Repair Interior Renovation Bldg 90131

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA441725R0004
Agency
Air Force Special Operations Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2BZ Repair Or Alteration Of Other Airfield Structures
Place of performance
Hurlburt Field, FL 32544
Points of contact
More information

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Special Operations Command is seeking a small business contractor to complete an interior renovation of Building 90131 at Hurlburt Field, Florida. The project involves comprehensive renovation and structural modifications to create office and workspace for the 2nd Special Operations Facility. Specific work includes sitework such as installing a new concrete sidewalk and bollards, constructing a second-floor mezzanine with structural steel, and performing extensive interior demolition and reconstruction. The solicitation requires proposers to submit three-volume proposals covering technical capabilities, past performance, and cost/price by May 2, 2025. Proposals must be submitted through the PIEE Solicitation Module, with hand-carried or mailed disks accepted, while electronic emails and hard copies are prohibited.

The contract is designated as a 100% Small Business Set-Aside under NAICS Category 236220 for Commercial and Institutional Building Construction. The renovation will transform approximately 20,000 square feet of interior space, including new restrooms, a briefing room, break room, open office areas, private offices, fitness room, personnel lockers, and two resting/bunk rooms. Interior finishes will include luxury vinyl tile flooring, modular carpet tiles, thermoset rubber wall base, and porcelain tile in specific areas. The project is located at Hurlburt Field in Florida, with a site visit already conducted on February 19, 2025, which was attended by approximately 70 potential contractors. Currently, funds for the contract are pending appropriation, and base entry will require 72-hour advance notice for contractor access.

Notice text

6 versions

Update #6 · Latest ·

18 Apr 2025 Amendment 0004 - Incorporate Addendum 001 which includes amended Drawings, amended Specifications, Site Visit Questions (RFIs) and Government Responses. Amendment 0004 also extends the Proposal Due date from 24 Apr 2025 to 2 May 2025 @ 1200 hrs CST. 24 Mar 2025 Amendment 0003 - Update Wage Determination 20250217 dated 14 Mar 2025 and Extend proposal due date to 24 Apr 2025. - 17 Mar 2025 Amendment 0002 - Add/Delete Deviation Clauses and Extend proposal due date. - 14 Feb 2025 - Amendment 0001 - Site Visit location update - Meet at Bldg 90131.UPDATE to Draft Solicitation, Drawings and Specifications for project Repair Interior Renovation of Bldg 90131 (Attached). The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.

Update #5 ·

18 Apr 2025 Amendment 0004 - Incorporate Addendum 001 which includes amended Drawings, amended Specifications, Site Visit Questions (RFIs) and Government Responses. Amendment 0004 also extends the Proposal Due date from 24 Apr 2025 to 2 May 2025 @ 1200 hrs CST. 24 Mar 2025 Amendment 0003 - Update Wage Determination 20250217 dated 14 Mar 2025 and Extend proposal due date to 24 Apr 2025. - 17 Mar 2025 Amendment 0002 - Add/Delete Deviation Clauses and Extend proposal due date. - 14 Feb 2025 - Amendment 0001 - Site Visit location update - Meet at Bldg 90131.UPDATE to Draft Solicitation, Drawings and Specifications for project Repair Interior Renovation of Bldg 90131 (Attached). The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.

Update #4 ·

- 24 Mar 2025 - Amendment 0003 - This amendment updates Attachment 0003 Wage Determination to General Decision Number FL20250217 dated 03/14/2025.  The amendment also changes the proposal due date from 4 Apr 2025 to 24 Apr 2025.  RFI questions from the Pre-Proposal Site visit are still being evaluated and will be posted in the near future.  

- 17 Mar 2025 - Amendment 0002 - This amendment included updates to solicitation/contract clauses and provisions based on recent executive orders.  Amendment 0002 also changes the proposal submission date from 24 Mar 2025 to 4 Apr 2025.  No other changes.

- 14 Feb 2025 - Amendment 0001 - Site Visit location update - Meet at Bldg 90131.UPDATE to Draft Solicitation, Drawings and Specifications for project Repair Interior Renovation of Bldg 90131 (Attached). The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.

Update #3 ·

- 14 Feb 2025 - Amendment 0001 - Site Visit location update - Meet at Bldg 90131.UPDATE to Draft Solicitation, Drawings and Specifications for project Repair Interior Renovation of Bldg 90131 (Attached). The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.

Update #2 ·

20 Feb 2025 - Uploaded Site Visit Briefing and attendee sign-in sheet.

- 14 Feb 2025 - Amendment 0001 - Site Visit location update - Meet at Bldg 90131.UPDATE to Draft Solicitation, Drawings and Specifications for project Repair Interior Renovation of Bldg 90131 (Attached). The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.

Update #1 ·

UPDATE to Draft Solicitation, Drawings and Specifications for project Repair Interior Renovation of Bldg 90131 (Attached). The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.

Attachments

Files attached to this notice, newest first
File Type Posted
Site Visit Brief and Sign In Sheet.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Repair Interior Renovation Bldg 90131 Award Award Notice
Repair Interior Renovation Bldg 90131 This notice · Latest solicitation Solicitation
Draft: Original Special Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity