RECOVERY--Z--Rehabilitation and Painting of Tainter Gates, Kaw Lake, Oklahoma

Award Notice Posted

Solicitation number
W912BV-09-R-1007
Agency
Awarded
to Alltech Engineering Corp
Set-aside
No set-aside

Opportunity facts

Contract number
W912BV09C1011 Federal contract award
NAICS code
Not on record
PSC
Not on record
Place of performance
US Army Engineer District, Tulsa Attn: Ceswt-CT, 1645 South 101st East Avenue Tulsa OK 74128 US

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS WHO PREVIOUSLY SUBMITTED PROPOSALS. ANY CONTRACT RESULTING FROM ISSUANCE OF THIS REQUEST FOR PROPOSALS WILL BE FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA).

Update #2 ·

POC: Ms. Susie Mall, 918-669-7273.

Efforts include the following: Remove debris, laminated rust, pack rust, unclogging drain holes, cleaning out trunnion yokes by removing Plexiglas cover and clearing out dirt and moss, and blasting to SSPC SP5 (white metal) the downstream and upstream side of each tainter gate. Each gate shall be painted with system no. 5-E-Z. Cleaning and painting shall be so programmed that dust or other contaminants from cleaning process do not fall on wet, newly painted surfaces. Structural repairs shall be made to the gates to fix corrosion damage. Replace existing side seal assemblies. Clean all existing Govt. property including gates, weirs and bridge of all blast media and debris resulting from construction activities. Estimated cost range is %500K to $1M. All technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities site, fbo.gov. Issue date on or about 5 January 2009. For questions, please Ms. Susie Mall, Contracting Division, 918-669-7273.

Update #1 ·

POC: Ms. Susie Mall, 918-669-7273.

Efforts include the following: Remove debris, laminated rust, pack rust, unclogging drain holes, cleaning out trunnion yokes by removing Plexiglas cover and clearing out dirt and moss, and blasting to SSPC SP5 (white metal) the downstream and upstream side of each tainter gate. Each gate shall be painted with system no. 5-E-Z. Cleaning and painting shall be so programmed that dust or other contaminants from cleaning process do not fall on wet, newly painted surfaces. Structural repairs shall be made to the gates to fix corrosion damage. Replace existing side seal assemblies. Clean all existing Govt. property including gates, weirs and bridge of all blast media and debris resulting from construction activities. Estimated cost range is %500K to $1M. All technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities site, fbo.gov. Issue date on or about 5 January 2009. For questions, please Ms. Susie Mall, Contracting Division, 918-669-7273.

Files

File Type Posted
am3.pdf PDF
Amd0002.pdf PDF
SF30am1.pdf PDF
09r1007.zip ZIP file
09r1007.pdf PDF
Opening Drawings.txt TXT text file

Notice history

Notice Type Posted
RECOVERY--Z--PROJECT NUMBER 8790, Kaw Lake, OK Latest Award Notice
RECOVERY--Z--PROJECT NUMBER 8790, Kaw Lake, OK Award Notice
RECOVERY--Z--PROJECT NUMBER 8790, Kaw Lake, OK Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors