Repair Maintenance Facility Lift Station at Garrison Dam, ND

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9128F20Q0073
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Riverdale ND 58565 USA

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Question and Answer Posted.

Amendment 0002 is posted along with updated Questions and Answers. 

Amendment 0001 is posted.

Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. Once demolition is complete, the inlet/outlet connections and the basin should remain.  Contractor is responsible for supplying the new duplex lift station system that meets the original design criteria and installation.  New components of the system should include pumps, stainless steel guide rail system, stainless steel lifting chains, biological blocks, etc.

Completion date is 270 days after Notice to Proceed.

Update #2 ·

Amendment 0002 is posted along with updated Questions and Answers. 

Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. Once demolition is complete, the inlet/outlet connections and the basin should remain.  Contractor is responsible for supplying the new duplex lift station system that meets the original design criteria and installation.  New components of the system should include pumps, stainless steel guide rail system, stainless steel lifting chains, biological blocks, etc.

Completion date is 270 days after Notice to Proceed.

Update #1 ·

Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. Once demolition is complete, the inlet/outlet connections and the basin should remain.  Contractor is responsible for supplying the new duplex lift station system that meets the original design criteria and installation.  New components of the system should include pumps, stainless steel guide rail system, stainless steel lifting chains, biological blocks, etc.

Completion date is 270 days after Notice to Proceed.

Files

Show all 11

Notice history

Notice Type Posted
Repair Maintenance Facility Lift Station at Garrison Dam, ND Award Award Notice
This notice Latest solicitation Solicitation
Repair Maintenance Facility Lift Station at Garrison Dam, ND Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors