Request for Qualifications Qualification Requirements Submittals Due Date and Time
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A002_SalmonD_B.pdf | ||
| questionnaire.doc | DOC document | |
| A001_SalmonD_B.pdf | ||
| http //www.wfl.fhwa.dot.gov/contracting/construction/advertised.htm | HTM file | |
| http //www.wfl.fhwa.dot.gov/contracting/construction/qa/view.htm pid 27852 | — | |
| sf330.doc | DOC document | |
| sf330_Part2_ext_pages.pdf | ||
| sf330_part2_ext_pages.doc | DOC document | |
| sf330_extra_F.pdf | ||
| sf330_extra_E.doc | DOC document | |
| SF330_Sec_extra_E.pdf | ||
| sf330_extra_F.doc | DOC document | |
| sf330_e.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
610 East Fifth Street Vancouver, WA 98661-3801
(360) 619-7520 FAX: (360) 619-7932
Western Federal Lands Highway Division
ELECTRONIC DISTRIBUTION ONLY
ATTN: Interested Firms
ID PFH 6030(1),
Salmon-Challis National Forest Bridge Replacements
Design-Build (D-B) Solicitation Request For Qualifications (RFQ)
Solicitation Number DTFH70-09-R-00033
In accordance with Public Law 104-106 (41 U.S.C. 253m), the Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration is conducting a "two phased" D-B selection process. Under this Notice, WFLHD is soliciting D-B firms/teams to participate in Phase I – Qualifications Based Selection – of this "two phased" D-B selection process.
This Request for Qualifications is being issued concurrently with the development and review of the environmental documentation that will determine the final Scope of Work and other project requirements. Any Work described herein is subject to adjustment as a result of the environmental documentation and by other decisions of the Government.
The North American Industry Classification System (NAICS) code for this acquisition is 237310 Highway, Street, and Bridge Construction; the small business size standard is $33.5 million.
This is NOT a request for proposal. A solicitation package is not available.
SUBMIT ONE ORIGINAL AND THREE (3) COPIES (PAPER COPIES ONLY) OF YOUR
RESPONSE BY 2:00PM LOCAL TIME NOVEMBER 3, 2009.
ATTN CONTRACTING – DTFH70-09-R-000033
DO NOT OPEN
Western Federal Lands Highway Division 610 East Fifth Street Vancouver, WA 98661-3801
Submit questions to WFL.Contracts@dot.gov.
Sincerely yours, ---Original Signed--- Michael L. Johnson Contracting Officer
(5) Attachments:
1-Project Description 2-Procurement Process Overview 3-Request for Qualification Evaluation Criteria 4-Submittals 5-Information Request for Past Performance (Questionnaire)
September 15, 2009
Design-Build (D-B) Solicitation Request For Qualifications (RFQ)
ATTACHMENT 1
PROJECT DESCRIPTION
The Salmon-Challis National Forest is located in Lemhi County, Idaho. The proposed project is to design and construct replacements for three deficient bridges.
• Pine Creek Bridge over the Salmon River, Milepost 20.4 (existing bridge is 165 feet long),
• Little Pine Creek Bridge over Pine Creek, Milepost 20.5 (existing bridge is approximately 20 feet long),
• Cove Creek Bridge over the Salmon River, Milepost 28.3 (existing bridge is 195 feet long), and
• Construct or reconstruct bridge approaches.
The roadway approaches are up to 1,575 feet long and may include both cut and fill retaining walls. Access to the sites is from Forest Road 6030 (turn off US HWY 93, Milepost 0.0, at North Fork, ID).
The proposed project limits are within existing National Forest right-of-way. The design and construction cost for this project is estimated to be between $5,000,000 and $8,000,000.
Design-Build Scope of Work (SOW): The SOW for this project includes Design and Construction work, Project Management and Quality Assurance/Quality Control (QA/QC) for Design and Construction including Materials Sampling and Testing and includes, but is not limited to, the following:
Design Work:
• Roadway design
• Bridge design (permanent and temporary)
• Context sensitive design/bridge work
• Soil erosion and sediment control design
• Retaining wall design
• Hydraulic design
• Temporary support of excavation and safety protection systems design
• Temporary Traffic Control
• Geotechnical design
Construction Work:
• Construction of bridge
• Construction of bridge temporary work
• Construction of roadways
• Construction of drainage devices, and storm water management facilities
• Construction of retaining wall
• Construction of guardwall
• Installation of temporary and permanent sediment and erosion control measures
• Obtaining some or all permits and implementing permit requirements including erosion and sediment control measures
• Installation of sheeting, shoring, and other temporary safety protection devices
• Installation of temporary traffic control devices
• Utility coordination
• Removal of existing structures
Design-Build (D-B) Solicitation
ATTACHMENT 2
PROCUREMENT PROCESS OVERVIEW
Phase I A selection committee will review and evaluate the Statement of Qualifications (SOQ) submitted by all responsive Design-Build firms/teams (Offerors).
After receipt of the Phase I Statement of Qualifications, an Evaluation Board will select a “short list” of three (3) of the most highly qualified D-B firm/team’s to participate in Phase II of this D- B selection process based on the established Request for Qualification (RFQ) Evaluation Criteria. The unsuccessful firms/teams will be notified once the short list has been selected.
It is not the intent of WFLHD to receive project specific design or engineering recommendations as part of the Phase I process. D-B firm/team’s should limit their SOQ’s to the information required by this notice, and other information that may be relevant to the qualifications and experience of the D-B firm/team’s. No reimbursement will be made for any expenses associated with the preparation of Phase I SOQ’s.
Phase II The short-listed D-B firms/teams will be sent a Request for Proposal (RFP), which will outline the remainder of the selection process requirements. The RFP will contain the requirements necessary for the short-listed D-B firms/teams to submit both a Technical Proposal and a Price Proposal.
After receipt of the Phase II Technical and Price Proposals, an Evaluation Board will conduct a "best value" analysis, and submit their recommendations to the Selection Official for approval.
Award of one Firm Fixed Price contract is anticipated.
A stipend will be awarded to each Phase II offeror who provides a responsive, but unsuccessful proposal.
Design-Build (D-B) Solicitation
ATTACHMENT 3
REQUEST FOR QUALIFICATION EVALUATION CRITERIA
Phase I Evaluation and Weighting Criteria: D-B firms/teams will be evaluated using the following criteria and weightings:
1. Criteria 1: Experience (Total Maximum Score = 25). The Government will review and evaluate the D-B firms/team individual qualifications and experience in highway and bridge design/construction, including technical and geographical similarities between the referenced experience/qualifications and the work described in this solicitation.
Submit documentation for each key individual indicating their specific experience within the past five (5) years and qualifications for performing technically the same or similar bridge, highway, geotechnical, erosion control, permitting, project management, construction and QA/QC work. As a minimum, include documentation for the following key personnel each having a minimum of two (2) years experience within the past five (5) years performing technically the same or similar proposed construction method including experience on bridges and on steep terrain environments:
(NOTE: If one individual will be fulfilling multiple roles during the project, list how that individual meets the experience and expertise separately for EACH position)
PROJECT KEY PERSONNEL
• Design-Build Project Manager - The Contractor’s principal point of contact for all activities throughout the entire design-build process.
• Project QA/QC Manager - The Contractor’s single point of responsibility for coordinating the flow of the design quality control through construction and responsible for all quality assurance and quality control procedures and decisions.
The Project QA/QC Manager may also function as the Design QA/QC Manager and Construction QA/QC Manager.
DESIGN KEY PERSONNEL
• Designer of Record - The Contractor’s single point of responsibility for all design procedures and decisions. This individual shall be a registered, licensed, Professional Engineer in the State of Idaho.
• Bridge Engineer – The Contractor’s representative in charge of the bridge design.
• Geotechnical Engineer - The Contractor’s representative in charge of the bridge foundation design.
• Design QA/QC Manager – The design QA/QC representative responsible for implementing the design QA/QC program referenced in Criteria 3(A).
Design-Build (D-B) Solicitation
CONSTRUCTION KEY PERSONNEL
• Project/Construction Engineer – Supports the construction superintendent (paperwork, on-call, etc…).
• Construction Superintendent – The Contractor’s on-site authorized representative in charge of the construction work.
• Construction QA/QC Manager – The construction QA/QC representative responsible for implementing the construction QA/QC program referenced in Criteria 3(B).
Obligation to keep Key Personnel intact:
In connection with the services covered by this procurement process, Key Personnel will be limited to the individuals or firms that are specifically identified during the RFQ submittal process. The successful contractor’s Key Personnel will be incorporated into the awarded contract. The contractor shall obtain the Contracting Officer’s written consent before making any substitution for the Key Personnel.
2. Criteria 2: Construction Capability and Resources (Maximum Score = 25). The Government will review and evaluate the information about the D-B firm/team past performance in the design and construction of roadway and bridge projects based on the
(1) Project Organizational Structure and (2) Past Performance Questionnaires for projects similar in size and scope.
PROJECT ORGANIZATIONAL STRUCTURE
Submit the organizational structure, identifying major participants and describing their roles in the project. Identify how each partner and subcontractor will interact and fit into the overall D-B team makeup. Submit documentation that shows direct experience of the D-B firms/teams, joint venture partners, D-B firms/teams related by an ownership agreement, and/or experience of subcontractors that the D-B firms/teams proposes to utilize in the execution of this project. The successful contractor’s submittal will be incorporated into the awarded contract.
DESIGN PAST PERFORMANCE
List at least three (3), but no more than five (5), roadway and bridge projects performed in the past three (3) years. Identify any projects where the lead construction contractor and the lead designer have worked together, on the same project, in a Design-Build relationship. If any D-B project is provided as a reference that was not performed together by the lead design firm and lead construction contractor, then the D-B firms/teams shall identify the design professional or construction entity with whom it contracted for each such project.
Provide the attached questionnaire to the owner/agency to complete for each of the 3 to 5 projects.
Design-Build (D-B) Solicitation
CONSTRUCTION PAST PERFORMANCE
List at least three (3), but no more than five (5), roadway and bridge projects with a contract value of greater than $5,000,000 performed in the past three (3) years.
Identify any projects where the lead construction contractor and the lead designer have worked together, on the same project, in a Design-Build relationship. If any D-B project is provided as a reference that was not performed together by the lead design firm and lead construction contractor, then the D-B firms/teams shall identify the design professional or construction entity with whom it contracted for each such project.
Provide the attached questionnaire to the owner/agency to complete for each of the 3 to 5 projects.
3. Criteria 3: Quality Control Plan (Total Maximum Score = 20). The Government will review and evaluate each Offeror’s quality control plan to assess the soundness and reasonableness of the Offeror's planned QA/QC for Design and Construction including Materials Sampling and Testing.
A. Design Quality Control Plan.
Submit a description of the system to be used to manage the design schedule, and the management system to control cost and quality. Describe how the system(s) will interact with and support the construction operation. Describe how the system(s) will be updated and monitored. The successful contractor’s submittal will be incorporated into the awarded contract.
B. Construction Quality Control Plan
Submit a description of the system to be used to manage the construction schedule, and the management system to control cost and quality. Describe how the system(s) will interact with the design operation. Describe how the system(s) will be updated and monitored. The successful contractor’s submittal will be incorporated into the awarded contract.
4. Design Build Understanding and Approach (Total Maximum Score = 20). The Government will review and evaluate each D-B firm/teams understanding of tasks involved in a D-B project and approach to managing, designing and constructing the project.
Submit a general description of the tasks involved in the D-B process and the approach the Offeror will take for design and construction administration, including the involvement of the design members of the Offeror's team during construction.
Identify potential risk factors, special issues or problems that are likely to be encountered and explain the approach to mitigate those risks, issues or problems.
Include discussion on how the Offeror intends to maximize the benefits of the D-B process.
Design-Build (D-B) Solicitation
5. Financial Condition (Total Maximum Score = 10). The Government will review and evaluate each D-B firm/team’s financial condition to perform the design and construction of the project.
Submit a letter from your bonding agent identifying the D-B firm/team’s ability to obtain bonding of $10 million for a single contract. The surety must be a surety included in the Department of the Treasury's Listing of Approved Sureties (Department Circular 570).
Describe any project that the D-B firm/team’s were involved in within the past five
(5) years that resulted in items (a) through (d) below. For any such situation, explain the circumstances and identify the project owner’s representative and his/her current telephone number.
(a) The assessment of liquidated damages against one of such parties;
(b) Claims being submitted against one of such parties;
(c) Receiving a notice to cure a default due to the party’s non-performance or poor performance of the underlying contract; or
(d) Termination for default/cause.
Disclose any outstanding litigation that could materially or adversely affect the financial condition of the D-B firm/team’s.
Design-Build (D-B) Solicitation
ATTACHMENT 4
SUBMITTALS
Phase I Submittals: Statement of Qualification Interested D-B firms/teams may use the Standard Form (SF) 330 U.S. Government Architect-Engineer Qualifications, as the basis for their SOQ. SF 330’s are available on the U.S. General Services Administration website at: http://www.gsa.gov/forms/. Although the SF 330 is formatted for Architect- Engineer and Related Services, the construction elements of the D-B firms/teams SOQ may also be included on the SF 330. Alternate forms and formats may be submitted, provided that the applicable information from the SF 330 is included. The Phase I SOQ shall be bound and tabbed with the major headings.
Each Offeror must provide one (1) original AND three (3) copies of the completed SOQ. The SOQ should contain no more than thirty (30) pages typed on one side only. The SOQ shall be written on 8.5" x 11" paper. If dividers or photos are used and contain project-specific information they will be counted as pages. All SOQs shall be written using Times New Roman with a font no smaller than 12-point. The SOQ should address each of the rating categories in the same order as listed above.
Submit the original and copies of the completed SOQ to the following address:
Attn: Michael L. Johnson (Do Not Open) Federal Highway Administration
Western Federal Lands Highway Division 610 East Fifth Street Vancouver, WA 98661
(Fax and email submissions will not be accepted.)
Questions concerning this solicitation shall be submitted via e-mail to wfl.contracts@dot.gov. Only e-mail inquiries will be considered. No oral inquiries will be considered.
Phase I Submittals: Questionnaires The Questionnaires must be submitted by the contracting agency/owner by US Mail, overnight delivery, email or fax to:
Mail/Overnight: Attn: Michael Johnson (Mailroom – Do not open)
Western Federal Lands Highway Division 610 East Fifth Street Vancouver WA 98661-3801
Email: wfl.contracts@ dot.gov
FAX: 360.619.7932
NOTE: The responsibility to send out and track the completion of the questionnaires including Government agencies’ or private sector companies’ submittal to the Contracting Officer rests solely with the Offeror. Questionnaires received directly from the offeror will NOT be evaluated. The offeror may verify receipt of these questionnaires by contacting Michael Johnson, Contracting Officer, at wfl.contracts@dot.gov or 360.619.7521 (phone.) The completed forms must be received no later than the date/time set for receipt of proposals.
Design-Build (D-B) Solicitation
TO: FACSIMILE:
PHONE: EMAIL:_____________________
ATTACHMENT 5
INFORMATION REQUEST FOR
PAST PERFORMANCE
(Questionnaire)
Western Federal Lands Highway Division (WFLHD) is currently in the process of soliciting offers for a contract. Specifically, they are looking for past performance information in the following areas:
Planning, Scheduling and Coordination Change Management (Collaboration with Owner) Quality Control System Project Superintendence and Management Personnel Subcontract Management
In order for WFLHD to complete its evaluation, the attached questionnaire must be completed and submitted directly to WFLHD not later than the proposal due date which is currently _____________________. The completed questionnaire may be mailed, e-mailed or faxed to:
Attn: Michael Johnson
(Mailroom – Do not open) Western Federal Lands Highway Division 610 East Fifth Street Vancouver WA 98661-3801
FAX: (360) 619-7932
E-MAIL: WFL.Contracts@dot.gov
For your convenience, a cover sheet for use in mailing/faxing is provided below.
NOTE: Pages 9 through 11 of this package may be filled in by the offeror OR by the owner/agency for the project. ALL remaining pages must be completed by the owner/agency AND the questionnaire must be submitted by the owner/agency of the project.
Design-Build (D-B) Solicitation
Western Federal Lands Highway Division
Attn: Contracts
Vancouver WA 98661-3801
From: (Name and Address of Firm)
(Point of Contact Name): __________________________________________________
(Facsimile/Phone Number)__________________________________________________
(E-mail Address)__________________________________________________
To (Point of Contact Name) __CONTRACTS_
Vancouver WA 98661-3801
Envelope must be marked: “DTFH70-09-R-00033. For Addressee Only”
(Facsimile Number) __(360) 619-7932___
(E-mail Address)__ WFL.Contracts@dot.gov__________
Source Selection Information See FAR 2.101 and 3.104
(Applicable when filled-in)
Design-Build (D-B) Solicitation
Project Past Performance Questionnaire
(Submitted by Owner/Agency)
Directions: To be completed by the Owner/Agency and submitted directly to:
ATTN: CONTRACTS FAX: (360) 619-7932
Federal Highway Administration 610 East Fifth Street E-MAIL: WFL.Contracts@dot.gov Vancouver, WA 98661-3801
Part A - General Information (to be completed by the contractor):
Contractor’s Name
Contractor Name:
Owner/Agency
Contact Name: Contact Number:
Project Title
Project Number
Contract Number
Project Location (Town/State/Forest…)
Description of Work provided by the Contractor:
Contract Information for project listed above (to be completed by the Owner/Agency):
Contract Award Date: Contract Start Date:
Original Completion Date: Final Completion Date:
Initial Contract Amount Final Contract Amount
Were liquidated damages assessed for late completion? __ Yes __ No
Was a contractor evaluation prepared? __ Yes __ No If yes what was the overall rating?
Design-Build (D-B) Solicitation
Project Past Performance Questionnaire (Submitted by Owner/Agency)
Evaluation Factor Rating System. Please provide ratings and comments regarding the Contractor’s performance in each area below using the following ratings:
N/A=Not Applicable U=Unsatisfactory P=Poor F=Fair G=Good E=Excellent O=Outstanding
Unsatisfactory--Response to inquiries, technical/service/administrative issues is not effective Poor--Response to inquiries, technical/service/administrative issues is marginally effective Fair--Response to inquiries, technical/service/administrative issues is somewhat effective Good--Response to inquiries, technical/service/administrative issues is usually effective Excellent--Response to inquiries, technical/service/administrative issues is effective Outstanding--The contractor has demonstrated an outstanding performance level that justifies adding a point to the score. (It is expected that this rating will be used in those rare circumstances where contractor performance clearly exceeds the performance levels described as "Excellent".)
For ratings of “Unsatisfactory” and “Poor” please provide a brief explanation in the remarks section.
Planning, Scheduling and Coordination
Developed realistic progress schedules, met established milestones, and submitted updated progress schedules as required. N/A U P F G E O
Scheduling changes were clearly communicated to the workforce, suppliers and owner agency representatives. N/A U P F G E O
How would you rate the contractors overall project management performance in the areas of Planning, Scheduling and Coordination?
N/A U P F G E O
Change Management (Collaboration with Owner)
Supporting price/cost information for modifications was accurate, complete, and reasonable. N/A U P F G E O
The contractor effectively collaborated with the owner in an equitable, businesslike and timely manner to come to satisfactory agreements.
N/A U P F G E O
How would you rate the contractor’s overall effort at collaboration with the owner agency in problem solving? N/A U P F G E O
Quality Control System Did the contractor follow their contractor quality control plan? N/A U P F G E O
Was quality control (QC) documentation timely and adequate? N/A U P F G E O
Did the contractor’s QC program effectively monitor all work including that of subcontractors? N/A U P F G E O
Source Selection Information
Design-Build (D-B) Solicitation
Did the contractor consistently take responsibility to ensure that all work met contract requirements? N/A U P F G E O
Did the contractor complete work in accordance with the specifications without owner agency presence? N/A U P F G E O
Project Superintendence and Management Personnel
Did project superintendence and management personnel foster an attitude of contract compliance? N/A U P F G E O
Did project superintendence and management personnel act promptly to resolve problems? N/A U P F G E O
Did project superintendence and management personnel have sufficient authority to make decisions or to take appropriate actions.
N/A U P F G E O
Project superintendence and management personnel were consistently present and on site when work was performed. N/A U P F G E O
Did project superintendence and management personnel deal in an ethical, collaborative and businesslike manner with owner agency representatives, workforce, subcontractors and suppliers?
N/A U P F G E O
Subcontract Management
Did the contractor take accountability for subcontractor performance? N/A U P F G E O
Did the contractor coordinate with subcontractors regarding changes to schedules or work? N/A U P F G E O
Did contractor include subcontractors in daily contractor quality control activities? N/A U P F G E O
Did contractor effectively represent subcontractors to the owner concerning changes or construction problems? N/A U P F G E O
Did contractor facilitate corrective actions to ensure subcontractor work was completed in a timely and satisfactory manner?
N/A U P F G E O
Was the Contractor committed to customer satisfaction? Yes No
Design-Build (D-B) Solicitation
Remarks: