RECOVERY* Water Distribution System & Restroom Bldg Replacement - Pisgah National Forest, NC

Award Notice Posted

Solicitation number
AG-4419-S-10-0590
Agency
Awarded
to Agrr Corporation
Set-aside
HUBZone

Opportunity facts

Contract number
AG-4419-C-10-0427 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Pisgah National Forest Henderson County Pisgah Ranger District Mills River Campground, North Carolina, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

This award was the result of a competitive solicitation resulting in a fixed price award.

Update #4 ·

SF30 - Amendment 2



The sole purpose of this amendment is to provide the pre-Bid Sign-In sheet. See Attached.



All other terms and conditions remain unchanged.

Update #3 ·

Amendment 1 - SF30



Due to current market research, sufficient Hub Zone contractors have been revealed whereby the solicitation is now being changed from UNRESTRICTED to SETASIDE FOR HUB ZONES only.





All other terms and conditions remain unchanged.



Update #2 ·

*RECOVERY*





The USDA - Forest Service intends to award a Firm Fixed price Contract for the following project:



Located on the Pisgah National Forest in North Carolina,



This project consists of the replacement of the existing extended aeration wastewater treatment plant, water distribution system and restroom building. The new treatment plant is a 15,000 GPD DUAL TRAIN tertiary treatment above ground unit. The new bath-house is an 8-unit block/brick veneered structure w/porches. The new water distribution system will consist of a 3" PVC watermain with HDPE branch lines ranging in size from 2" to 3/4" in dia. Incidental work includes clearing, erosion & sedimentation control and primary/secondary site electrical work.



Price range: Between $500,000 and $1,000,000



This procurement is unrestricted (FAR 19.10)





*******************************************************************************************************

IMPORTANT PLEASE READ ALL OF THE FOLLOWING INFORMATION

*******************************************************************************************************

An organized site visit has been scheduled for:



Date: April 30 2010

Time: 10:00 am EST



Those interested in attending will meet at the project site:



On the Pisgah Ranger District, off Forest Service Road 1206 off NC State Route 191, 10 miles southwest of the Asheville Airport



For additional information, contact David Velez @ 828-257-4208 or barry Jones @ 828-257-4835



Instructions to Bidders

Please submit 2 copies of completed Section A (SF1442) , Section B (Schedule of Items) and a narrative addressing your firms qualifications as they apply to Section M (Evaluation Factors) and 1 original bid bond as indicated in 52.228-1.



Bids due =========

NOTICE: Quotations must be received NO LATER THAN 12:00pm EST on May 14, 2010

ALL SUBMISSIONS MUST BE SENT TO THE FOLLOWING:



USDA FOREST SERVICE - EROC EAST

1720 PEACHTREE ROAD NW - Suite 700

ATLANTA, GA., 30309

Attn. Mark Kamholtz or Lisa Browning

Please also clearly reference the solicitation number AG-4419-S-10-0590 on the outside of the mailer/package.



Please write your DUNS and TIN number in Box 14 of the SF1442.



NO FAXES, E-MAILS OR OTHER ELECTRONIC SUBMISSIONS WILL BE ACCEPTED*************

All vendors are required to be registered in both the ORCA and the Central Contractor Registration (CCR) prior to award of a contract, http://www.ccr.gov/

Update #1 ·

*RECOVERY*



***** THIS NOTICE IS FOR INFORMATION PURPOSES ONLY *****

***** PLEASE DO NOT RESPOND TO THIS NOTICE *****



The USDA - Forest Service intends to award a Firm Fixed price Contract for the following project:



Located on the Pisgah National Forest in North Carolina,



This project consists of the replacement of the existing extended aeration wastewater treatment plant, water distribution system and restroom building. The new treatment plant is a 15,000 GPD DUAL TRAIN tertiary treatment above ground unit. The new bath-house is an 8-unit block/brick veneered structure w/porches. The new water distribution system will consist of a 3" PVC watermain with HDPE branch lines ranging in size from 2" to 3/4" in dia. Incidental work includes clearing, erosion & sedimentation control and primary/secondary site electrical work.





The solicitation for this project will be forthcoming. Please check back in the next few weeks for its release and all applicable requirements and related information.

***********************************************************************

NO INFORMATION WILL BE DISCUSSED AT THIS TIME. PLEASE DO NOT CALL ON THIS PROJECT UNTIL THE SOLICITATION HAS BEEN RELEASED.

Files

File Type Posted
North Mills Sign in Sheet.pdf PDF
SF30 - Amendment 2.pdf PDF
SF30 Amendment 1.pdf PDF
Attachment 2 - Wage Determination.doc DOC document
Exhibit 1 - Drawings.pdf PDF
Section B1 - SOI Supp Instructions.doc DOC document
Sections C thru M - Solicitation.doc DOC document
Section B - Schedule of Items.pdf PDF
Attachment 1 - Specifications.pdf PDF
Section A - SF 1442.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors