questionnaire.doc

DOC document 140 KB Posted

Attached to
RECOVERY - ID PFH 6030(1), Salmon-Challis National Forest Bridge Replacements Design-Build
Solicitation number
DTFH70-09-R-00033
Issued by

About this file

MS Word Version of the Questionnaire

View the file

Other files

File Type Posted
A002_SalmonD_B.pdf PDF
A001_SalmonD_B.pdf PDF
http //www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm HTM file
http //www.wfl.fhwa.dot.gov/contracting/construction/qa/view.htm pid 27852 —
RFQLtr_fbo.pdf PDF
sf330.doc DOC document
sf330_Part2_ext_pages.pdf PDF
sf330_part2_ext_pages.doc DOC document
sf330_extra_F.pdf PDF
sf330_extra_E.doc DOC document
SF330_Sec_extra_E.pdf PDF
sf330_extra_F.doc DOC document
sf330_e.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID PFH 6030(1),

Salmon-Challis National Forest Bridge Replacements Design-Build (D-B) Solicitation

Request For Qualifications (RFQ)

TO:

FACSIMILE:

PHONE:

EMAIL:_____________________

ATTACHMENT 5

INFORMATION REQUEST FOR

PAST PERFORMANCE

(Questionnaire)

Western Federal Lands Highway Division (WFLHD) is currently in the process of soliciting offers for a contract. Specifically, they are looking for past performance information in the following areas:

Planning, Scheduling and Coordination

Change Management (Collaboration with Owner)

Quality Control System

Project Superintendence and Management Personnel

Subcontract Management

In order for WFLHD to complete its evaluation, the attached questionnaire must be completed and submitted directly to WFLHD not later than the proposal due date which is currently _____________________. The completed questionnaire may be mailed, e-mailed or faxed to:

Attn: Michael Johnson

(Mailroom – Do not open)

Western Federal Lands Highway Division

610 East Fifth Street

Vancouver WA 98661-3801

FAX: (360) 619-7932

E-MAIL: WFL.Contracts@dot.gov

For your convenience, a cover sheet for use in mailing/faxing is provided below.

NOTE: Pages 9 through 11 of this package may be filled in by the offeror OR by the owner/agency for the project. ALL remaining pages must be completed by the owner/agency AND the questionnaire must be submitted by the owner/agency of the project.

Western Federal Lands Highway Division
Attn: Contracts

610 East Fifth Street

Vancouver WA 98661-3801

From:

(Name and Address of Firm)

(Point of Contact Name): __________________________________________________

(Facsimile/Phone Number)__________________________________________________

(E-mail Address)__________________________________________________

To (Point of Contact Name)

__CONTRACTS_

610 East Fifth Street

Vancouver WA 98661-3801

Envelope must be marked: “DTFH70-09-R-00033. For Addressee Only”

(Facsimile Number) __(360) 619-7932___ (E-mail Address)__ WFL.Contracts@dot.gov__________ Source Selection Information

See FAR 2.101 and 3.104

(Applicable when filled-in)

Project Past Performance Questionnaire (Submitted by Owner/Agency)

Directions: To be completed by the Owner/Agency and submitted directly to:

ATTN: CONTRACTS

FAX: (360) 619-7932

Federal Highway Administration

610 East Fifth Street E-MAIL: WFL.Contracts@dot.gov Vancouver, WA 98661-3801

Part A - General Information (to be completed by the contractor):

Contractor’s Name

Contractor Name:

Owner/Agency

Contact Name:

Contact Number:

Project Title

Project Number

Contract Number

Project Location

(Town/State/Forest…)

Description of Work provided by the Contractor:

Contract Information for project listed above (to be completed by the Owner/Agency):

Contract Award Date:

Contract Start Date:

Original Completion Date:

Final Completion Date:

Initial Contract Amount

Final Contract Amount

Were liquidated damages assessed for late completion?
__ Yes
__ No
Was a contractor evaluation prepared?
__ Yes
__ No
If yes what was the overall rating?

Project Past Performance Questionnaire (Submitted by Owner/Agency)

Evaluation Factor Rating System. Please provide ratings and comments regarding the Contractor’s performance in each area below using the following ratings:

N/A=Not Applicable U=Unsatisfactory P=Poor F=Fair G=Good E=Excellent O=Outstanding

· Unsatisfactory--Response to inquiries, technical/service/administrative issues is not effective

· Poor--Response to inquiries, technical/service/administrative issues is marginally effective

· Fair--Response to inquiries, technical/service/administrative issues is somewhat effective

· Good--Response to inquiries, technical/service/administrative issues is usually effective

· Excellent--Response to inquiries, technical/service/administrative issues is effective

· Outstanding--The contractor has demonstrated an outstanding performance level that justifies adding a point to the score. (It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".)

For ratings of “Unsatisfactory” and “Poor” please provide a brief explanation in the remarks section.

Planning, Scheduling and Coordination

Developed realistic progress schedules, met established milestones, and submitted updated progress schedules as required.
N/A
U
P
F
G
E
O
Scheduling changes were clearly communicated to the workforce, suppliers and owner agency representatives.
N/A
U
P
F
G
E
O
How would you rate the contractors overall project management performance in the areas of Planning, Scheduling and Coordination?
N/A
U
P
F
G
E
O

Change Management (Collaboration with Owner)

Supporting price/cost information for modifications was accurate, complete, and reasonable.
N/A
U
P
F
G
E
O
The contractor effectively collaborated with the owner in an equitable, businesslike and timely manner to come to satisfactory agreements.
N/A
U
P
F
G
E
O
How would you rate the contractor’s overall effort at collaboration with the owner agency in problem solving?
N/A
U
P
F
G
E
O

Quality Control System

Did the contractor follow their contractor quality control plan?
N/A
U
P
F
G
E
O
Was quality control (QC) documentation timely and adequate?
N/A
U
P
F
G
E
O
Did the contractor’s QC program effectively monitor all work including that of subcontractors?
N/A
U
P
F
G
E
O

Did the contractor consistently take responsibility to ensure that all work met contract requirements?

N/A
U
P
F
G
E
O
Did the contractor complete work in accordance with the specifications without owner agency presence?
N/A
U
P
F
G
E
O

Project Superintendence and Management Personnel

Did project superintendence and management personnel foster an attitude of contract compliance?
N/A
U
P
F
G
E
O
Did project superintendence and management personnel act promptly to resolve problems?
N/A
U
P
F
G
E
O
Did project superintendence and management personnel have sufficient authority to make decisions or to take appropriate actions.
N/A
U
P
F
G
E
O
Project superintendence and management personnel were consistently present and on site when work was performed.
N/A
U
P
F
G
E
O
Did project superintendence and management personnel deal in an ethical, collaborative and businesslike manner with owner agency representatives, workforce, subcontractors and suppliers?
N/A
U
P
F
G
E
O

Subcontract Management

Did the contractor take accountability for subcontractor performance?
N/A
U
P
F
G
E
O
Did the contractor coordinate with subcontractors regarding changes to schedules or work?
N/A
U
P
F
G
E
O
Did contractor include subcontractors in daily contractor quality control activities?
N/A
U
P
F
G
E
O
Did contractor effectively represent subcontractors to the owner concerning changes or construction problems?
N/A
U
P
F
G
E
O
Did contractor facilitate corrective actions to ensure subcontractor work was completed in a timely and satisfactory manner?
N/A
U
P
F
G
E
O
Was the Contractor committed to customer satisfaction?
Yes
No

Remarks:

Source Selection Information