Replacement and Reprogramming of existing Crestron System

Closed Solicitation Posted

Solicitation number
1305M224Q0116
Agency
National Oceanic and Atmospheric Administration Department of Commerce
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
J059 Maint/Repair/Rebuild Of Equipment- Electrical And Electronic Equipment Components
Place of performance
Santa Cruz, California, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS), Monterey Bay National Marine Sanctuary, has a requirement for the replacement and reprogramming of their existing Crestron audio-visual control system. The system was originally installed in 2012 and provides media routing, automation, and control for the exhibits and projectors within the center. This solicitation seeks to refresh the backbone of the system to provide building blocks for future upgrades without requiring closure of the center. The contractor must have demonstrated experience with Crestron systems, hold a Certified Technology Specialist-Design (CTS-D) certification, and have experience with remote systems programming and training.

This opportunity is set aside for small businesses. The current incumbent or contractor is not specified. The approximate value of the contract is not stated, but the required hardware components and period of performance from contract award through June 30, 2025 are detailed. The place of performance is the Monterey Bay National Marine Sanctuary visitor center in Santa Cruz, California.

Notice text

The National Oceanic and Atmospheric Administration’s (NOAA), National Ocean Service (NOS), Monterey Bay National Marine Sanctuary, has a requirement for the replacement and reprogramming of their existing Crestron system. The system was originally installed in 2012. The system currently allows for media routing, automation, and control for most of the exhibits and two large screen projectors within the center. This backbone refresh gives the center the building blocks for future upgrades while utilizing existing infrastructure and not requiring closure of the center for a prolonged period of time.

Attachments

Files attached to this notice, newest first
File Type Posted
RFQ 1305M224Q0116.pdf PDF
Contractor Past Performance Reference Sheet.pdf PDF
Redacted Signed Justification.pdf PDF
Crestron SOW.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity