RECOVERY - Yokahu Tower Renovation and Palo Colorado Picnic Area Trail Maintenance in Puerto Rico
Award Notice Posted
- Solicitation number
- AG-4419-S-10-0651
- Agency
-
Operations Center East
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Constructora Campo Rico, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG4419C100535 Federal contract award
- NAICS code
- 238190 Other Foundation, Structure, and Building Exterior Contractors
- PSC
- Not on record
- Place of performance
- El Yunque National Forest Rio Grande, Puerto Rico 00745, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Bid Opening date extended to May 17, 2010 at 2:00 PM EDT.
Update #1 ·
RECOVERY Yokahu Tower Renovation and Palo Colorado Picnic Area Trail Maintenance
PROJECT DESCRIPTION: This project consists of work at two recreation sites along Hwy. 191. Palo Colorado trail maintenance includes removing and replacing 390 square meters of concrete tread in the existing location, improving drainage structures by replacing existing culverts, installing new culverts, and cleaning existing drainage ways and structures.. The second portion of this project includes the renovation of the Yokahu Tower Restroom, replacing plumbing and toilet fixtures, and bringing the entire facility up to current accessibility standards. The bus shelter at Yokahu will be repaired by replacing the roof and repairing the concrete sidewalk and curb.
PROJECT LOCATION: El Yunque National Forest near Rio Grande, Puerto Rico
ESTIMATE COST RANGE: $250,000 to $500,000.
SOLICITATION DOCUMENTS, SPECIFICATIONS, AND DRAWINGS: The solicitation, AG-4419-S-10-0651 will be issued via FedBizOpps, as an Invitation for Bids and will be available for downloading on or about April 13, 2010 at the website address: http://www.fedbizopps.gov/
All vendors are required to be registered in the Central Contractor Registration (CCR) prior to award of a contract, http://www.ccr.gov/
Files
| File | Type | Posted |
|---|---|---|
| Painting Spec.pdf | ||
| Amendment 2 .pdf | ||
| El Yunque Def. Maintence Spec.pdf | ||
| Q A.pdf | ||
| Amendment 1.pdf | ||
| SPECS Palo Colorado_Yokahu Tower.pdf | ||
| Palo Colorado_Yokahu Drawings.pdf | ||
| CONSTRUCTION_IFB.docx | DOCX document | |
| PR1_dvb.txt | TXT text file |
Notice history
| Notice | Type | Posted |
|---|---|---|
| RECOVERY - Yokahu Tower Renovation and Palo Colorado Picnic Area Trail Maintenance | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity