About this file

SF 30

View the file

Other files

File Type Posted
Page 7.pdf PDF
Schedule B Amend 2.doc DOC document
Page 2.pdf PDF
Page 5.pdf PDF
Page 8.pdf PDF
SF 30 Amend 1.pdff.pdf PDF
Amendment 1 Sec. C and F.pdf PDF
01_utb_COVER.pdf PDF
06_bg_GEN_NOTES.pdf PDF
12_utb_WATER_BAR.pdf PDF
03_bg_SIGN_PLAN.pdf PDF
05_bg_SITE_MAP_2.pdf PDF
08_bg_WORKLIST_B.pdf PDF
11_bg_FULL_ROAD-RECONTOUR.pdf PDF
equipment_rental.doc DOC document
13_bg_DRAINAGE.pdf PDF
11_utb_DRAINAGE.pdf PDF
utb sps.doc DOC document
06_utb_WORK_LIST.pdf PDF
bg_sps.doc DOC document
04_bg_SITE_MAP_1.pdf PDF
02_bg_SUMM_QUANT.pdf PDF
08_utb_SED_BASIN.pdf PDF
SF 1442.pdf PDF
09_utb_RECONTOUR.pdf PDF
10_utb_GRADIENT.pdf PDF
14_bg_WATER_BAR.pdf PDF
07_bg_WORKLIST_A.pdf PDF
05_utb_GEN_NOTES.pdf PDF
04_utb_WORK_SITE_MAP.pdf PDF
12_bg_GRAD_CONTROL.pdf PDF
09_bg_STR_CHAN_RESTOR.pdf PDF
03_utb_SIGN_PLAN.pdf PDF
07_utb_STR_CHAN_RESTOR.pdf PDF
10_bg_SED_BASIN.pdf PDF
AG-82B1-S-09-0065.pdf PDF
wage determination.txt TXT text file
01_bg_COVER.pdf PDF
02_utb_SUMM_QUANT.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-82B1-S-09-0065

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82B1

US FOREST SERVICE

82B1

US FOREST SERVICE

08/11/2009000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/11/2009

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

TAS::12 1102::TAS for Capital Improvement & Maintenance RECOVERY

AMENDMENT TWO: The purpose of this amendment is to do the following: Replace Schedule of

Items and replace Section C for Up the Bottom Rehab with the following, delete subsection

(e) and replace with: Work will begin in 2010 with a completion date of 30 September 2010.

And (f)Period of Performance is 60 days. For the Brown Grizzly Rehab Decommissioning, Section C-1, delete subsection (e) and replace with: Work will begin in 2010 with a completion date of 30 September 2010. And (f) Period of Performance is 60 days. The following replacement sheets are made: Replace the following sheets, 2, 5, 7 and 8 of 14.

THE HOUR AND DATE SPECIFIED FOR RECEIPT OF OFFERORS IS EXTENDED TO 18 SEPTEMBER 2009 AT

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

BEVERLY L. THOMPSON

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-82B1-S-09-0065/000002

1400 HOURS.

All other terms and conditions remain unchanged.

Period of Performance: 09/25/2009 to 07/31/2010

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .