- RECOVERY - ID PFH 6030(1), Salmon-Challis National Forest Bridge Replacements Design-Build
- Solicitation number
- DTFH70-09-R-00033
About this file
MS Word Version of the Questionnaire
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A002_SalmonD_B.pdf | ||
| A001_SalmonD_B.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm | HTM file | |
| http //www.wfl.fhwa.dot.gov/contracting/construction/qa/view.htm pid 27852 | — | |
| RFQLtr_fbo.pdf | ||
| sf330.doc | DOC document | |
| sf330_Part2_ext_pages.pdf | ||
| sf330_part2_ext_pages.doc | DOC document | |
| sf330_extra_F.pdf | ||
| sf330_extra_E.doc | DOC document | |
| SF330_Sec_extra_E.pdf | ||
| sf330_extra_F.doc | DOC document | |
| sf330_e.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID PFH 6030(1),
Salmon-Challis National Forest Bridge Replacements Design-Build (D-B) Solicitation
Request For Qualifications (RFQ)
TO:
FACSIMILE:
PHONE:
EMAIL:_____________________
ATTACHMENT 5
INFORMATION REQUEST FOR
PAST PERFORMANCE
(Questionnaire)
Western Federal Lands Highway Division (WFLHD) is currently in the process of soliciting offers for a contract. Specifically, they are looking for past performance information in the following areas:
Planning, Scheduling and Coordination
Change Management (Collaboration with Owner)
Quality Control System
Project Superintendence and Management Personnel
Subcontract Management
In order for WFLHD to complete its evaluation, the attached questionnaire must be completed and submitted directly to WFLHD not later than the proposal due date which is currently _____________________. The completed questionnaire may be mailed, e-mailed or faxed to:
Attn: Michael Johnson
(Mailroom – Do not open)
Western Federal Lands Highway Division
610 East Fifth Street
Vancouver WA 98661-3801
FAX: (360) 619-7932
E-MAIL: WFL.Contracts@dot.gov
For your convenience, a cover sheet for use in mailing/faxing is provided below.
NOTE: Pages 9 through 11 of this package may be filled in by the offeror OR by the owner/agency for the project. ALL remaining pages must be completed by the owner/agency AND the questionnaire must be submitted by the owner/agency of the project.
| Western Federal Lands Highway Division |
| Attn: Contracts |
610 East Fifth Street
Vancouver WA 98661-3801
From:
(Name and Address of Firm)
(Point of Contact Name): __________________________________________________
(Facsimile/Phone Number)__________________________________________________
(E-mail Address)__________________________________________________
To (Point of Contact Name)
__CONTRACTS_
610 East Fifth Street
Vancouver WA 98661-3801
Envelope must be marked: “DTFH70-09-R-00033. For Addressee Only”
(Facsimile Number) __(360) 619-7932___ (E-mail Address)__ WFL.Contracts@dot.gov__________ Source Selection Information
See FAR 2.101 and 3.104
(Applicable when filled-in)
Project Past Performance Questionnaire (Submitted by Owner/Agency)
Directions: To be completed by the Owner/Agency and submitted directly to:
ATTN: CONTRACTS
FAX: (360) 619-7932
Federal Highway Administration
610 East Fifth Street E-MAIL: WFL.Contracts@dot.gov Vancouver, WA 98661-3801
Part A - General Information (to be completed by the contractor):
Contractor’s Name
Contractor Name:
Owner/Agency
Contact Name:
Contact Number:
Project Title
Project Number
Contract Number
Project Location
(Town/State/Forest…)
Description of Work provided by the Contractor:
Contract Information for project listed above (to be completed by the Owner/Agency):
Contract Award Date:
Contract Start Date:
Original Completion Date:
Final Completion Date:
Initial Contract Amount
Final Contract Amount
| Were liquidated damages assessed for late completion? |
| __ Yes |
| __ No |
| Was a contractor evaluation prepared? |
| __ Yes |
| __ No |
| If yes what was the overall rating? |
Project Past Performance Questionnaire (Submitted by Owner/Agency)
Evaluation Factor Rating System. Please provide ratings and comments regarding the Contractor’s performance in each area below using the following ratings:
N/A=Not Applicable U=Unsatisfactory P=Poor F=Fair G=Good E=Excellent O=Outstanding
· Unsatisfactory--Response to inquiries, technical/service/administrative issues is not effective
· Poor--Response to inquiries, technical/service/administrative issues is marginally effective
· Fair--Response to inquiries, technical/service/administrative issues is somewhat effective
· Good--Response to inquiries, technical/service/administrative issues is usually effective
· Excellent--Response to inquiries, technical/service/administrative issues is effective
· Outstanding--The contractor has demonstrated an outstanding performance level that justifies adding a point to the score. (It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".)
For ratings of “Unsatisfactory” and “Poor” please provide a brief explanation in the remarks section.
Planning, Scheduling and Coordination
| Developed realistic progress schedules, met established milestones, and submitted updated progress schedules as required. |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Scheduling changes were clearly communicated to the workforce, suppliers and owner agency representatives. |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| How would you rate the contractors overall project management performance in the areas of Planning, Scheduling and Coordination? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
Change Management (Collaboration with Owner)
| Supporting price/cost information for modifications was accurate, complete, and reasonable. |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| The contractor effectively collaborated with the owner in an equitable, businesslike and timely manner to come to satisfactory agreements. |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| How would you rate the contractor’s overall effort at collaboration with the owner agency in problem solving? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
Quality Control System
| Did the contractor follow their contractor quality control plan? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Was quality control (QC) documentation timely and adequate? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did the contractor’s QC program effectively monitor all work including that of subcontractors? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
Did the contractor consistently take responsibility to ensure that all work met contract requirements?
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did the contractor complete work in accordance with the specifications without owner agency presence? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
Project Superintendence and Management Personnel
| Did project superintendence and management personnel foster an attitude of contract compliance? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did project superintendence and management personnel act promptly to resolve problems? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did project superintendence and management personnel have sufficient authority to make decisions or to take appropriate actions. |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Project superintendence and management personnel were consistently present and on site when work was performed. |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did project superintendence and management personnel deal in an ethical, collaborative and businesslike manner with owner agency representatives, workforce, subcontractors and suppliers? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
Subcontract Management
| Did the contractor take accountability for subcontractor performance? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did the contractor coordinate with subcontractors regarding changes to schedules or work? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did contractor include subcontractors in daily contractor quality control activities? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did contractor effectively represent subcontractors to the owner concerning changes or construction problems? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Did contractor facilitate corrective actions to ensure subcontractor work was completed in a timely and satisfactory manner? |
| N/A |
| U |
| P |
| F |
| G |
| E |
| O |
| Was the Contractor committed to customer satisfaction? |
| Yes |
| No |
Remarks: