RECOVERY - Up The Bottom Rehab Decommissioning & Brown Grizzly Rehab Decommissioning - Idaho Panhandle National Forests

Award Notice Posted

Solicitation number
AG-82B1-S-09-0065
Agency
Awarded
to Small Butte Construction, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG82B1C090048 Federal IDV award
PSC
Not on record
Place of performance
Legal description for Up the Bottom Rehab is Sections 11, 12, 13, T.51N. R.2W and Section 7,18, T.51 N. R.1W. From Coeur d'Alene River Ranger District, travel East on County Road 108 for 5.8 miles. County Road 108 becomes Forest Road 268. Travel 5.0 miles on FR 268 to its junction with FR 612. Continue on FR 612 for 10.9 miles to its junction with FR 209 and turn left (North) on FR 209. Travel 4.6 miles to the junction of FR 209 and 206. Turn left (Southwest) on FR 206 and travel 1.1 miles to the junction of FR 206 and 2341. Brown Grizzly project is located in Sections 11, 14, T.50N, R3E. and Sections 14, 15, 19, 22, 23, 26, 27, 29, 30, 34, 36 T.51N. R3E. From Coeur d'Alene River Ranger District, travel West on I-90 for 5 miles and exist at Kingston (Exit 43). Turn right and travel Northeast up the North Fork of the Coeur d'Alene River on FH9 for 18.5 miles and turn left on Road 1-C (Old River Road). Travel 1.6 miles and turn right (North) on Road 207. Continue for 0.3 miles to Road 990 and an additional 6.2 miles to Brown Creek Saddle and Road 207. From Brown's Saddle travel 7.8 miles Northeast on Road 1569 to Road 3035. From Brown Creek Saddle travel (West) on Road 994 for 7.0 miles to Road 7021. Kootenai and Shone Counties, Idaho, United States

Notice details come from SAM.gov. Updated .

Notice text

Up the Bottom Rehab is a road decommissioning contract. Work consists of restoring channel sites to a natural state by removing fill and drainage structures at stream crossings and installing gradient control structures. Also included is full road re-contour, removal of ditch relief culverts, and seeding disturbed areas. Work on each road will by paid by LUMP SUM. Contractor shall furnish labor, equipment, supervision, transportation, supplies, and incidentals to perform all work as specified.



Brown Grizzly Rehab is a road decommissioning contract. Work consists of restoring channel sites to a natural state by removing fill and drainage structures at stream crossings and installing gradient control structures. Also included is full road re-contour, removal of ditch relief culverts, and seeding disturbed areas. Work on each road project will be paid by LUMP SUM. Contractor shall furnish labor, equipment, supervision, transportation, supplies, and incidentals (except government-supplied materials) to perform all work as specified.



The solicitation will include two separate bid items. It is the Government's intent to award by individual item.



The individual project estimate is between $25,000 - $100,000. A Payment Bond will be required per the Miller Act and Davis-Bacon wage rates will apply.



All responsible sources may submit a bid which will be considered by the Government. In accordance with FAR 4.1102(a), prospective contractors must be registered in the Central Contractor Registration (CCR) database prior to award of a contract. Lack of registration in the CCR on the part of the bidder will render a bidder ineligible for award. Bidders may obtain information on registration and annual confirmation rquirements by calling 888-227-2423, or via the Internet at http://www.ccr.gov//.



Files

File Type Posted
Schedule B Amend 2.doc DOC document
Page 7.pdf PDF
Page 8.pdf PDF
SF 30 AMEND 2.pdf PDF
Page 2.pdf PDF
Page 5.pdf PDF
SF 30 Amend 1.pdff.pdf PDF
Amendment 1 Sec. C and F.pdf PDF
11_utb_DRAINAGE.pdf PDF
02_bg_SUMM_QUANT.pdf PDF
10_utb_GRADIENT.pdf PDF
09_utb_RECONTOUR.pdf PDF
equipment_rental.doc DOC document
07_bg_WORKLIST_A.pdf PDF
12_bg_GRAD_CONTROL.pdf PDF
01_utb_COVER.pdf PDF
11_bg_FULL_ROAD-RECONTOUR.pdf PDF
SF 1442.pdf PDF
08_utb_SED_BASIN.pdf PDF
04_utb_WORK_SITE_MAP.pdf PDF
05_utb_GEN_NOTES.pdf PDF
12_utb_WATER_BAR.pdf PDF
03_bg_SIGN_PLAN.pdf PDF
08_bg_WORKLIST_B.pdf PDF
AG-82B1-S-09-0065.pdf PDF
07_utb_STR_CHAN_RESTOR.pdf PDF
09_bg_STR_CHAN_RESTOR.pdf PDF
wage determination.txt TXT text file
10_bg_SED_BASIN.pdf PDF
01_bg_COVER.pdf PDF
02_utb_SUMM_QUANT.pdf PDF
03_utb_SIGN_PLAN.pdf PDF
06_bg_GEN_NOTES.pdf PDF
05_bg_SITE_MAP_2.pdf PDF
13_bg_DRAINAGE.pdf PDF
equipment_rental.doc DOC document
utb sps.doc DOC document
06_utb_WORK_LIST.pdf PDF
bg_sps.doc DOC document
04_bg_SITE_MAP_1.pdf PDF
14_bg_WATER_BAR.pdf PDF
Show all 41

Notice history

Notice Type Posted
Recovery - up the bottom rehab decommissioning & brown grizzly rehad decommissioning - idaho panhandle national forests Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors