Repair Interior Ceiling Building 224

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
FA527025R0009
Agency
Responses due
Set-aside
Local Area Set-Aside

Opportunity facts

Place of performance
96863 Japan

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Pacific Air Forces is seeking a design-build contractor to repair the interior ceiling of Building 224 at a specific location. The project involves comprehensive renovation work, including full asbestos-containing material (ACM) abatement, ceiling paint repair, and addressing structural spalls and cracks. Contractors will be responsible for site preparation, which includes temporarily removing suspended ceilings, lighting systems, alarms, electrical wiring, and ceiling-mounted air conditioning units. The project requires compliance with sustainable design principles outlined in UFC 1-200-02 and adherence to US federal, Department of Defense, Air Force, and local Japanese regulatory requirements. The solicitation (NOTICE ID FA527025R0009) is currently in pre-solicitation phase, with proposal responses due by April 2, 2025, and contractors must coordinate on-site safety requirements through the 718th Civil Engineer Squadron.

The opportunity is designated as a Local Area Set-Aside and falls under the Commercial and Institutional Building Construction NAICS category (236220). The project scope involves comprehensive environmental and construction work, with contractors expected to determine the most technically appropriate design solution while managing potential hazardous material removal. Construction activities can only commence after approval of the Environmental Protection Plan and AF Form 130 Work Clearance. The project emphasizes a holistic approach to facility renovation, requiring contractors to provide a fully functional and complete final product that meets all specified government standards. While specific award value is not disclosed, the complexity of the work, including ACM abatement and comprehensive site restoration, suggests a significant and detailed contractual engagement.

Notice text

The purpose of this notice is to notify everyone that the NOTICE ID number for this requirement will change to NOTICE ID number FA527025R0009 for solicitation posting.

This project shall consist of but not limited to providing all field investigations, surveys,
design, plant, labor, materials, equipment, supplies, transportation, third-party services, and 
incidental related work to design and execute construction work defined in this Statement of Work 
and the attached documents. The work includes all necessary finishing work to provide the 
Government with a final product that is fully functional and leaves no areas of the facility that 
appear incomplete or unfinished.

This project shall accomplish a design-build repair the true ceiling of B224. Work includes 
full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and 
cracks. Include any site preparation work such as temporary removal of the suspended ceiling, 
lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit. 
Sustainable principles, to include life cycle cost- effective practices, will be integrated into 
the design, development, and construction of the project in accordance with UFC 1-200-02, High 
Performance and Sustainable Building Requirements.

The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or 
other hazardous building materials.

The Contractor shall determine the best technical design solution in conformance with current 
regulations. The design and construction work shall comply with US federal, Department of Defense, 
Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not 
specifically stated elsewhere in this project statement of work to provide a complete and usable 
facility upon completion. The detailed Scope of Work is described here-in below and the attached supporting documents.

Construction activities may commence after the approval of the Environmental Protection Plan 
(EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements 
through 718th Civil Engineer Squadron (718 CES)
 

Notice history

Notice Type Posted
Repair interior ceiling, B224 Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
P530 Aircraft Intermediate Maintenance Facility, Kadena Air Base, Okinawa, Japan Kadena Air Base Okinawa Japan · NAICS 236220 ENDIST Japan No set-aside
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Repair Aeronautics Laboratory - USAFA Aeronautics Laboratory, Usaf AcademyColorado Springs, Colorado 80840 · NAICS 236220 ENDIST Omaha No set-aside
Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB Barksdale AFB, Louisiana 71110, United States · NAICS 236220 ENDIST Fort Worth No set-aside
Vehicle Maintenance Shop, Kadena Air Base, Okinawa, Japan Kadena Air Base, Okinawa, Japan · NAICS 236220 ENDIST Japan No set-aside