Repair King Drive - Grade and Pave
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W519TC25RA012
- Agency
-
ACC Rock Island
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Rock Island, Illinois 61299, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Contracting Command Rock Island Arsenal (ACC Rock Island) is preparing to solicit bids for a comprehensive road and infrastructure improvement project at the Rock Island Arsenal in Illinois. The project involves regrading and paving King Drive, spanning approximately 1,855 feet from the Rodman Avenue intersection to the Blunt Road area. Key contract requirements include removing existing Hot Mix Asphalt (HMA) pavement, eliminating Portland Cement Concrete islands, and establishing a new 10-foot HMA shared use path. The solicitation is anticipated to be released soon, with a current pre-solicitation notice posted on June 5, 2025, and a response deadline of June 20, 2025. While specific evaluation criteria are not detailed in the pre-solicitation notice, the project appears to prioritize infrastructure enhancement and mobility improvements in preparation for a future campground development.
The contract is designated as a Total Small Business set-aside, targeting businesses in the Highway, Street, and Bridge Construction NAICS category (237310). The project's magnitude is estimated between $1,000,000.00 and $5,000,000.00, with performance and payment bonds required. The scope of work includes relocating the King Drive and Rodman Avenue intersection approximately 350 feet west, creating a new exit lane for campground vehicles, and reconstructing a portion of Blunt Road extending 335 feet east from the King Drive intersection. The project aims to improve vehicular mobility and infrastructure for larger vehicles in the area, specifically in preparation for a future campground development. Contractors interested in this opportunity should be prepared to demonstrate expertise in road construction, grading, and infrastructure modifications in a military arsenal setting.
Notice text
This is a notice that a solicitation is anticipated to be forth coming and will have all necessary documents, including a scope of work.
IAW FAR 36.204(f), the magnitude of this project is between $1,000,000.00 and $5,000,000.00.
Performance and Payment Bonds are required.
This project consists of the regrading and paving of King Drive from the intersection of Rodman Avenue and ending approximately 1,855 feet west of the Blunt Road intersection, on the Rock Island Arsenal, Rock Island, Illinois. The scope includes removing the existing Hot Mix Asphalt (HMA) pavement on King Drive according to the location mentioned above. Removing the existing Portland Cement Concrete (P.C.C.) islands on Rodman Avenue adjacent to Building 187 and removing approximately 550 feet of the existing HMA trail adjacent to Rodman Avenue near the existing intersection of King Drive and Rodman Avenue. The project shall include relocating the intersection of King Drive and Rodman Avenue approximately 350 feet west. A new exit lane shall be established on the west side of King Drive with the intent of campground vehicles and patrons to turnaround and exit the island. A new 10-foot HMA shared use path shall be established along the existing alignment of King Drive. The path shall terminate at Blunt Road. A portion of Blunt Road shall be reconstructed. The reconstruction shall begin at the intersection of King Drive and Blunt Road and terminate approximately 335 feet east of the intersection. This project is being constructed in coordination with a future campground to be built later. The new road is intended to increase the mobility of larger vehicles in the area in relation to the campground.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Repair King Drive - Grade and Pave | Award Notice | |
| Repair King Drive - Grade and Pave | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation | ENDIST Rock Island | Competitive 8(a) | |
| Granite Surface Plate Calibration and lapping - with Q&As | ACC Rock Island | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity