Drawings.pdf
PDF 631 KB Posted
- Solicitation number
- W90VN618R0017
About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30.pdf | ||
| W90VN618R0017.pdf | ||
| Suwon_Air_Base_EAL.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Location
FORM
FEB 74
Main Gate
CODE IDENT NO.AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
DRAWING NO
SHEET OF
DATE
NONE 3 4
SIN, Y,I
Kang, S,W
Yi, C,H
PHASING PLAN
- After constructing PHASE 1, construct PHASE 2.
MOVING PLAN
- Existing Container A and B shall be removed and reinstalled by the construction contractor.
- The contractor shall be taken to prevent dirt/debris/noise from construction activities during phase 1 and phase 2.
Container A
PHASE 1 PHASE 2
Container B
Minimize dirt/debris/noise Submit shop drawings for minimizing dirt/debris/noise before work
A-101
CODE IDENT NO.AIR FORCE AUTHENTICATION
AIR FORCE RELEASE
ENG
CHK
DR
SIZE
SCALE
TITLE
DRAWING NO
SHEET OF
DATE
NONE 4 4
SIN, Y,I
Kang, S,W
Yi, C,H
Architectural Work
- Repair any damaged concrete floor and provide new conc sealer
Moving Plan
- Existing Container A and B shall be removed and reinstalled by the construction contractor.
- Repair any damaged concrete floor joint
Container A
Container B
- Provide non-slip finish
- Repaint existing parking line
REFER TO OMA STANDARD DRAWINGS FOR THE DETAILS AND SUBMIT SHOP DRAWINGS
A-102
| Drawings 1 |
| Drawings 2 |
| Drawings 3 |
| Drawings 4 |