Request for Proposal - UIP-KRS-358654-JK
Closed Solicitation Posted
- Solicitation number
- UIP-KRS-358654-JK
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 335311 Power, Distribution, and Specialty Transformer Manufacturing
- Place of performance
- Batavia, Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory is seeking proposals for a subcontractor to provide a main power transformer (MPT) including auxiliary equipment, services, controls, and protective devices. The RFP also includes an option to purchase bushing monitoring. Key requirements include compliance with the specified quality management plan and acceptance criteria, and prior approval for any substitutions of proposed key personnel or production locations. The proposal due date is September 19, 2024, with the transformer to be produced and delivered by December 1, 2028, but no earlier than April 1, 2028, and startup services completed by December 2029.
This solicitation does not include any set-aside designations, and does not mention any incumbent contractors. The NAICS code is 335311 - Power, Distribution, and Specialty Transformer Manufacturing, and the PSC code is 6120-P - Transformers: Distribution And Power Station. The place of performance is Batavia, IL 60510, USA.
Notice text
Provide all labor, materials, tools, equipment, and supervision required to provide a one main power transformer (MPT) Main Power Transformer (MPT) – including auxiliary equipment, services, controls, and the required protective devices necessary for safe and efficient operation of the transformer and accessories (Line Item 001) as delineated in the attached specification and drawings. This request for proposal also includes an option to purchase Bushing Monitoring (Line Item 002). The selected Subcontractor shall deliver the quantities specified and in compliance with all requirements in the specification and drawings documents. All equipment will be provided in accordance with the required quality management plan and subject to the specified acceptance criteria. The Subcontractor may not substitute proposed key personnel or production locations named in their proposal without FRA approval. The replacement of key personnel or production location must possess similar characteristics equivalent to or exceeding that of the key personnel or location being replaced.
Files
| File | Type | Posted |
|---|---|---|
| Amendment 03 to RFP UIP-KRS-358654-JK.pdf | ||
| Amendment 02 to RFP UIP-KRS-358654-JK1.pdf | ||
| Amendment 1.zip | ZIP file | |
| RFP - KRS Transformers.zip | ZIP file |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PIP-II booster gmps power supply girder trimming capacitors | Fermi National Accelerator Laboratory | No set-aside | |
| Transformer, power | Land and Maritime | Total Small Business | |
| Transformer, psrl | Land and Maritime | No set-aside | |
| PIP-II ssrs and LB650 vacuum gauge and readout | Fermi National Accelerator Laboratory | No set-aside | |
| Transformer, power | Land and Maritime | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity