Replace east lift station - fort pickens
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140P5224B0001
- Agency
- Southeast Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Fort Pickens Area Gulf Breeze, Florida, United States
- Points of contact
-
- Ward, Evans andre_ward@nps.gov (850) 232-4630
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior National Park Service Southeast Region is seeking bids for a firm-fixed-price construction contract to replace the East Lift Station at the Gulf Islands National Seashore in Escambia County, Florida. The work includes demolishing the existing lift station, 50-KW diesel generator, pump control panel, and automatic transfer switch, and installing a new lift station with a fiberglass wet well and 15 horsepower pump, an 80-KW propane generator with 250-gallon tanks, a new pump control panel, and a 200-amp, 240-volt, 3-pole service rated automatic transfer switch. The project will also include site preparation, site improvements, site mechanical utilities, and site electrical utilities. The solicitation is planned to be released on May 17, 2024, with a bid opening on June 18, 2024 and an award on or about July 9, 2024.
This contract opportunity is set aside for small businesses. The estimated price range for this single construction contract is between $500,000 and $1,000,000, with a 120-day performance period tentatively scheduled from July 30, 2024 to November 28, 2024. The final construction drawings (11 sheets) and project specifications (207 pages) are dated June 9, 2023 and June 2, 2023, respectively.
Notice text
PROJECT: REPLACE EAST LIFT STATION - FORT PICKENS
PARK: Gulf Islands National Seashore, Escambia County, Florida
MAGNITUDE: Single FFP construction contract. The Work consists of:
1. Demolish existing lift station and related components; 50-KW diesel generator, pump control panel, and 200-amp, 240 volt, 3-pole automatic transfer switch.
2. Install new lift station with fiberglass wet well and 15 horsepower pump, 80-KW propane generator with 250-gallon propane tanks, pump control panel, and 200-amp, 240 volt, 3-pole service rated automatic transfer switch.
Bid Items include: Site Preparation, Site Improvements, Site Mechanical Utilities. and Site Electrical Utilities
Estimated price range: between $500,000 and $1,000,000
PLANS: FINAL DESIGN (11-SHEETS) JUN 9, 2023
SPECS: FINAL PROJECT SPECIFICATIONS (207-PGS) JUN 2, 2023
Attachments
| File | Type | Posted |
|---|---|---|
| B08_Atch_1_-_PLANS_DWG__635_192070_Final_Construction_Documents_1.pdf | ||
| Synopses_of_Propose_Contract_Action_1.doc | DOC document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| GUIS R5323240008 Replace East Lift Station | Award Notice | |
| Replace fort pickens east lift station | Solicitation | |
| Replace east lift station - fort pickens | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity