RECOVERY - ID PFH 6030(1), Salmon-Challis National Forest Bridge Replacements Design-Build

Solicitation Posted

Solicitation number
DTFH70-09-R-00033
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

This soilicitation represented Phase 1 of a 2-Phase design/build solicitation. We are canceling this solicitation since Phase I has been completed.

A Phase-2 notice has been issued under Solicitation #DTFH70-10-R-00009.

Short-listed firms have been asked to compete for contract award under Phase-2. Phase-2 documents are NOT public and will NOT be posted on the FBO. 

If you would like to be considered as a subcontractor or supplier under Phase-2, please add your name to the Interested Venders List for Solicitaion DTFH70-10-R-00009.




Update #5 ·

Western Federal Lands Highway Division (WFLHD) is conducting a two-phased Design-Build (D-B) selection process for project ID PFH 6030(1), Salmon-Challis National Forest Bridge Replacements located in Lemhi County, Idaho.



--------------------------

Timeline update issued 1-14-2010



Our current time line for this solicitation:



By January 22, 1010 Offeror notification complete for Phase I



April/May 2010 Phase II solicitation available



Time to respond to Phase II solicitation - approximately 45 days



Early-to-mid September 2010 Contract Award



Fall 2012 Estimated Construction Completion

-----------------------------



Under this Notice, WFLHD is soliciting D-B firm/teams to participate in Phase One Qualification Based Selection of a two-phased selection process to determine which D-B firm/teams are the most qualified to manage, design, and build the project. Through this process, WFLHD will create a short list of no more than three D-B firms/teams. D-B firms/teams placed on the short list will then be eligible to submit Technical and Price proposals for Phase Two of the process. Responses from individual construction or consultant firms not offering to provide all required services will not be accepted.



This synopsis and Phase One Request for Qualifications is being issued concurrently with the development and review of the environmental documentation that will determine the final Scope of Work and other project requirements. Any Work described herein is subject to adjustment as a result of the environmental documentation and by other decisions of the Government.



PROJECT DESCRIPTION



The Salmon-Challis National Forest is located in Lemhi County, Idaho. The proposed project is to design and construct replacements for three deficient bridges.



Pine Creek Bridge over the Salmon River, Milepost 20.4 (existing bridge is 165 feet long),

Little Pine Creek Bridge over Pine Creek, Milepost 20.5 (existing bridge is approximately 20 feet long),

Cove Creek Bridge over the Salmon River, Milepost 28.3 (existing bridge is 195 feet long), and

Construct or reconstruct bridge approaches.



The roadway approaches are up to 1,575 feet long and may include both cut and fill retaining walls. Access to the sites is from Forest Road 6030 (turn off US HWY 93, Milepost 0.0, at North Fork, ID).



The proposed project limits are within existing National Forest right-of-way. The design and construction cost for this project is estimated to be between $5,000,000 and $8,000,000.

Update #4 ·

UPDATE - December 8, 2009



The evaluation team is continuing their review and evaluation of the Statement of Qualifications received. Due to the volume of responses, it is taking longer than originally expected.



We anticipate the short list of firms will be released in early/mid January 2010.



Information will be posted to the Federal Business Opportunities website when available.

Update #3 ·

Add RECOVERY to the project title

Update #2 ·

The REQUEST FOR QUALIFICATIONS (RFQ) package is anticipated to be issued within the next 2 weeks and will be posted to this site.



The RFQ will contain all the information needed for Design-Build firms/teams to submit their qualifications for the Phase 1 evaluation.

Update #1 ·

Western Federal Lands Highway Division (WFLHD) is conducting a two-phased Design-Build (D-B) selection process for project ID PFH 6030(1), Salmon-Challis National Forest Bridge Replacements located in Lemhi County, Idaho.



Under this Notice, WFLHD is soliciting D-B firm/teams to participate in Phase One Qualification Based Selection of a two-phased selection process to determine which D-B firm/teams are the most qualified to manage, design, and build the project. Through this process, WFLHD will create a short list of no more than three D-B firms/teams. D-B firms/teams placed on the short list will then be eligible to submit Technical and Price proposals for Phase Two of the process. Responses from individual construction or consultant firms not offering to provide all required services will not be accepted.



This synopsis and Phase One Request for Qualifications is being issued concurrently with the development and review of the environmental documentation that will determine the final Scope of Work and other project requirements. Any Work described herein is subject to adjustment as a result of the environmental documentation and by other decisions of the Government.



PROJECT DESCRIPTION



The Salmon-Challis National Forest is located in Lemhi County, Idaho. The proposed project is to design and construct replacements for three deficient bridges.



Pine Creek Bridge over the Salmon River, Milepost 20.4 (existing bridge is 165 feet long),

Little Pine Creek Bridge over Pine Creek, Milepost 20.5 (existing bridge is approximately 20 feet long),

Cove Creek Bridge over the Salmon River, Milepost 28.3 (existing bridge is 195 feet long), and

Construct or reconstruct bridge approaches.



The roadway approaches are up to 1,575 feet long and may include both cut and fill retaining walls. Access to the sites is from Forest Road 6030 (turn off US HWY 93, Milepost 0.0, at North Fork, ID).



The proposed project limits are within existing National Forest right-of-way. The design and construction cost for this project is estimated to be between $5,000,000 and $8,000,000.

Files

File Type Posted
A002_SalmonD_B.pdf PDF
questionnaire.doc DOC document
A001_SalmonD_B.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/qa/view.htm pid 27852 —
http //www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm HTM file
sf330_part2_ext_pages.doc DOC document
sf330_extra_F.pdf PDF
sf330_e.pdf PDF
sf330_extra_F.doc DOC document
sf330.doc DOC document
sf330_extra_E.doc DOC document
SF330_Sec_extra_E.pdf PDF
RFQLtr_fbo.pdf PDF
sf330_Part2_ext_pages.pdf PDF
Show all 14

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors