The Department of the Air Force Pacific Air Forces is seeking a design-build contractor to repair the Wakaba Child Development Center (CDC) through a comprehensive renovation project. The work will be completed in two phases, with Phase I focusing on building B131 including elastomeric roof recoating, replacement of exterior door fixtures and frames, ceiling tiles, float glass conversion to tempered glass, wall and countertop repainting, FRP wainscot installation, plumbing fixture replacements, HVAC ductwork cleaning, and light fixture replacement. Phase II will address the main building B132 with similar exterior and interior improvements, plus specialized work including replacement of adult toilets with child-sized units in the Children Activity Room, kitchen grease duct repairs to address Fire Safety Deficiencies, and replacement of HVAC components nearing end of service life such as condensers, chillers, boilers, and water circulating pumps. The project must integrate sustainable principles and life cycle cost-effective practices in accordance with UFC 1-200-02 High Performance and Sustainable Building Requirements. The pre-solicitation notice was posted on June 16, 2025, with responses due by June 30, 2025.

This opportunity carries no set-aside designation and falls under NAICS code 236220 for Commercial and Institutional Building Construction. The project requires coordination with the 718th Civil Engineer Squadron for on-site safety requirements and cannot commence construction activities until approval of the Environmental Protection Plan and AF Form 103 work clearance. Asbestos-containing materials were found only in wall mortar, requiring appropriate protective equipment when disturbing mortar but no formal abatement procedures. The contractor will need to manage phased construction with Phase II potentially requiring additional sub-phases beyond the main building work. No incumbent contractor, specific award values, or detailed timeline beyond the phasing structure were identified in this pre-solicitation notice. The work scope suggests a substantial renovation project given the comprehensive nature of both interior and exterior improvements across multiple building systems.

Notice text

This project shall accomplish a design-build repair of:
 Work for the addition shall be completed in Phase I, B131, includes recoat roof with elastomeric
roofing, replace rusted exterior door fixtures and frames, replace ceiling tiles, replace all float glass
with tempered glass, repaint wall and countertop, install FRP wainscot, replace corroded flush
valves and faucets, clean HVAC ductworks, replace diffuser, and replace rusted light fixtures.
Work area has been tested for Asbestos-Containing Materials (ACM)/Lead-Based Paint (LBP) and
only found asbestos in the wall mortar, so no ACM/LBP abatement is needed but workers shall
wear appropriate protective equipment if work involves disturbing the mortar.
 Repair the Wakaba Child Development Center (CDC), B132 shall be completed in Phase II and
may require additional phasing. Work for the main building, B132, includes demolish front
entrance metal grating door mat, replace rusted exterior door fixtures and frames, replace all float
glass with tempered glass, repaint wall and countertop, install Fiberglass Reinforced Panel (FRP)
wainscot, replace Children Activity Room (CAR) adult size toilets with children size toilets,
replace corroded flush valves and faucets, repair kitchen grease duct to correct Fire Safety
Deficiency (FSD), clean HVAC ductworks, replace diffuser, and replace all HVAC components
that are near the end of their service life such as the condenser, chiller, boiler, and water circulating
pumps.
Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable
principles, to include life cycle cost- effective practices shall be integrated into the design, development, and
construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and
Sustainable Building Requirements.
Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF
Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th
Civil Engineer Squadron (718 CES).

Notice history

Notice Type Posted
Repair wakaba CDC Latest solicitation Solicitation
This notice Pre-Solicitation
Repair wakaba CDC Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity