RECOVERY - Lake Mary Road Bike Path Completion Project
Award Notice Posted
- Solicitation number
- AG-9702-S-10-0408
- Agency
-
Operations Center Southwest
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Spiess Construction Co Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-9702-C-10-0294 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Mammoth Lakes, California 93546, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
RECOVERY: This project is funded by the American Recovery and Reinvestment Act of 2009 (ARRA) and is subject to the requirements of the act. The full solicatation containg all information regarding this project will be posted at fedbisopps.gov on or about May 13, 2010. The purpose of this project is as follows: -To construct approximately 3400 linear feet of 10 ft wide asphalt paved bike path. -To construct a road undercrossing for the bike path where it crosses Lake Mary Road. The undercrossing shall be constructed of precast concrete box culvert sections with an inside dimension of 12 feet by 12 feet with a total length of approx. 100 feet. -To fabricate and install a prefabricated bridge for the bike path where it crosses Mammoth Creek, approx. 80 ft in length and 10 ft wide. -To construct 7 bus pull outs with transit shelters and sidewalks/paths that connect to the bike path. -To construct approx. 9500 square feet of retaining walls. The project is located along Lake Mary Road, between 3 and 5 miles south of its intersection with State Highway 203 within the Town of Mommoth Lakes. The solicitation will cover information regarding a pre-bid tour. Government Estimate Range: Between $1,000,000.00 and $5,000,000.00 ----------------------------------------------------------------------------------------------------------------- Amend Notice: This synopsis is being amended to change response date to July 26, 2010. The new closing date will be 30 days from the date that the complete specifications and solicitation package are made available on the FBO website (tentatively scheduled to be available on June 25).
Update #2 ·
RECOVERY: This project is funded by the American Recovery and Reinvestment Act of 2009 (ARRA) and is subject to the requirements of the act. The full solicatation containg all information regarding this project will be posted at fedbisopps.gov on or about May 13, 2010.
The purpose of this project is as follows:
-To construct approximately 3400 linear feet of 10 ft wide asphalt paved bike path.
-To construct a road undercrossing for the bike path where it crosses Lake Mary Road. The undercrossing shall be constructed of precast concrete box culvert sections with an inside dimension of 12 feet by 12 feet with a total length of approx. 100 feet.
-To fabricate and install a prefabricated bridge for the bike path where it crosses Mammoth Creek, approx. 80 ft in length and 10 ft wide.
-To construct 7 bus pull outs with transit shelters and sidewalks/paths that connect to the bike path.
-To construct approx. 9500 square feet of retaining walls.
The project is located along Lake Mary Road, between 3 and 5 miles south of its intersection with State Highway 203 within the Town of Mommoth Lakes.
The solicitation will cover information regarding a pre-bid tour.
Government Estimate Range: Between $1,000,000.00 and $5,000,000.00
-----------------------------------------------------------------------------------------------------------------
Amend Notice: This synopsis is being amended to change response date to July 26, 2010. The new closing date will be 30 days from the date that the complete specifications and solicitation package are made available on the FBO website (tentatively scheduled to be available on June 25).
Update #1 ·
RECOVERY: This project is funded by the American Recovery and Reinvestment Act of 2009 (ARRA) and is subject to the requirements of the act. The full solicatation containg all information regarding this project will be posted at fedbisopps.gov on or about May 13, 2010.
The purpose of this project is as follows:
-To construct approximately 3400 linear feet of 10 ft wide asphalt paved bike path.
-To construct a road undercrossing for the bike path where it crosses Lake Mary Road. The undercrossing shall be constructed of precast concrete box culvert sections with an inside dimension of 12 feet by 12 feet with a total length of approx. 100 feet.
-To fabricate and install a prefabricated bridge for the bike path where it crosses Mammoth Creek, approx. 80 ft in length and 10 ft wide.
-To construct 7 bus pull outs with transit shelters and sidewalks/paths that connect to the bike path.
-To construct approx. 9500 square feet of retaining walls.
The project is located along Lake Mary Road, between 3 and 5 miles south of its intersection with State Highway 203 within the Town of Mommoth Lakes.
The solicitation will cover information regarding a pre-bid tour.
Government Estimate Range: Between $1,000,000.00 and $5,000,000.00