amendment_2.pdf

PDF 2 MB Posted

Attached to
Relocation of a Bunkhouse and a Visitor Center to the New Administrative Site
Solicitation number
AG-0261-S-15-0057
Issued by

About this file

Amendment 2-Extends Closing Date to June 23 2015 1200 Mountain Time

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-0261-S-15-0057

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

BOISE ID 83709-1663

1249 S VINNELL WAY STE 200

ATTN-TANYA SPANFELLNER

SW IDAHO-NEVADA ACQUISITION CENTER

06/10/2015000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/18/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Purpose of Amendment

1.Extend Closing Date to June 23, 2015 @ 1200 Mountain Time

2.Answers to Questions asked at pre-bid meeting

3.Replace Drawings Sheets with the Attached Revised Drawing Sheets

Period of Performance: 07/01/2015 to 09/30/2015

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

TANYA SPANFELLNER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Q1: Where is the access to the bunkhouse attic?

A: Access to the attic is located on the west end of the bunkhouse, above the porch. Remove the louver above the porch to access the attic.

Q2: What is the overhead clearance of the power lines along the main road into the new administration site?

A: Refer to Revised Sheet 7; clearance was measured to be between 19 and 21 feet.

Q3: On Sheet 14, Elevations are not provided on profile view.

A: Refer to revised Sheet 14

Q4: An investigation of an underground utility vault (located adjacent to the location where the old visitor center is to be placed) did not indicate electrical conduit was installed. Was electrical conduit installed to the location where the barracks is to be placed?

A: According to as-built drawings for the Middle Kyle Canyon Administrative Site project, electrical conduit was installed parallel to the telecom conduit; the electrical conduit goes through a handhole located to the north of the telecom vault. Refer to revised sheets 7 and 9 for details.

Q5: Where does the telecom conduit tie into the bunkhouse upon its relocation to the new Administrative site?

A: The telecom conduit is to tie into the common area of the bunkhouse; the approximate location is shown on revised Sheet 9.

Q6: Where is the disposal area for excess excavated material not used to fill Kyle Wash (for the removal of the bunkhouse at the old administrative site)?

A: Dispose excess material at the old administrative site; disposal area will be within a 100 foot radius of the current location of the bunkhouse and the final location will be determined by the COR.

Q7: Who is the propane supplier (for removing propane from the tanks prior to relocation)?

A: Suburban Propane

Q8: On the north end of the bunkhouse, there is an electrical conduit coming out of the exterior siding and travels into the ground. Is it still functioning?

A: The conduit went to an exterior electrical outlet attached to the fence line along the north end of the bunkhouse. The fence and outlet have been removed and the electrical conduit is no longer operational.

However, the electrical line in the conduit still remains in place and is functioning. The breaker controlling this outlet (which controls the dining room area of the bunkhouse) is shut off to disable this exterior electrical line.

Q9: Will the two “conex” containers be emptied of their contents prior to relocation?

A: Yes

Amendment #2 Solicitation No.:AG-0261-S-15-0057

~120’

~45’

Amendment #2 note: The Com wire is coiled in the vault at location “A” ready to pull to the bunkhouse terminus of the conduit (already installed).

There is no conduit/com cable from the vault to the new training building, this will need to be installed as a part of this contract.

The electrical feed wire is stubbed to a pull-box at location “B”. There is conduit installed to within 5’ of the bunkhouse and the training building foundation from that point. The wire is un-cut and coiled in the Fire Cash for this installation (Wire is Government Furnished Equipment). Lines will have to be pulled and conduit/boxes installed as necessary to make final connection to the buildings as a part of this contract.

A

B

Amendment #2

Amendment #2