Relocation of a Bunkhouse and a Visitor Center to the New Administrative Site

Award Notice Posted

Solicitation number
AG-0261-S-15-0057
Agency
Awarded
to Foxy Construction LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-0261-C-15-0008 Federal contract award
NAICS code
238990 All Other Specialty Trade Contractors
PSC
Not on record
Place of performance
Las Vegas, Nevada 89130, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS.
RELOCATION of a BUNKHOUSE and a VISITOR CENTER to the NEW ADMINISTRATIVE SITE

This project includes the relocation of two modular buildings; a bunkhouse (building #1139), and a visitor center (building #1225). Two 40 ft. long "Conex" Containers and one 1,000 gallon Propane Tank will also be relocated. Both buildings and both containers are located in the old Middle Kyle Canyon Administration Site (Mount Charleston, Nevada). All items are to be relocated to the new Middle Kyle Canyon Administration Site located 3 miles east of the old site.
The project also includes site preparation work including excavation and site grading, constructing new foundations for the buildings, and connection of designated utilities to each building. Connections of designated utilities will require installation of extensions to existing underground utilities (water, sewer, electrical, and telecommunications) or installation of new underground utility service lines (LPG). Some re-routing or replacement of existing building utility lines, such as the building sewer drain line under the bunkhouse, will also be required. Construction of 200 ft. of roadway ditch and a drivable waterbar is also a part of the work.
Contractor shall supply all materials, equipment, supervision, transportation, labor, and any transportation permits for transporting the bunkhouse and visitor center, completing site preparation work, constructing building foundations for the structures, re-assembling the two buildings at the new location, and connecting utilities..
The bunkhouse building footprint is approx. 3700-square feet with dimensions of about 84-feet by 85-feet. It is a one story "L" shaped double wide premanufactured structure situated on wood stem walls and concrete footings. Concrete footings shall be provided for this building. Contractor will have the option of dis-assembling the wood foundation walls for the bunkhouse at its current site and re-assembling the wood foundation walls at the new site, or designing and submitting an alternative foundation system using permanent building materials.
The visitor center building footprint is approx. 800-square feet with dimensions of about 20-feet by 40-feet. It is a one and one-half story double wide premanufactured structure situated on stacked brick footings. Concrete footings shall be designed for this building to rest on at the new admin site.
PROJECT LOCATION
This project is located on the Humboldt - Toiyabe National Forest within the Spring Mountain National Recreation Area administrative yard located within Mount Charleston, Nevada. The new and old administration sites are located on Kyle Canyon Road (State Route 157) at approx. mile post 5.7 and 3.0 respectively.


Estimated Start Date: July 1, 2015, contract time is 90 Calendars Days. NAICS:238990, $15.0M-set aside for small business


 

Update #1 ·

THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS.
RELOCATION of a BUNKHOUSE and a VISITOR CENTER to the NEW ADMINISTRATIVE SITE

This project includes the relocation of two modular buildings; a bunkhouse (building #1139), and a visitor center (building #1225). Two 40 ft. long "Conex" Containers and one 1,000 gallon Propane Tank will also be relocated. Both buildings and both containers are located in the old Middle Kyle Canyon Administration Site (Mount Charleston, Nevada). All items are to be relocated to the new Middle Kyle Canyon Administration Site located 3 miles east of the old site.
The project also includes site preparation work including excavation and site grading, constructing new foundations for the buildings, and connection of designated utilities to each building. Connections of designated utilities will require installation of extensions to existing underground utilities (water, sewer, electrical, and telecommunications) or installation of new underground utility service lines (LPG). Some re-routing or replacement of existing building utility lines, such as the building sewer drain line under the bunkhouse, will also be required. Construction of 200 ft. of roadway ditch and a drivable waterbar is also a part of the work.
Contractor shall supply all materials, equipment, supervision, transportation, labor, and any transportation permits for transporting the bunkhouse and visitor center, completing site preparation work, constructing building foundations for the structures, re-assembling the two buildings at the new location, and connecting utilities..
The bunkhouse building footprint is approx. 3700-square feet with dimensions of about 84-feet by 85-feet. It is a one story "L" shaped double wide premanufactured structure situated on wood stem walls and concrete footings. Concrete footings shall be provided for this building. Contractor will have the option of dis-assembling the wood foundation walls for the bunkhouse at its current site and re-assembling the wood foundation walls at the new site, or designing and submitting an alternative foundation system using permanent building materials.
The visitor center building footprint is approx. 800-square feet with dimensions of about 20-feet by 40-feet. It is a one and one-half story double wide premanufactured structure situated on stacked brick footings. Concrete footings shall be designed for this building to rest on at the new admin site.
PROJECT LOCATION
This project is located on the Humboldt - Toiyabe National Forest within the Spring Mountain National Recreation Area administrative yard located within Mount Charleston, Nevada. The new and old administration sites are located on Kyle Canyon Road (State Route 157) at approx. mile post 5.7 and 3.0 respectively.


Estimated Start Date: July 1, 2015, contract time is 90 Calendars Days. NAICS: 238990, $15.0M


 

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors