Q&A – Solicitation W9128F20Q0073
1. Are bid bonds required?
a. Bid binds are not required for submission.
2. Will you accept a Tripartite Escrow Agreement in lieu of Bonding?
a. No substitutions are allowed, a payment bond will be required within 10 calendar days of award.
3. Can you please clarify if grinder pumps or non clog solids handling pumps are required for this project?
a. Grinder units as stated in Section 33 32 13.13, Paragraph 2.1 – 1st paragraph, page 4. See also Section 33 32 13.13, Para 2.1.1.1b – Impellers.
4. In order to meet the flow requirements, we will have to quote a 30hp motor. Is this acceptable?
a. The pump shall meet the design requirements set forth in Section 33 32 13.13, Part 2.1 and 2.1.1. Pumps less than or equal to 20hp in size are acceptable.
Pumps larger than 20hp are unacceptable as a result of power distribution limits.
5. Did you have the site visit on August 13th? If not, will there be one or can one be requested?
a. We never had the site visit scheduled for 13 August, but Amendment 0001 changed the site visit to 2 September 2020.
6. What was the solicitation number previously for this project?
a. The previous solicitation number was W9128F19Q0132