This abstract of offers is for the renovation of the Rodriguez Child Development Center at Fort Bragg, North Carolina. The project objectives include demolishing the existing grass surface and renovating the 20,833 square foot building, including repairing the roof, replacing exterior and interior partitions, and installing new interior finishes and restrooms. Eight contractors submitted bids by the October 30th deadline ranging from $6.3 million to $9.3 million. The government estimate was $7.17 million. The apparent low bidder was New Dominion Construction LLC at $6.3 million, which is 12% below the independent government estimate. The other bidders and their bids included Atlantic Marine Construction Co. Inc. at $6.46 million, Brantley Construction LLC at $7.36 million, Federal Construction Inc. at $7.25 million, Seawolf Construction Web, LLC at $7.63 million, Compass Group Inc. at $9.32 million, and WB Bawley Construction at $7.33 million. The solicitation was a 100% small business set-aside issued by the Department of the Army Corps of Engineers Savannah District for the renovation of the child development center building at Fort Bragg, North Carolina.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Issues Date Opened Page of Pages 15-May-20 30-Oct-20 1 1 Name & Title of Certifying Official (Type)

Signature Date Signed

Bid Bond 20% Bid Bond 20% Bid Bond 20% Bid Bond 20% Bid Bond 20% Bid Bond 20% Bid Bond 20% Bid Bond 20%

Item Number Description of Offered Item Estimated

Quantity Unit Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount Unit Price Estimated Amount

0001 Base - Rodriguez Child Development Center (CDC) Building B-7033 Renovation 1 Job 5,938,944.00$ 5,938,944.00$ 5,391,390.00$ 5,391,390.00$ 6,075,000.00$ 6,075,000.00$ 5,849,000.00$ 5,849,000.00$ 5,295,779.00$ 5,295,779.00$ 5,935,500.00$ 5,935,500.00$ 7,598,000.00$ 7,598,000.00$ 6,086,000.00$ 6,086,000.00$ 5,855,705.00$ 5,855,705.00$

0002 Option 1 - Rodriguez Child Development Center (CDC), Roof Replacement 1 Job 252,538.00$ 252,538.00$ 808,500.00$ 808,500.00$ 953,200.00$ 953,200.00$ 1,012,917.00$ 1,012,917.00$ 541,060.00$ 541,060.00$ 995,000.00$ 995,000.00$ 815,000.00$ 815,000.00$ 749,300.00$ 749,300.00$ 845,055.00$ 845,055.00$

0003 Option 1 - Rodriguez Child Development Center (CDC), Provide & Install Fire Suppression System 1 Job 333,122.00$ 333,122.00$ (126,790.00)$ (126,790.00)$ (83,000.00)$ (83,000.00)$ (109,000.00)$ (109,000.00)$ $0.00 $0.00 145,000.00$ 145,000.00$ 390,000.00$ 390,000.00$ 5,800.00$ 5,800.00$ (27,035.00)$ (27,035.00)$

0004 Option 2 - Rodriguez Child Development Center (CDC), New Sidewalks and landscaping 1 Job 27,093.00$ 27,093.00$ 59,300.00$ 59,300.00$ 44,800.00$ 44,800.00$ 160,052.00$ 160,052.00$ 54,128.00$ 54,128.00$ 27,000.00$ 27,000.00$ 45,000.00$ 45,000.00$ 53,900.00$ 53,900.00$ 51,785.00$ 51,785.00$

0005 Option 3 - Rodriguez Child Development Center (CDC), New Handicapped Spaces 1 Job 22,131.00$ 22,131.00$ 44,560.00$ 44,560.00$ 26,300.00$ 26,300.00$ 38,312.00$ 38,312.00$ 23,855.00$ 23,855.00$ 5,000.00$ 5,000.00$ 40,000.00$ 40,000.00$ 36,600.00$ 36,600.00$ 33,255.00$ 33,255.00$

0006 Option 4 - Rodriguez Child Development Center (CDC), Provide & Install Cubbies & Cubby Coat Hooks 1 Job 29,266.00$ 29,266.00$ 26,090.00$ 26,090.00$ 38,400.00$ 38,400.00$ 61,200.00$ 61,200.00$ 35,100.00$ 35,100.00$ 65,000.00$ 65,000.00$ 70,000.00$ 70,000.00$ 45,700.00$ 45,700.00$ 109,995.00$ 109,995.00$

0007 Option 5 - Rodriguez Child Development Center (CDC), Provide & Install Kitchen Equipment 1 Job 184,755.00$ 184,755.00$ 199,990.00$ 199,990.00$ 162,000.00$ 162,000.00$ 117,577.00$ 117,577.00$ 222,480.00$ 222,480.00$ 310,000.00$ 310,000.00$ 175,000.00$ 175,000.00$ 250,900.00$ 250,900.00$ 185,975.00$ 185,975.00$

0008 Option 6 - Rodriguez Child Development Center (CDC), Provide & Install Security System/CCTV 1 Job 23,027.00$ 23,027.00$ 59,050.00$ 59,050.00$ 146,700.00$ 146,700.00$ 117,979.00$ 117,979.00$ 145,330.00$ 145,330.00$ 147,000.00$ 147,000.00$ 187,000.00$ 187,000.00$ 98,100.00$ 98,100.00$ 115,895.00$ 115,895.00$

6,810,876.00$ 6,462,090.00$ 7,363,400.00$ 7,248,037.00$ 6,317,732.00$ 7,629,500.00$ 9,320,000.00$ 7,326,300.00$ 7,170,630.00$

-5% 0.081123779 6% -7% 12% 37% 8% 5%

(348,786.00)$ 552,524.00$ 437,161.00$ (493,144.00)$ 818,624.00$ 2,509,124.00$ 515,424.00$ 359,754.00$

Amendments Acknowledged

Offeror No. 4

Bid Security (Type and Amount)

Compass Group Inc.

“Source Selection Information -- See FAR 2.101 and 3.104.”

Offeror No. 1

Contracting Officer

W912HN20B4004

Department of the Army, Corps of Engineers

Abstract of Offers - Construction

Offeror No. 2

Solicitation Number:

Issuing Office:

Project Title:

I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.Savannah District Contracting Office

100 W Oglethorpe Ave.

Savannah, GA 31401

Magdalena Bernard

$ Difference from IGE:

Type in Bottom Number during Opening:

Number of Amendments Issued:

Renovation of Rodriguez CDC, Building B-7033 Project Number: FA-11005-14

Fort Bragg, NC

Reasonable Contract (Without Profit)

X

100% Small Business Set-Aside - Sealed Bid

Reasonable Contract (Including Profit )

Hired Labor

% Difference from IGE:

Atlantic Marine Construction Co. Inc. Brantley Construction LLC

Total Amount of CLINS:

Amendments AcknowledgedAmendments Acknowledged

Government Estimate

Bid Security (Type and Amount)

Amendments Acknowledged

Offers Offeror No. 3

WB Bawley Construction

Bid Security (Type and Amount) Bid Security (Type and Amount)

Offeror No. 5 Offeror No. 6 Offeror No. 7 Offeror No. 8 New Dominion Construction LLC Seawolf Construction Web, LLC

Bid Security (Type and Amount) Bid Security (Type and Amount) Bid Security (Type and Amount) Bid Security (Type and Amount)

Federal Construction Inc.

Amendments Acknowledged Amendments Acknowledged Amendments Acknowledged Amendments Acknowledged

Construction

2020-11-17T12:21:24-0500
BERNARD.MAGDALENA.1247549117

File details come from the government source that posted it. Updated .