Replace and Install High Speed Doors
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA500024Q0300
- Agency
- Pacific Air Forces Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238290 Other Building Equipment Contractors
- Place of performance
- Alaska 99506, United States
- Points of contact
-
- Manuel Granados manuel.granados@us.af.mil (907) 552-4146
- SSgt Cassidy Nieblas cassidy.nieblas@us.af.mil (575) 904-4932
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Pacific Air Forces is seeking a contractor to replace and install high-speed rubber doors at two facilities on Joint Base Elmendorf-Richardson in Anchorage, Alaska. The solicitation requires the removal of existing roll-up doors and installation of a total of six new high-speed doors in varying sizes ranging from 15' x 14' to 24' x 20'. The new doors must meet specific technical requirements such as rubber curtains, variable speed motors, and safety features. The contract will be awarded on a firm-fixed-price basis, and proposals will be evaluated on price and technical acceptability. Quotes are due by August 1, 2024, with a 6-month delivery timeline from the date of award.
This is a total small business set-aside opportunity under NAICS code 238290 with a $22M size standard. The related solicitation number is FA500024Q0300, and the estimated value is not provided. The work is to be performed at the two facilities located on the military base in Anchorage, Alaska. Prevailing wage requirements and government-furnished deliverables have been addressed in the solicitation documents.
Notice text
3 versions
Update #3 · Latest ·
Amendment 0001: The purpose of this amendment is to post the Contractor questions and answers sheet. All quotes are due on 14 August 2024 by 4:00 PM Alaska Daylight Time.
A Site Visit will be conducted on August 1, 2024 at 1:00PM at JBER. The site visit will begin at Building 9361, Snow Barn. If base access is needed, please arrive 30 minutes prior to the Boniface Visitor Center.
The contractor shall provide material and services to include but not limited to the removal of the existing door set to include the locking mechanisms, ensuring not to damage the integrity of the existing wall structure on the interior or exterior of the facility. Replace the two existing rollup doors in Building 8288 with three CSI section 08 34 00 High Speed Doors, (1) 15’ wide x 14’ tall; and (1) 24’ wide x 20’ tall. Replace the three existing rollup doors in Building 9361 with three CSI section 08 34 00 High Speed Doors, (1) 15’ wide x 15’4” tall; (1) 20’ wide x 16’ tall and (1) 24’ wide x 20’ tall. Once doors are removed opening must be secured as to ensure the security of the facility at night. The contractor will be responsible for loading and transporting all debris generated from the removal of the doors and installation of the new doors to and from building 9361 and building 8288. They will properly dispose of the material in accordance with local laws and regulations.
Door Specifications/Requirements:
- CSI Section 08 34 00 High Speed Rubber Door (2) Doors Total, (1) 15’ wide x 14’ tall; and (1) 24’ wide x 20’ tall.
- CSI Section 08 34 00 High Speed Rubber Door (3) Doors Total, (1) 15' wide x 15'4” tall, (1) 20' wide x 16' tall, and (1) 24' wide x 20' tall
- Curtain: Rubber and Black in color. Operation:
- Variable Speed direct-drive AC motor with dynamic braking. Springless design with no counterbalance.
- 3 Phase power exist in current facility.
- System 4 controller with self-diagnostic capabilities in NEMA 4X rated enclosure.
- Release and restore technology after impact (no tools needed).
- Actuators: (1) Remote open/close/stop push buttons.
- Safety equipment; (2) Through beam photo eyes.
- Chain hoist for manual operation.
- Activation: (2) Motions sensors on west end and supply door.
- Radio control: Receiver with (1) button transmitters inside dispatch office.
- Windows: Clear windows 2 for each door.
Update #2 ·
A Site Visit will be conducted on August 1, 2024 at 1:00PM at JBER. The site visit will begin at Building 9361, Snow Barn. If base access is needed, please arrive 30 minutes prior to the Boniface Visitor Center.
The contractor shall provide material and services to include but not limited to the removal of the existing door set to include the locking mechanisms, ensuring not to damage the integrity of the existing wall structure on the interior or exterior of the facility. Replace the two existing rollup doors in Building 8288 with three CSI section 08 34 00 High Speed Doors, (1) 15’ wide x 14’ tall; and (1) 24’ wide x 20’ tall. Replace the three existing rollup doors in Building 9361 with three CSI section 08 34 00 High Speed Doors, (1) 15’ wide x 15’4” tall; (1) 20’ wide x 16’ tall and (1) 24’ wide x 20’ tall. Once doors are removed opening must be secured as to ensure the security of the facility at night. The contractor will be responsible for loading and transporting all debris generated from the removal of the doors and installation of the new doors to and from building 9361 and building 8288. They will properly dispose of the material in accordance with local laws and regulations.
Door Specifications/Requirements:
- CSI Section 08 34 00 High Speed Rubber Door (2) Doors Total, (1) 15’ wide x 14’ tall; and (1) 24’ wide x 20’ tall.
- CSI Section 08 34 00 High Speed Rubber Door (3) Doors Total, (1) 15' wide x 15'4” tall, (1) 20' wide x 16' tall, and (1) 24' wide x 20' tall
- Curtain: Rubber and Black in color. Operation:
- Variable Speed direct-drive AC motor with dynamic braking. Springless design with no counterbalance.
- 3 Phase power exist in current facility.
- System 4 controller with self-diagnostic capabilities in NEMA 4X rated enclosure.
- Release and restore technology after impact (no tools needed).
- Actuators: (1) Remote open/close/stop push buttons.
- Safety equipment; (2) Through beam photo eyes.
- Chain hoist for manual operation.
- Activation: (2) Motions sensors on west end and supply door.
- Radio control: Receiver with (1) button transmitters inside dispatch office.
- Windows: Clear windows 2 for each door.
Update #1 ·
The contractor shall provide material and services to include but not limited to the removal of the existing door set to include the locking mechanisms, ensuring not to damage the integrity of the existing wall structure on the interior or exterior of the facility. Replace the two existing rollup doors in Building 8288 with three CSI section 08 34 00 High Speed Doors, (1) 15’ wide x 14’ tall; and (1) 24’ wide x 20’ tall. Replace the three existing rollup doors in Building 9361 with three CSI section 08 34 00 High Speed Doors, (1) 15’ wide x 15’4” tall; (1) 20’ wide x 16’ tall and (1) 24’ wide x 20’ tall. Once doors are removed opening must be secured as to ensure the security of the facility at night. The contractor will be responsible for loading and transporting all debris generated from the removal of the doors and installation of the new doors to and from building 9361 and building 8288. They will properly dispose of the material in accordance with local laws and regulations.
Door Specifications/Requirements:
- CSI Section 08 34 00 High Speed Rubber Door (2) Doors Total, (1) 15’ wide x 14’ tall; and (1) 24’ wide x 20’ tall.
- CSI Section 08 34 00 High Speed Rubber Door (3) Doors Total, (1) 15' wide x 15'4” tall, (1) 20' wide x 16' tall, and (1) 24' wide x 20' tall
- Curtain: Rubber and Black in color. Operation:
- Variable Speed direct-drive AC motor with dynamic braking. Springless design with no counterbalance.
- 3 Phase power exist in current facility.
- System 4 controller with self-diagnostic capabilities in NEMA 4X rated enclosure.
- Release and restore technology after impact (no tools needed).
- Actuators: (1) Remote open/close/stop push buttons.
- Safety equipment; (2) Through beam photo eyes.
- Chain hoist for manual operation.
- Activation: (2) Motions sensors on west end and supply door.
- Radio control: Receiver with (1) button transmitters inside dispatch office.
- Windows: Clear windows 2 for each door.
Attachments
| File | Type | Posted |
|---|---|---|
| Contractor Question and Answers - Replace and Install High Speed Doors.docx | DOCX document | |
| Buildipedia_CSI 08 34 00 Special Function Doors.docx | DOCX document | |
| Wage Determination.pdf | ||
| Attachment 1 - Pricing Schedule - High Speed Doors.docx | DOCX document | |
| Combo - High Speed Door.docx | DOCX document | |
| Attachment 2 - SOW Replace and Install High Speed.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Replace and Install High Speed Doors | Award Notice | |
| Replace and Install High Speed Doors | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity