REPAIR FIRE ALARM & DETECTION AND MNS SYSTEM, B995 AT OSAN AB (MATOC Work Plan only)
Closed Solicitation Posted
- Solicitation number
- W90VN6-25-R-015
- Agency
-
Army Contracting Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Korea, South
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Army Contracting Command is seeking proposals for repairing the fire alarm, detection, and mass notification system at Building 995 on Osan Air Base in South Korea. This solicitation (W90VN6-25-R-015) is exclusively available to Multiple Award Task Order Contract (MATOC) Work Plan contractors in Area III. The contract requires contractors to provide 100% design plans, installation of a new combined addressable system, and compliance with specific standards including NFPA 70, 72, 90A, and 101. Evaluation criteria will focus on design data submittal, pricing proposal completeness, and tax exemption documentation, with the award going to the responsible offeror submitting the lowest-price acceptable offer. A mandatory site visit is scheduled for May 13, 2025, at 0900 hours, with a maximum of two attendees per offeror, and electronic proposals must be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module by 1300 hours on the closing date of June 10, 2025.
The solicitation does not have a specific set-aside designation and is part of a project with a contract value between $250,000 and $500,000. The performance period is from July 15, 2025, to July 15, 2026, with contractors required to begin work within 10 calendar days of receiving the notice to proceed and complete the entire project within 300 calendar days. The project will take place at the disaster preparedness building on Osan Air Base, which currently accommodates 24 people and requires monitoring of existing sprinkler and HVAC systems by the new control panel. Contractors must submit comprehensive technical documentation in PDF format, including site plans, electrical diagrams, fire protection plans, and sequence of operation matrices. The project involves removing the existing separated fire alarm and mass notification system and installing a new combined addressable system that matches the existing fire sprinkler system infrastructure.
Notice text
3 versions
Update #3 · Latest ·
- MATOC Work Plan contractors only in Area III, Osan AB and Suwon AB, Korea.
- See attached Solicitation, SOW, Drawings, Paticular Specification and Submittal Register.
- Please click the below linked site of PIEE Module and use changed method of submission to PIEE Solicitation Module.
Update #2 ·
- MATOC Work Plan contractors only in Area III, Osan AB and Suwon AB, Korea.
- See attached Solicitation, SOW, Drawings, Paticular Specification and Submittal Register.
- Please click the below linked site of PIEE Module.
Update #1 ·
- MATOC Work Plan contractors only in Area III, Osan AB and Suwon AB, Korea.
- See attached Solicitation, SOW, Drawings, Paticular Specification and Submittal Register.
Files
| File | Type | Posted |
|---|---|---|
| Particular Specification 3.pdf | ||
| Particular Specification 2.pdf | ||
| Particular Specification 1.pdf | ||
| Particular Specification 4.pdf | ||
| Solicitation - W90VN625RA015.pdf | ||
| Statement of Wark.pdf | ||
| Drawing SMYU25-1011.pdf | ||
| Submittal Register.pdf |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity