Repair Floor Coating B#2348, Suwon AB (MATOC ONLY)
Award Notice Posted
- Solicitation number
- W90VN618R0017
- Agency
-
RCO Osan 411th CSB
Expeditionary Contracting Command, Department of Defense
- Awarded
- to Gun-Hae Construction Co.ltd
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W91QVN-18-D-0059-W90VN618F0086 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Suwon, Korea, South
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features:
0001. PHASE PLAN
1. The renovation of this building will be phased to support minimal mission messing requirements. Phase 1 (refer to drawing # 3) will be released for renovation first. Steps shall be taken to prevent dirt/debris/noise from construction activities for remaining area. After Phase 1 is finished, Phase 2 will be released for renovation.
0002. ARCHITECTURAL WORK
A. REMOVAL WORK / INTERIOR FINISH
1. Repair any damaged concrete floor and provide new conc sealer.
2. Repair any damaged concrete floor joint.
3. Provide non-slip broom finish.
4. Repaint existing parking line.
Update #1 ·
PRINCIPAL FEATURES: This project includes, but shall not be limited to the following principal features:
0001. PHASE PLAN
1. The renovation of this building will be phased to support minimal mission messing requirements. Phase 1 (refer to drawing # 3) will be released for renovation first. Steps shall be taken to prevent dirt/debris/noise from construction activities for remaining area. After Phase 1 is finished, Phase 2 will be released for renovation.
0002. ARCHITECTURAL WORK
A. REMOVAL WORK / INTERIOR FINISH
1. Repair any damaged concrete floor and provide new conc sealer.
2. Repair any damaged concrete floor joint.
3. Provide non-slip broom finish.
4. Repaint existing parking line.
2. Install new GCWT wall finish with metal lath, latex mortar and grout as shown on the drawings.
3. Install new wall base finish with rubber cove base as shown on the drawings.
4. Repaint and apply latex, oil, alkyd, epoxy paint as shown on interior finish schedule.
D. MISCELLANEOUS WORK
1. Install new toilet accessories including toilet & urinal partitions, mirror glass, towel bar, shower curtains w/rods, soap dishes, toilet tissue dispensers, paper towel dispenser/waste receptacles, grab bars, soap dispensers, mop racks, shower benches and etc as shown on attached drawings.
2. Apply sealant or seal for doors and windows.
Files
| File | Type | Posted |
|---|---|---|
| SF30.pdf | ||
| Drawings.pdf | ||
| W90VN618R0017.pdf | ||
| Suwon_Air_Base_EAL.xls | XLS spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity