Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
Closed Solicitation Posted
- Solicitation number
- W9128F26RA107
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Minot Air Force Base, Minot, North Dakota
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Army Corps of Engineers Engineering District Omaha seeks repair and replacement of Mass Parking Apron Section V at Minot Air Force Base, North Dakota, with proposals due August 27 at 10:00 a.m. Central time. The procurement is restricted to small businesses.
Place of performance is Minot Air Force Base, North Dakota. The project uses design-bid-build delivery and will remove and replace the existing Mass Parking Apron in multiple sections over several years. The work includes establishing a uniform apron width of 340 feet south of the MPA centerline taxiway (correcting a 5-foot difference between the eastern and western halves), installing temporary ACC transitions to connect new PCC pavement to existing pavement, limited turf grading to improve drainage per UFC 3-260-01 Chapter 6, and milling and stockpiling of existing asphalt shoulders for Minot AFB use. Estimated construction costs range from $25,000,000 to $35,000,000. The NAICS code is 237310, Highway, Street, and Bridge Construction; the PSC is Z2BD, Repair or Alteration of Airport Runways and Taxiways. Amendment 0003 revises Section 00 21 00 paragraph 8 and Section 00 22 00 paragraph 1, and removes FAR clause 52.242-4 (Final Indirect Cost Rates). Nine contractors attended the site visit on July 30, 2026.
Notice text
3 versions
Update #3 · Latest ·
Amendment 0003 = 1. Revise Section 00 21 00, paragraph 8. 2. Revise Section 00 22 00, paragraph 1. 3. Remove 52.242-4 Final indirect cost rates Offers will be received until 10:00 am Central 27 August 2026. Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs 340ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Update #2 ·
Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs 340ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Update #1 ·
Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs. 340 ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 inch drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Files
| File | Type | Posted |
|---|---|---|
| Contractors who attended site visit 7.30.26.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| ND OMAD 2025(1) Minuteman Missile Access Road | Federal Highway Administration | Total Small Business | |
| Repair Taxiway Alpha & Bravo - North Auxiliary Airfield | Air Mobility Command | Total Small Business | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| CO OMAD 300(71) Minuteman Missile Access | Federal Highway Administration | Total Small Business | |
| FY26 project WWXT240800 multi-purpose apron and taxiway, royal australian air force (RAAF) base tindal, australia | Naval Facilities Engineering Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity