Removal of a Half Wall

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
19AU9026Q0011
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Vienna Wien Austria

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of State intends to solicit a general contractor for removal of two half-walls in the waiting area at the U.S. Embassy Consulate in Vienna, Austria, with quotations due by July 29, 2026. No set-aside applies.

The scope includes demolition and disposal of concrete brick half-walls (combined length 14.5 meters, height 1.3 meters) and adjacent flooring in all layers; electrical work including dismantling and reinstallation of switches, sockets, and wiring; floor filling with screed, impact sound insulation, and laminate flooring; and site cleaning. Work encompasses dust protection, site logistics, and compliance with USG security regulations.

Performance occurs in Vienna at an active hotel-office building housing embassy operations. The facility will remain operational during construction. Work is constrained to short time slots including nights and weekends to minimize disruption to employees and clients. Construction is scheduled for fall 2026 over an indicative 4–5 days. Contractor personnel, vehicles, and materials require clearance through the USG security process. The contractor must comply with restricted working hours, building security measures, and safety protocols appropriate to the central-city location with limited vehicle access and neighboring buildings.

Notice text

This project is for the removal of 2 half-walls in the waiting area at the U.S. Embassy Consulate in 1010 Vienna.

Interested parties shall prepare and submit a quotation according to the detailed tender documents that will be published in the next step of procurement/solicitation notice.

Tender specifiations: General Contractor for Construction work, Flooring and Electrical Installation

The SOW consists but is not limited to the following:

  • Dust Protection: temporary dust screen made of strong plastic sheeting around the demolishing area (floor to ceiling)
  • Site installation & Logistics Complications: City centre, vehicle access, hotel-office building in operation, neighbors, operating hours, restricted working hours, security measures
  • Demolition, removal and disposal of 2 half-walls: concrete bricks (length sum +14.5m, height=1.3m) and adjacent floor in all layers
  • Electrical installations Dismantling of switches, sockets, wiring in half walls and floors before demolition; new switches/sockets/wires to be installed in existing walls.
  • Filling of the area in the floor+ new flooring (screed, impact sound insulation, laminate flooring)
  • Site-Cleaning renovation area and all affected areas in the building

Special requirements

  • The work will be carried out in short time slots (incl. night & weekend) while the facility remains in operation and in the presence of the employees and clients who should not be disturbed during the construction work
  • USG Security regulations
  • Clearance process for employees, cars, material on site
  • Safety and protective measures

Execution periods

Indicative construction schedule: 4-5 days in fall 2026

Notice history

Notice Type Posted
Removal of 2 Half-Walls Latest solicitation Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity