Rehabilitate Burma Road - Fort McCoy, Wisconsin
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9128F-21-B-0008
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Fort McCoy WI 54656, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks bids for the rehabilitation of approximately seven miles of Burma Road at Fort McCoy in Wisconsin. The U.S. Army Corps of Engineers Engineering District Omaha will issue an invitation for bid on January 27, 2021 to improve the geometrics and drainage of the road to accommodate increased speeds for tactical and non-tactical vehicles. Bids are due by February 26, 2021 with work to be completed within 18 months of notice to proceed. The contractor must commence work within 10 days of notice and will be subject to liquidated damages for failure to timely complete the project.
There is no set-aside designated for this procurement. The primary NAICS code is 237310 for highway, street, and bridge construction and the estimated value is between $5-10 million. Work will involve grading, drainage improvements, culvert replacements, utility relocations, tree removal and safety treatments at tank trail crossings. Bidders must have an active SAM registration including NAICS code 237310 and submit annual certifications by the stated deadline. Questions are due to the contracting specialist by the specified date and phone calls will not be accepted.
Notice text
2 versions
Update #2 · Latest ·
W9128F21B0008 (formally W9128F21R0040)
On or about 12 April 2021, this office will issue an Invitation for Bid (IFB) for Rehabilitate Burma Road, Fort McCoy Wisconsin. The solicitation will close on or about 12 May 2021.This solicitation is Unrestricted.
All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237310 is included in their profile prior to submission of bid.
Project Description (approx. quantities):
Fort McCoy Directorate of Public Works (DPW) Office recently requested a design to rehabilitation an approximate seven-mile portion of Burma Road. Current roadway surface condition of gravel to remain unchanged. Roadway has large grade changes and areas of steep grades. Currently the roadway is closed during the winter months. DPW request’ improve geometrics in order to accommodate an increase in speed limit for both non tactical and tactical vehicles. DPW would also prefer to keep road open during all seasons. No pull-offs or passing lanes are required. There are several intersections with other roadways and with a military vehicle trail that will need to be maintained/altered if there is a grade change that impacts them.
DPW indicates there is a buried electric utility line along most if not all of the roadway, and a communication utility line on the opposite side of the road. Probable realignment or replacement of portions of the utilities will be necessary. Geometrics - Where existing horizontal alignment is prohibitive of 45 mph design speed, sign for appropriate speed on curve. Vertical alignment will likely be challenging- preliminary assessment indicates existing grades in excess of 15% in some areas. Design to include determination of largest desired grade based on winter driving conditions, constructability, and economy. Current vertical alignment probably does not meet criteria for stopping sight distance for many sag and crest curves.
Grading - Preliminary investigation indicates quite steep grades along sides of roadway, which may result in large cuts and fills if vertical alignment is altered. Clear zone and recoverable slopes for higher speeds will require large grading areas. Guardrail will be included as an option when roadside grading is infeasible or excessive. Drainage - There are few culverts under existing road. Design will include culverts to be replaced or extended (depending on condition). No existing drainage problems (flooding, standing water, etc.) have been evident historically.
NEPA documentation will be completed by Fort McCoy DPW. Tank Trail Crossings - There are a few tank trail crossings on Burma Road that will require heavy-duty surface consideration.
Tree removal - grading of a safety section (i.e. recoverable foreslopes and adequate clear zone) will require the removal of many trees. Trees will need to be replaced in-kind within the installation.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 12 months) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
The above project description is for information only. Project scope of work is subject to change.
The estimated construction cost of this project is between $7,500,000 and $10,000,000.
Bidders (Offerors):
Please be advised of online registration requirement in the SAM, https://www.sam.gov/ and directed solicitation provisions concerning representations and certifications. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via Contract Opportunities (Beta.SAM>Contract Opportunities) at https://beta.sam.gov/search?index=opp.
Find solicitation announcement in Contract Opportunities (https://beta.sam.gov/search?index=opp):
1. Use the “Keywords” search function to locate the project (by entering the solicitation number) or use the advanced search features offered in the “Federal Organizations” (towards the middle of the page) or use the “Federal Organizations” search feature followed by the “Advanced Search” feature.
2. By using the “Sign In” feature, it allows additional search features and allows you to keep your searches. Sign In might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on hyperlinked title of the solicitation to view the project. Files may be downloaded from the “Attachments/Links” section of the solicitation.
Questions should be sent to the Contracting Specialist, Mr. Jae H. Chang, at jae.chang@usace.army.mil.
Telephone calls will not be accepted.
Update #1 ·
W9128F21B0008 (formally W9128F21R0040)
On or about 27 January 2021, this office will issue an Invitation for Bid (IFB) for Rehabilitate Burma Road, Fort McCoy Wisconsin. The solicitation will close on or about 26 February 2021.This solicitation is Unrestricted.
All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237310 is included in their profile prior to submission of bid.
Project Description (approx. quantities):
Fort McCoy Directorate of Public Works (DPW) Office recently requested a design to rehabilitation an approximate seven-mile portion of Burma Road. Current roadway surface condition of gravel to remain unchanged. Roadway has large grade changes and areas of steep grades. Currently the roadway is closed during the winter months. DPW request’ improve geometrics in order to accommodate an increase in speed limit for both non tactical and tactical vehicles. DPW would also prefer to keep road open during all seasons. No pull-offs or passing lanes are required. There are several intersections with other roadways and with a military vehicle trail that will need to be maintained/altered if there is a grade change that impacts them.
DPW indicates there is a buried electric utility line along most if not all of the roadway, and a communication utility line on the opposite side of the road. Probable realignment or replacement of portions of the utilities will be necessary. Geometrics - Where existing horizontal alignment is prohibitive of 45 mph design speed, sign for appropriate speed on curve. Vertical alignment will likely be challenging- preliminary assessment indicates existing grades in excess of 15% in some areas. Design to include determination of largest desired grade based on winter driving conditions, constructability, and economy. Current vertical alignment probably does not meet criteria for stopping sight distance for many sag and crest curves.
Grading - Preliminary investigation indicates quite steep grades along sides of roadway, which may result in large cuts and fills if vertical alignment is altered. Clear zone and recoverable slopes for higher speeds will require large grading areas. Guardrail will be included as an option when roadside grading is infeasible or excessive. Drainage - There are few culverts under existing road. Design will include culverts to be replaced or extended (depending on condition). No existing drainage problems (flooding, standing water, etc.) have been evident historically.
NEPA documentation will be completed by Fort McCoy DPW. Tank Trail Crossings - There are a few tank trail crossings on Burma Road that will require heavy-duty surface consideration.
Tree removal - grading of a safety section (i.e. recoverable foreslopes and adequate clear zone) will require the removal of many trees. Trees will need to be replaced in-kind within the installation.
The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 18 months) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.
The above project description is for information only. Project scope of work is subject to change.
The estimated construction cost of this project is between $5,000,000 and $10,000,000.
Bidders (Offerors):
Please be advised of online registration requirement in the SAM, https://www.sam.gov/ and directed solicitation provisions concerning representations and certifications. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via Contract Opportunities (Beta.SAM>Contract Opportunities) at https://beta.sam.gov/search?index=opp.
Find solicitation announcement in Contract Opportunities (https://beta.sam.gov/search?index=opp):
1. Use the “Keywords” search function to locate the project (by entering the solicitation number) or use the advanced search features offered in the “Federal Organizations” (towards the middle of the page) or use the “Federal Organizations” search feature followed by the “Advanced Search” feature.
2. By using the “Sign In” feature, it allows additional search features and allows you to keep your searches. Sign In might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on hyperlinked title of the solicitation to view the project. Files may be downloaded from the “Attachments/Links” section of the solicitation.
Questions should be sent to the Contracting Specialist, Mr. Booker L. Jordan, Jr., at Booker.L.Jordan@usace.army.mil.
Telephone calls will not be accepted.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Rehabilitate Burma Road - Fort McCoy, Wisconsin | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| CO OMAD 300(71) Minuteman Missile Access | Federal Highway Administration | Total Small Business | |
| ND OMAD 2025(1) Minuteman Missile Access Road | Federal Highway Administration | Total Small Business | |
| Upgrade multiple campsites at pineview campground | MICC Fort McCoy | Service-Disabled Veteran-Owned Small Business | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity