Project Location

FORM

FEB 74

Main Gate

CODE IDENT NO.AIR FORCE AUTHENTICATION

AIR FORCE RELEASE

ENG

CHK

DR

SIZE

SCALE

TITLE

DRAWING NO

SHEET OF

DATE

NONE 3 4

SIN, Y,I

Kang, S,W

Yi, C,H

PHASING PLAN

- After constructing PHASE 1, construct PHASE 2.

MOVING PLAN

- Existing Container A and B shall be removed and reinstalled by the construction contractor.

- The contractor shall be taken to prevent dirt/debris/noise from construction activities during phase 1 and phase 2.

Container A

PHASE 1 PHASE 2

Container B

Minimize dirt/debris/noise Submit shop drawings for minimizing dirt/debris/noise before work

A-101

CODE IDENT NO.AIR FORCE AUTHENTICATION

AIR FORCE RELEASE

ENG

CHK

DR

SIZE

SCALE

TITLE

DRAWING NO

SHEET OF

DATE

NONE 4 4

SIN, Y,I

Kang, S,W

Yi, C,H

Architectural Work

- Repair any damaged concrete floor and provide new conc sealer

Moving Plan

- Existing Container A and B shall be removed and reinstalled by the construction contractor.

- Repair any damaged concrete floor joint

Container A

Container B

- Provide non-slip finish

- Repaint existing parking line

REFER TO OMA STANDARD DRAWINGS FOR THE DETAILS AND SUBMIT SHOP DRAWINGS

A-102