. The predominate PSC code is R499 for construction of structures and facilities. The place of performance is the Delaware Valley Job Corps Center campus in Callicoon, New York. The solicitation does not include budget figures but seeks all professional services, supervision, labor, materials, equipment, and general requirements to complete the drainage system renovations and improvements within the specified 240-day period.
Notice text
3 versions
Update #3 · Latest ·
The contractor shall complete all work outlined in the Scope of Work for the renovation and improvements to the Campus-Wide Storm Water Management Drainage System at the Delaware Valley JCC. Project consists of providing construction services required for the renovation and improvements to the campus-wide storm water management drainage system. Associated work includes, but is not limited to, phased installation of drainage piping, catch basins, and associated demolition; excavation, trenching, grubbing, regrading of the site to create new swales and control drainage. Also included in the project are miscellaneous paved roadway restoration, grounds restoration and related work. Additionally, the contractor shall furnish and include a price for all professional services, supervision, labor, material, transportation, equipment and services, unless otherwise specified herein, required under this contract for the following firm fixed price and within the time specified herein. This price shall also include overhead insurance and fees, profit and all cost for project General Requirements.
Amendment 0001:
1. Provides answers to question(s) submitted by prospect contractors
2. Provides the sign-in sheet for the site visit
Amendment 0002:
1. Provide updated responses to previous question(s) as well as provide answers to remaining questions that were not included in Amendment 0001.
Update #2 ·
The contractor shall complete all work outlined in the Scope of Work for the renovation and improvements to the Campus-Wide Storm Water Management Drainage System at the Delaware Valley JCC. Project consists of providing construction services required for the renovation and improvements to the campus-wide storm water management drainage system. Associated work includes, but is not limited to, phased installation of drainage piping, catch basins, and associated demolition; excavation, trenching, grubbing, regrading of the site to create new swales and control drainage. Also included in the project are miscellaneous paved roadway restoration, grounds restoration and related work. Additionally, the contractor shall furnish and include a price for all professional services, supervision, labor, material, transportation, equipment and services, unless otherwise specified herein, required under this contract for the following firm fixed price and within the time specified herein. This price shall also include overhead insurance and fees, profit and all cost for project General Requirements.
Amendment 0001:
1. Provides answers to question(s) submitted by prospect contractors
2. Provides the sign-in sheet for the site visit
Update #1 ·
The contractor shall complete all work outlined in the Scope of Work for the renovation and improvements to the Campus-Wide Storm Water Management Drainage System at the Delaware Valley JCC. Project consists of providing construction services required for the renovation and improvements to the campus-wide storm water management drainage system. Associated work includes, but is not limited to, phased installation of drainage piping, catch basins, and associated demolition; excavation, trenching, grubbing, regrading of the site to create new swales and control drainage. Also included in the project are miscellaneous paved roadway restoration, grounds restoration and related work. Additionally, the contractor shall furnish and include a price for all professional services, supervision, labor, material, transportation, equipment and services, unless otherwise specified herein, required under this contract for the following firm fixed price and within the time specified herein. This price shall also include overhead insurance and fees, profit and all cost for project General Requirements.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment 0002 Delaware Valley JCC 1605AE-22-B-00002.pdf | ||
| Amendment 0001 Delaware Valley JCC 1605AE-22-B-00002 5.16.22.pdf | ||
| How to View Solicitation Attachments.pdf | ||
| Solicitation 1605AE-22-B-00002.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Resolve Site Drainage Issues at the Delaware Valley JCC | Award Notice | |
| Resolve Site Drainage Issues at the Delaware Valley JCC | Solicitation | |
| Resolve Site Drainage Issues at the Delaware Valley JCC | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity