Brown Grizzly Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Page 7.pdf | ||
| Schedule B Amend 2.doc | DOC document | |
| Page 2.pdf | ||
| Page 5.pdf | ||
| SF 30 AMEND 2.pdf | ||
| Page 8.pdf | ||
| SF 30 Amend 1.pdff.pdf | ||
| Amendment 1 Sec. C and F.pdf | ||
| 01_utb_COVER.pdf | ||
| 06_bg_GEN_NOTES.pdf | ||
| 12_utb_WATER_BAR.pdf | ||
| 03_bg_SIGN_PLAN.pdf | ||
| 05_bg_SITE_MAP_2.pdf | ||
| 08_bg_WORKLIST_B.pdf | ||
| 11_bg_FULL_ROAD-RECONTOUR.pdf | ||
| equipment_rental.doc | DOC document | |
| 13_bg_DRAINAGE.pdf | ||
| 11_utb_DRAINAGE.pdf | ||
| utb sps.doc | DOC document | |
| 06_utb_WORK_LIST.pdf | ||
| 04_bg_SITE_MAP_1.pdf | ||
| 02_bg_SUMM_QUANT.pdf | ||
| 08_utb_SED_BASIN.pdf | ||
| SF 1442.pdf | ||
| 09_utb_RECONTOUR.pdf | ||
| 10_utb_GRADIENT.pdf | ||
| 14_bg_WATER_BAR.pdf | ||
| 07_bg_WORKLIST_A.pdf | ||
| 05_utb_GEN_NOTES.pdf | ||
| 04_utb_WORK_SITE_MAP.pdf | ||
| 12_bg_GRAD_CONTROL.pdf | ||
| 09_bg_STR_CHAN_RESTOR.pdf | ||
| 03_utb_SIGN_PLAN.pdf | ||
| 07_utb_STR_CHAN_RESTOR.pdf | ||
| 10_bg_SED_BASIN.pdf | ||
| AG-82B1-S-09-0065.pdf | ||
| wage determination.txt | TXT text file | |
| 01_bg_COVER.pdf | ||
| 02_utb_SUMM_QUANT.pdf |
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IPNF SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 101 - Abbreviations
101.02 Delete in its entirety and substitute the following:
Pay Items & Pay Units And
AC
Acre
AL.
Aluminum
ASP
Asphalt
AVAIL
Available
BARR
Barrier
BKN
Broken
BST
Bituminous Surface Treatment
CATTLEGD
Cattle guard
CLEAR (CLG)
Clearing
CLEAR/GRUB
Clearing & Grubbing
CMP
Corrugated Metal Pipe
COMP
Compaction
CONC
Concrete
CONST
Construction (Construct)
CTD
Coated (Coating)
CUSH
Cushion
CY (CU YD)
Cubic Yard
CY MI (CYM)
Cubic Yard Mile
DIA
Diameter
DL
Double Lane
DWGS
Drawings
EA
Each
EMB
Embankment
EXC
Excavation F&I Furnish & Install
FDN
Foundation
FT
Foot (Feet)
FUNC
Function
GAL
Gallon
GR.
Grade
GRUB
Grubbing
HDPE
High Density Polyethylene
HOR
Horizontal
HR
Hour
HT
Height I Install
IN
Inches
INCL
Including (Includes)
IND
Individual
JCT
Junction L Logs
LBS
Pounds
LDG
Loading
LF (LIN FT
Linear (lineal) Foot
LS
Lump Sum
LT
Left
MAT'L
Material M Metal
MAX
Maximum
MBF
One Thousand Feet Board Measure
MGALS
One Thousand Gallons
MHD
Method
MI
Mile
MIN
Minimum
MISC
Miscellaneous
MP
Mile Post
MSF
One Thousand Square Feet
OTBC
Open Top Box Culvert P M Placement Method
PVC
Polyvinyl chloride
RD
Road
RECOND
Reconditioning
RECONST
Reconstruction (Reconstruct)
REFL
Reflectorized
RT
Right
STMP (STP)
Stump(s)
SB
Self Balance
SEC
Section
SF
Square Foot (Feet)
SL
Single Lane
SLD
Solid
ST
Slash Treatment
STA
Station (100 Feet)
STA YD
Station Yard
STL
Steel
STR (STRUC)
Structural
SY (SQ YD)
Square Yard
SZ
Size T&L Tops & Limbs
TBR
Timber
TH
Thickness
TM
Ton Mile
TO
Turnout
TOL
Turnout Left
TOR
Turnout right
TRS
Trees
UOT
Utilization of timber
VERT
Vertical W Width W/ With W/O Without
X-SEC
Cross Section
YD
Yard
F04 - SPS 101 – 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Section 102 - Definitions
Add the following:
"Noxious Weeds or Weeds. Any exotic plant species established or that may be introduced in the State which may render land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the State's Department of Agriculture, or by the County's weed management district, or by other appropriate agencies having jurisdiction, or as listed on the current "All States Noxious Weed List".
Shop Drawings. Incidental design sheets and/or drawings, which the Contractor is required to submit to the Contracting Officer. Shop drawings shall conform to the contract requirements, but they are not part of the contract drawings. They may be drawings, diagrams, schedules, performance charts, brochures, and similar data prepared by the Contractor, subcontractor, manufacturer, suppliers, or distributors that illustrate how specific portions of the work are to be fabricated or installed.
Weed Management District. A weed management district is any area of land identified for one of the following: a project or job site, a County, two or more Counties, or a National Forest.
De-compaction. De-compaction is the process of mechanically loosening the surface layer or layers of a road. De-compaction may be performed by any means that loosens the soil to a condition similar to natural soil conditions. After de-compaction the surface should be left in a roughened condition free of any furrows that may concentrate or channel water.”
SPS 102 - 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 103 – Intent of Contract
Replace the second sentence with the following:
“Unless otherwise provided, the contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and shall perform all work as indicated in the drawings and specifications, and in accordance with provisions of the contract.”
SPS 103 - 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 104 – Maintenance for Traffic 104.01 Roads to be
Delete the first two paragraphs and replace with the following:
Constructed
"All roads shall be closed during project work in accordance with the sign plan.
Prior to the Contractor shutting down any operations, the Contractor shall take such precautions as may be necessary to prevent damage to the project, such as approaches, crossings or intersections; and shall make provisions for normal drainage and minimization of erosion.
CONSTRUCTION SIGNING
The contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient signs, and other traffic control devices in accordance with the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). The contractor shall take necessary precautions for the protection of the work and safety of the public. Access roads closed to traffic for safety and to protect the work shall be protected by effective barricades and signs."
PAYMENT
104.03
Basis
"Payment for construction signing and traffic control under this section shall be considered subsidiary to Pay Item 601 Mobilization, and no separate payment will be made."
SPS 104 - 1 (2/3/09)
IPNF SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 106 - Measurement & Payment 106.03 Units of Under "(a) Cubic Yard," add the following:
Measurement "(4) Material, Compacted in Place. The measurement computed using measurements of material in the compacted state on the project. Statistically random measurements of length, depth, and width for computation of quantities shall be made when Actual Quantities are shown in the SCHEDULE OF ITEMS."
106.04 Methods of Add the following:
Measurement "The Variation of Quantity Clause does not apply to items paid for on a Designed Quantity (DQ) or Lump Sum Quantity (LSQ) basis."
F04 - SPS 106 - 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 202 - Removal of Structures and Obstructions
CONSTRUCTION
202.03 Add to this section:
Removal of Bridges, "Upon removal all metal culverts and treated wood from log culverts
Culverts, &
(including geotextile fabric) shall become the property of the contractor
Other Structures and shall be removed from National Forest System lands and disposed of in accordance with Federal, State and local laws.
Non-treated woody debris from the removal of log culverts and open top culverts shall be treated as clearing debris and disposed of as SHOWN ON
THE DRAWINGS.”
202.04
Delete in entirety.
Removal of Pipe, Other than Culverts
PAYMENT
202.06
Delete in entirety and substitute the following:
“Removal and disposal of drainage structures is incidental to Pay Items listed under 210 as shown in the SCHEDULE OF ITEMS and no separate payment shall be made.”
SPS 202 - 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 204 - Soil Erosion & Water Pollution Control
DESCRIPTION
204.01
Delete in entirety and substitute the following:
Work "This work consists of special temporary and/or permanent construction measures as SHOWN ON THE DRAWINGS and/or listed in this specification to control soil erosion and water pollution. Such measures may include (but are not limited to) filter windrows, slash blankets, brush barriers, drainage devices, earth berms, earthen water bars, sediment basins, aggregate base/surfacing, rock ditches, riprap, seeding, mulching, and/or straw bales.
This work shall also include special construction methods SHOWN ON THE DRAWINGS to control erosion."
MATERIALS
204.02
Delete the 2nd paragraph and substitute the following:
Requirements "All other materials shall meet commercial grade standards and shall be approved by the Contracting Officer before being incorporated into the project."
CONSTRUCTION
204.03
Delete the 2nd paragraph and substitute the following:
Performance "Erosion control measures shall be incorporated into the project at the earliest practicable time as outlined in the approved schedule"
"Install sediment basins on the downstream side of each stream channel crossing where water occurs AS SHOWN ON THE DRAWINGS.”
SPS 204 - 1 2/3/09)
SPECIAL PROJECT SPECIFICATION
MEASUREMENT
204.04
Add the following to the first paragraph:
Method
"Items not shown in the SCHEDULE OF ITEMS will not be measured."
204.05
Delete in entirety and substitute the following:
“Erosion control work required under this specification and not shown in the SCHEDULE OF ITEMS shall be incidental to Pay Items listed under 210 as shown Table 1 and no separate payment shall be made.”
Table 1
| SECTION |
| DURATION |
| DESCRIPTION OF WORK |
| TIMING OF CONSTRUCTION |
Incidental to
| Temporary |
| Sediment basins. Made of noxious weed free straw or grass hay. |
| Prior to restoration of stream channels where water occurs. |
Incidental to 210
| Permanent |
| Water bars |
| As specified in Section 210 |
Incidental to 210
| Permanent |
| Seeding |
| As specified in Section 625 |
Incidental to 210
| Permanent |
| Full road re-contour |
| As specified in Section 210 |
SPS 204 - 1 2/3/09)
Brown Grizzly Rehab Delete the standard specification “Section 210-Obliteration of Abandoned Roadways” and substitute the following:
Section 210 - Rehabilitation of Abandoned Roadways
DESCRIPTION
210.01 Rehabilitation of roadways includes but is not limited to restoring stream crossings, Work removing ditch relief culverts, installing water bars, full road re-contour, seeding and mulching disturbed areas. Repair erosion sites to allow access. Restore stream crossings by removing fill and drainage structures and installing gradient control structures. This work includes excavation of stream crossings without drainage structures such as springs, seeps, and headwater swales. Identified work is an estimate and it shall be the responsibility of the contractor to determine actual work for each road to meet specifications outlined in the contract.
CONSTRUCTION
210.02
Begin work at the road terminus and progress towards the permanent road closure.
Performance Work may begin at either end if more than one road junction exists. Where roads are overgrown with brush and small regeneration, equipment shall be operated over brush without grubbing, scarifying or otherwise destroying the established root system of the road way except at designated work sites and to maintain a service road for safe passage. Repair existing mass wasting sites to allow heavy equipment access. All drainage structures/appurtenances shall be removed, dismantled and disposed of in accordance with Section 202.
Vegetation in the existing roadway, windfall and/or concentrations of woody debris, frozen soil, ice and snow shall not be incorporated into the excavated material. It may be placed above the road, on finished slopes or hauled to the designated disposal area. After rehabilitation work is completed scatter large boulders, stumps, dead logs,and/or clearing debris on the finished surface AS SHOWN ON THE DRAWINGS.
210.03
Full road re-contour consists of de-compacting the cut slope half of the road
Full Road way to a depth of 30 inches, excavating fill from the fill slope, and embanking on Re-contour the cut slope half of the road way. Contour fill to match the adjacent natural side slopes.
A 200 foot long representative test strip designated by the Contracting Officer shall be de-compacted to determine the adequacy of de-compaction in the upper layer of for each road way within the same width, depth, soil and surface parameters as designated by the Contracting Officer. The Contracting Officer may approve other methods of de-compaction.
SPS 210 - 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Close designated roads by fully re-contouring the road AS SHOWN ON THE DRAWINGS. Re-contour a 200 foot section of road within 0.1 mile of milepost
0.0 with a hill slope greater than or equal to 70 percent, or in a location determined by the Contracting Officer.
210.04
All streams, including springs, seeps and headwater swales shall be restored to Stream Channel natural ground slope. Do not place excavated material against a weeping cut bank, Restoration spring or in ponded water, allow for proper drainage. Prior to restoration, install a sediment basin in the stream where water is present AS SHOWN ON THE DRAWINGS. The sediment basin can be eliminated with approval of the Contracting Officer.
Perform stream channel restoration AS SHOWN ON THE DRAWINGS. Prior to restoration, install a sediment basin in the stream channel where surface water is present AS SHOWN ON THE DRAWINGS. The sediment basin can be eliminated with approval of the Contracting Officer. De-compact one half of the roadway nearest the cut slope to a depth of 30” before placing road fill excavated from the stream channel.
Removal of any drainage structures shall be in accordance with Section 202. Adjacent road ways shall be re-contoured to approximate adjacent side slopes. Use logs, rock, or rootwads to install gradient control structures. Trees near the stream channel may be used for gradient control and shall be designated by the Contracting Officer. These trees may require felling or bucking into the proper lengths. Rock can be used for gradient control if conserved from adjacent excavation.
Category I - Typical stream crossing in this category will have a fill length measured from the edge of the road shoulder to the downhill toe of fill of less than 15 feet, may or may not require a drainage structure to be removed, and shall require three gradient control structures to be installed. General difficulty level is low.
Category II - Typical stream crossing in this category will have a fill length measured from the edge of the road shoulder to the downhill toe of fill of greater than 15 feet and less than 25 feet, may or may not require a drainage structure to be removed, and shall require four gradient control structures to be installed. General difficulty level is low to moderate.
Category III - Typical stream crossing in this category will have a fill length measured from the edge of the road shoulder to the downhill toe of fill of greater than 25 feet and less than 40 feet, may or may not require a drainage structure to be removed, and shall require five gradient control structures to be installed. General difficulty level is moderate.
SPS 210 - 2 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Category V - Typical stream crossing in this category will have a fill length measured from the edge of the road shoulder to the downhill toe of fill of greater than 60 feet and less than 80 feet, may or may not require a drainage structure to be removed, and requires seven gradient control structures to be installed. General difficulty level is high.
210.05
Install water bars AS SHOWN ON THE DRAWINGS.
Water Bars
210.06
Ditch relief culverts shall consist of the removal of culverts other than those Ditch Relief found at stream crossings. The removal of drainage structures shall be in accordance Culverts with Section 202. The remaining trench shall remain connected to the inside ditch and shall be out sloped to provide drainage.
210.07
Seed and mulch all disturbed areas except where surface water exists in Seeding, accordance with Section 625. After stream channel restoration is complete, break & Mulching open grass hay or straw bales and uniformly scatter on slopes of the newly restored stream channel in loose layers no more than 6 inches thick.
210.08
The method of measurement as described in Section 106, will be designated in the SCHEDULE OF ITEMS. Distances are measured along the road way centerline to the nearest 0.1 mile prior to treatment. Drainage structures (culverts) shall be the number of complete structures measured from inlet to outlet.
210.09
The following items shall be incidental to Pay Items listed under 210 as shown in the
SCHEDULE OF ITEMS and no separate payment shall be made.
(a) Full road re-contour.
(b) Stream channel restoration.
(c) Sediment basins
(d) Gradient control structures
(e) Drainage relief for springs, weeping cut banks, and pond water.
(f) Water bars.
(g) Ditch relief culvert removal.
(h) Seeding & mulching.
SPS 210 - 3 (2/3/09)
The accepted quantities will be paid for at the contract unit price for each
Pay Item shown in the SCHEDULE OF ITEMS.
Payment will be made under:
Pay Item
Pay Unit
210(01) Decommission, Road 207
L.S.
210(02) Decommission, Road 207A
210(03) Decommission, Road 990
210(04) Decommission, Road 3035
210(05) Decommission, Road 7021
SPS 210 - 4 (2/3/09)
Section 601 - Mobilization
DESCRIPTION
601.01 Add the following to this section:
Work
"Preparatory work shall include cleaning of all equipment before entering National
Forest System Lands. The contractor is required to clean all construction equipment prior to entering National Forest System Lands. This cleaning shall remove all dirt, plant parts, and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within
National Forest System Lands. All subsequent move-ins of equipment shall be treated the same as the initial move-in. Truck beds and dump boxes hauling to the project site must also be cleaned prior to entering the work area.
Prior to initial move-in, the Contractor shall make all construction equipment available for inspection by the Contracting Officer at an agreed upon location. The Contractor shall provide the Contracting Officer at least 24 hours advance notification when equipment is ready for inspection.”
SPS 601 - 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 619 – Riprap
DESCRIPTION
619.01
“This work includes locally obtaining, excavation and placing of rock for the gradient control AS SHOWN ON THE DRAWINGS.”
RIPRAP
CLASS
STONE
WEIGHT
IN LBS
| % SMALLER THAN THE GIVEN |
| 1. 2. & 3. EQUIVALENT CUBIC SIZE |
INCHES
BETWEEN
EQUIVALENT
CUBIC SIZE
MM
REMARKS
<---weight Size------------------------------------------------------>
| VI |
| 400 |
1.Size developed from weight using specific gravity of 2.71 and unit weight of 169 LBS/cubic ft. and then rounded to nearest inch.
2.To determine weight of non cubic rocks - use the following formula:
X=WxDxLx .0978 LBS/Cubic Inch
X = Stone Weight (LBS) W = Width D = Depth L = Length Example:
20"x14"x11"x.0978=301lbs
619.21
“Obtaining, excavation and placing of rock for the gradient control is incidental to Pay Items listed under 210 as shown in the SCHEDULE OF ITEMS and no separate payment shall be made.”
SPS 619 - 1 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 625 - Seeding & Mulching
DESCRIPTION
625.01 Delete in entirety and substitute the following:
“This work shall consist of preparing seedbeds and furnishing and placing required seed. Straw and grass hay bale sediment basins are used for mulch upon completion of stream channel restoration.”
CONSTRUCTION
625.03
Add the following:
Seeding Seasons
“Time of application shall be as specified below:
During the Months marked with an 'X' below:
| JAN |
| FEB |
| MAR |
| APR |
| MAY |
| JUNE |
| JULY |
| AUG |
| SEPT |
| OCT |
| NOV |
| DEC |
| x |
| x |
| x |
| x |
| x |
Should climatic conditions permit, application may be performed outside the months marked above upon written approval by the Contracting Officer.”
625.05
The following is added:
Application
Methods for Seed, “The kinds of seed to be furnished and the amounts to be applied in terms of Fertilizer, pure live seed (PLS) shall be as follows for all channel restoration sites and shall
& Limestone be referred to as Standard Moist Site Mix.
Standard Moist Site Mix
| SPECIES |
| PLS LBS/AC |
| Slender wheatgrass "Pryor" or "Revenue" (Elymus trachycaulus, subspecies trachycaulus) |
| 3.0 |
| Sheep fescue "Durar" (Festuca ovina) |
| 5.0 |
| Mountain brome "Bromar" (Bromus marginatus) |
| 5.0 |
| Annual rye (Lolium multiflorum) |
| 4.0 |
| *Alsike clover (Trifolium hybridum) |
| 2.0 |
| TOTAL |
| 19.0 |
SPS 625 - 1 (2/3/09)
Brown Grizzly Rehab
Acceptable substitutes:
Blue wildrye "Arlington" or "Elkton" (Elymus glaucus) @ 3 PLS LBS/AC for slender wheatgrass.
Streambank wheatgrass "Sodar" @ 3 PLS LBS/AC for slender wheatgrass.
* Streambank wheatgrass "Sodar" @ 1 PLS LBS/AC for Alsike clover if treating weeds with herbicides or if use of Alsike clover would conflict with other resource values.
The kinds of seed to be furnished and the amounts to be applied in terms of pure live seed shall be as follows for all road and other highly disturbed sites and shall be referred to as the Standard Dry Site Mix.
Standard Dry Site Mix
| SPECIES |
| PLS LBS/AC |
| Slender wheatgrass "Pryor" or "Revenue" (Elymus trachycaulu,s subspecies trachycaulus) |
| 6.0 |
| Sheep fescue "Durar" (Festuca ovina) |
| 5.0 |
| Streambank wheatgrass "Sodar" (Elymus lanceolatus, subspecies psammophilus) |
| 3.0 |
| Annual rye (Lolium multiflorum) |
| 2.0 |
| Canby bluegrass "Canbar" (Poa canbyi) |
| 4.0 |
| TOTAL |
| 20.0 |
Acceptable substitutes:
Big bluegrass "Sherman" (Poa ampla) @ 4 PLS LBS/AC for Canby bluegrass.
Pounds of seed to be furnished per acre shall be obtained by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.
Pounds of seed per acre to be furnished shall be obtained by dividing the pounds of pure live seed (PLS) per acre required by the product of the percent purity times the germination rate:
PLS LBS/acre = pounds commercial seed per acre purity x germination
Example:
5 PLS LBS/acre_____ = 6.54 pounds of commercial seed per acre
0.9 x 0.85
(where purity = 90% and germination = 85%)
Apply seed by the Dry Method.”
SPS 625 - 2 (2/3/09)
SPECIAL PROJECT SPECIFICATION
625.06
Application of
Mulch
“After stream channel restoration is completed break open straw or grass hay bales and uniformly scatter on slopes of newly restored stream channel in loose layers no more than 6 inches thick. Mulching shall not be done in the presence of surface water. Apply mulch by the Dry Method.”
625.08
Delete in entirety.
Installation of
Netting & Erosion
Control Blankets
625.11
“Seeding and mulching shall be incidental to Pay Items listed under 210 as shown in the SCHEDULE OF ITEMS and no separate payment shall be made.”
SPS 625 - 3 (2/3/09)
SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab
Section 637 - Equipment Rental
DESCRIPTION
637.01
"Equipment Rental work under this project shall be utilized for additional project work not included and described on the Work Site List or included in the SCHEDULE OF ITEMS."
EQUIPMENT
637.03 Items of
Add the following to paragraph (j):
Equipment
Hydraulic Excavator
(1) 150 SAE Net horsepower.
(2) Tracked, crawler type.
(3) No fluid leaks, machine will near stream.
(4) Bucket must be equipped with hydraulic "thumb", claw style with teeth capable of grasping material.
(5) Hook or Eye on backside of bucket to allow attachment of chain or cable.
Bucket capacity minimum 1.75 yards3.
(6) Hydraulically Operated.
(7) Equipped with a frame mounted hook/eye to accommodate attachment of a cable, chain or choker.
(8) Minimum digging depth of 25 feet.
(9) 1995 model or newer.
*Or similar type of equipment accepted by the Contracting Officer.
SPS 637 - 1 (2/3/09)
637.04
Delete this susbsection in entirety.
Moving of
Equipment
637.07
Replace the first sentence in the second paragraph:
Quantities will include the actual hours, to the nearest quarter hour.
637.08
"Pay Item
Pay Unit
637(12) Hydraulic Excavator . . . . . . . . . . . . . . . . . . . .HR”
SPS 637 - 2 (2/3/09)
REGIONAL SPECIAL PROJECT SPECIFICATION
Brown Grizzly Rehab Section 713 - Roadside Improvement Materials 713.04
Replace the first paragraph with the following paragraph:
Seed “The kinds of grass, legumes and cover crop seed furnished shall be those stipulated in the SPECIAL PROJECT SPECIFICATIONS. All seed shall meet the requirements of Federal Specification-JJJ-S-181, which shall be amended as follows:
All seed purchased shall be certified to be free of noxious weed seeds from weeds listed on the current "All States Noxious Weeds List".
Replace the second paragraph with the following paragraph:
“Seed shall be furnished separately or in mixture in standard containers with (1) seed name; (2) lot number; (3) net weight; (4) percentages of purity and of germination (in case of legumes, percentage of germination to include hard seed); and (5) percentage of maximum weed seed content clearly marked for each kind of seed. The contractor shall furnish the Contracting Officer duplicate signed copies of a statement certifying that each lot of seed has been tested by a certified seed analyst. This statement shall include (1) name and address of laboratory, (2) date of test, (3) lot number for each kind of seed, and (4) results of tests as to name, percentages of purity and of germination, and percentage of weed content for each kind of seed furnished, and, in case of a mixture, the proportions of each kind of seed. Laboratory testing for noxious weeds shall be conducted prior to seed mixing. Only after a finding and documentation in writing of no weeds on the current "All States Noxious Weeds List" will the seed be accepted and used. Legume seed shall be inoculated with approved cultures in accordance with the instructions of the manufacturer. Seed analysis labels attached to the bags shall be provided to the Contracting Officer.”
R01-85 SPS 713 - 1 (4/96)