About this file

Answers to questions asked by contractors

View the file

Other files

File Type Posted
Painting Spec.pdf PDF
Amendment 2 .pdf PDF
El Yunque Def. Maintence Spec.pdf PDF
Amendment 1.pdf PDF
Palo Colorado_Yokahu Drawings.pdf PDF
PR1_dvb.txt TXT text file
CONSTRUCTION_IFB.docx DOCX document
SPECS Palo Colorado_Yokahu Tower.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid opening date changed to 05/17/2010 Corrected Spec. attached.

Answers to submitted questions (Solicitation Number: AG-4419-S-10-0651):

Palo Colorado

1. Will be selected as similar existing in the site and after inspection of the full-size mock-ups. Refer to 02751-1.4B and 2.3C, 1.5D.

2. As-built for trails is not required in the specifications.

3. Trail mock-up shall be full size (02751-1.5D).

4. A Field Office will not be required, the related items in the specifications will be deleted. Please refer to latest amendments posted for this solicitation in FedBizOpps (https://www.fbo.gov/).

Yokahu Tower

1. Meat roof and fascia, flashing, metal gutter with treated wood block, building paper and any other materials and work needed to complete the work as shown in the drawings.

2. Building paper is specified as 60lb (not 60 min) in the drawings, could also be 2 layers of 30lb paper.

3. Dimensions as required by ADA standards.

4. Interior plaster walls paint is required as shown in the drawings. Ceiling paint is not required.

5. The drawings specify "Concrete and rebar," or reinforced concrete.

6. Grab bars are specified. Other bathroom items are not specified.

7. There's no electric power service in the Yokahu facilities. The electric connection will need to be left ready for future use.

8. For pipe insulation refer to Specs. 220719 "Plumbing Piping Insulation."