Repair Cracks and Spalling B 43430
Closed Solicitation Posted
- Solicitation number
- FA527025R0020
- Agency
-
Pacific Air Forces
Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- Place of performance
- Kadena Air Base, Okinawa Japan Kadena Air Base Okinawa 96368 Japan
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Pacific Air Forces is seeking contractors to repair structural damage to Building 43430, including cracks and spalling on concrete walls, beams, columns, roof, floor slab, and eaves. The comprehensive repair project requires installation of concrete jackets along column gridlines and roof beams, restoration of corroded steel members, application of Fiber Reinforced Polymer (FRP) to canopy beams and slabs, and abatement and disposal of asbestos containing materials and lead-based paint. Contractors must demonstrate five years of past performance in relevant projects and coordinate safety requirements through the 718th Civil Engineer Squadron. The solicitation has been amended twice, with the proposal due date extended to July 23, 2025, at 2:00 PM JST, and several submission requirements modified including removal of the bid guarantee requirement and past performance questionnaires in favor of CPAR information. Construction activities can only commence after approval of the Environmental Protection Plan and AF Form 103 work clearance, with sustainable principles integrated per UFC 1-200-02.
This solicitation does not utilize any set-aside designations and is open to full and open competition. The work will be performed at a facility located in Kadena, Okinawa, Japan, specifically at coordinates 9Q5C+JW, Higashi, Kadena, Nakagami District, Okinawa. The project falls under NAICS code 238110 for Poured Concrete Foundation and Structure Contractors and PSC code Z2JZ for Repair or Alteration of Miscellaneous Buildings. The solicitation notice does not specify award values, contract duration, or identify any incumbent contractors. Proposals must remain valid for 69 calendar days following submission, and contractors will be required to coordinate closely with the 718th Civil Engineer Squadron throughout the project execution phase.
Notice text
4 versions
Update #4 · Latest ·
Amendment 0002: The purpose of this amendment is as follows:A) Extend the proposal due date to July 23, 2025, at 2:00 PM (JST). This aligns with the date posted on the Government Point of Entry.B) Revise the proposal validity period to 69 calendar days. Block 13d is hereby changed to reflect this.C) Amend Section L regarding financial statements. The requirement to submit financial statements with the proposal is removed. Financial statements may be requested later to determine responsibility per FAR 9.104-1.D) Amend Sections L and M regarding past performance. The requirement for Past Performance Questionnaires is removed. Offerors will now submit CPAR information for recent and relevant projects. The PPQ attachment has been removed to reflect this change.E) Amend Sections L and M regarding proposal summary and table of contents. The requirement for a concise summary and master table of contents is removed.F) A Bid Guarantee is no longer required and reflected in block 13bG) Removal of clause FAR 52.228-1 Bid Guarantee.H) No other changes at this time.NOTE: Refer to Sections L and M for further details on proposal submission changes.Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation. For questions regarding this amendment, contact Emily Rubino at 315-634-1833 / emily.rubino@us.af.mil.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).Proposals must be submitted no later than 23 July 2025, 1400 (2:00pm) JST.
Update #3 ·
Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation. For questions regarding this amendment, contact Emily Rubino at 315-634-1833 / emily.rubino@us.af.mil.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
Update #2 ·
Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
Update #1 ·
Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Repair Cracks and Spalls, B43430 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Vehicle Maintenance Shop, Kadena Air Base, Okinawa, Japan | ENDIST Japan | No set-aside | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| P530 Aircraft Intermediate Maintenance Facility, Kadena Air Base, Okinawa, Japan | ENDIST Japan | No set-aside | |
| Commercial Solutions Opening - Kadena Air Base, Japan | Pacific Air Forces | No set-aside | |
| Renovate military family housing tower 4511, camp courtney | ENDIST Japan | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity