Replace Electrical Vault Doors, Frame and Hardware B150 & B148
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- N400857390922
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Cherry Point, North Carolina 28533, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Naval Facilities Engineering Command is seeking to replace electrical vault doors, frames, and hardware at Buildings 150 and 148 located at Marine Corps Air Station Cherry Point in North Carolina. This solicitation is a restricted procurement limited to four pre-selected Multiple Award Construction Contract (MACC) contractors: T.E. Davis Construction Company, Joyce & Associates Construction Inc., Olympic Enterprises Inc., and Quadrant Construction. The project requires installing two new insulated hollow metal steel doors with specific dimensions and hardware specifications, including Level III doors meeting SDI/DOOR A250.8 standards. Proposals will be evaluated on a lowest-price basis, with responses due by March 11, 2025, at 12:00 PM EST and a request for information (RFI) deadline of February 28, 2025. Contractors must provide necessary security clearances and base access credentials, coordinate work during regular hours (7:00 AM - 3:30 PM Monday-Friday), and comply with specific technical requirements detailed in the project drawings and statement of work.
The contract is set aside as a total small business opportunity within the Commercial and Institutional Building Construction NAICS category. The estimated project value ranges between $25,000 and $100,000, with a 120-day completion period after award. Bonding requirements vary based on the proposal value: no bonds are required under $40,000, a payment bond is needed for $40,000-$149,000, and bid/payment/performance bonds are mandatory for contracts over $150,000. Liquidated damages are set at $36 per calendar day, and the project includes specific wage determination guidelines (NC20250018). Contractors must also certify they will not use forced labor from the Xinjiang Uyghur Autonomous Region. The work will be performed at MCAS Cherry Point, North Carolina, with buildings remaining occupied during construction, and any utility interruptions requiring 15 days advance notice.
Notice text
This procurement is restricted to the M&R MACC contractors. Only the M&R MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings.
Files
| File | Type | Posted |
|---|---|---|
| 7390922 RFP.pdf | ||
| 7390922 Streamlined MACC.pdf | ||
| 7390922 DrawingsAsOne SIGNED.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace Electrical Vault Doors, Frame and Hardware B150 & B148 | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| DB/DBB, IDIQ Multiple Award Construction Contract (MACC) Large Projects Hampton Roads AOR, VA | Naval Facilities Engineering Command | No set-aside | |
| Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina | Naval Facilities Engineering Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity