Repair Maintenance Facility Lift Station at Garrison Dam, ND
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F20Q0073
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Riverdale ND 58565 USA
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Question and Answer Posted.
Amendment 0002 is posted along with updated Questions and Answers.
Amendment 0001 is posted.
Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. Once demolition is complete, the inlet/outlet connections and the basin should remain. Contractor is responsible for supplying the new duplex lift station system that meets the original design criteria and installation. New components of the system should include pumps, stainless steel guide rail system, stainless steel lifting chains, biological blocks, etc.
Completion date is 270 days after Notice to Proceed.
Update #2 ·
Amendment 0002 is posted along with updated Questions and Answers.
Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. Once demolition is complete, the inlet/outlet connections and the basin should remain. Contractor is responsible for supplying the new duplex lift station system that meets the original design criteria and installation. New components of the system should include pumps, stainless steel guide rail system, stainless steel lifting chains, biological blocks, etc.
Completion date is 270 days after Notice to Proceed.
Update #1 ·
Work consists of removing the old duplex lift station system including pumps, guide rail system, floats, control panel, etc. The contractor is responsible for disposal per all state and federal laws. Once demolition is complete, the inlet/outlet connections and the basin should remain. Contractor is responsible for supplying the new duplex lift station system that meets the original design criteria and installation. New components of the system should include pumps, stainless steel guide rail system, stainless steel lifting chains, biological blocks, etc.
Completion date is 270 days after Notice to Proceed.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repair Maintenance Facility Lift Station at Garrison Dam, ND | Award Notice | |
| This notice | Solicitation | |
| Repair Maintenance Facility Lift Station at Garrison Dam, ND | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity