Remanufacture of the T-38 Anti-Ice Control
Closed Solicitation Posted
- Solicitation number
- FA8118-25-R-0070
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Place of performance
- United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center is seeking a contractor to remanufacture T-38 Anti-Ice Control units, which are aluminum alloy components that regulate air flow in aircraft anti-ice air conditioning packs or water separators. This firm fixed-price requirements contract spans five years with a three-year basic period and one two-year option period, requiring the contractor to restore end items to like-new condition through comprehensive disassembly, cleaning, inspection, maintenance, reassembly, testing, and finishing processes. Qualification requirements apply to this procurement, and interested vendors must submit a Source Approval Request package to the Source Development, Small Business Office before participating. The evaluation will be based on adequate price competition, though certified cost or pricing data may be required if adequate competition does not exist. Proposals are due by 1:00 PM on August 6, 2025, with the solicitation having been posted on June 9, 2025.
This procurement is designated as a Total Small Business set-aside, specifically targeting Women-Owned Small Businesses under NAICS code 336413 with a size standard of 1,250 employees. The contract involves remanufacturing anti-ice control units identified by NSN 1660-00-888-6350 and Part Number 570642, with specific components measuring 6.125 inches in length, 5.625 inches in width, and weighing 26 ounces. Performance will take place within the United States, and the contractor must provide all materials, facilities, labor, parts, and equipment necessary for the remanufacturing process. The government will only pay for missing components after review and approval of Over and Above requests, with no additional costs allowed for material handling, profit, or indirect expenses. A Pre-Award Survey and Initial Production Evaluation are required, and the contractor must comply with Item Unique Identification marking requirements and various reporting obligations including Commercial Asset Visibility reporting and monthly production reports.
Notice text
REMANUFACTURE
A 5-YEAR (THREE-YEAR BASIC AND 1 TWO-YEAR OPTION PERIOD) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED.
NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, if after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1).
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).
(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office @ 405- 739-7243.
SAR submittals need to be sent to:
https://www.tinker.af.mil/Home/429SCMS-SASPO/ <https://www.tinker.af.mil/Home/429SCMS-SASPO/> Source Development Specialist Email: ocalc.bc.records@us.af.mil - Small Business Office
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to Dessie Breslin at dessie.breslin@us.af.mil AND Amy Gil amy.gil@us.af.mil. Release of any data is subject to applicable data rights. The request shall include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.**
In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link.
(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.
(f) END ITEMS BEYOND REMANUFACTURE
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(g) If the contractor estimates that any item is not reparable (i.e. beyond remanufacture), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further remanufacture on any such items except
at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO.
Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.
(h) Condemned units shall not be counted as production.
(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government’s required delivery schedule.
(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.
(l) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable.
(m) Dates listed in clauses 52.216-18, 52.216-19 and 52.216‐21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.
(n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).
(o) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1 but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.
(p) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110 a contractors must submit a copy of their plan with their proposal.
Files
| File | Type | Posted |
|---|---|---|
| CDRLs.pdf | ||
| CAV AF REPORTING REQUIREMENTS.pdf | ||
| JQRR.pdf | ||
| SOW.pdf | ||
| DI-MGMT-80969.pdf | ||
| IUID Checklist_Redacted.pdf | ||
| FA8118-25-R-0070.pdf | ||
| DI-MGMT-81838.pdf | ||
| DI-MGMT-80441D.pdf | ||
| DI-PSSS-81995A.pdf | ||
| Packaging Requirements.pdf | ||
| Item Description_Redacted.pdf |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Remanufacture of the T-38 Anti-Ice Control | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| T-38 Accessory Drive Gearbox Remanufacture | Air Force Sustainment Center | No set-aside | |
| Remanufacture F108-201 MAIN FUEL PUMP NSN: 2915-01-241-9239PN | Air Force Sustainment Center | No set-aside | |
| T-38 Central Fuselage Station (CFS) 505 Drill Fixtures Assemblies | Air Force Sustainment Center | No set-aside | |
| Cylinder, Assembly, A | Aviation | No set-aside | |
| Remanufacture of B-2 Actuator, Electromechanical, Rotary | Air Force Sustainment Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity