RECOVERY - dOMINION CREEK TUNNELL AND TRESTLE REPAIR-SANDERS COUNTY LO LO NAT. FOREST, MT

Award Notice Posted

Solicitation number
AG-82B1-S-10-0297
Agency
Awarded
to Dick Anderson Construction, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG82B1C100253 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
This project is located on the Superior Ranger District, Lolo National Forest, Mineral County, Montana. To reach the Dominion Creek Tunnel and Trestle from Superior, travel west on Interstate 90 to Taft Exit. Travel south on Rainy Creek Road, Nfsr #506 to Taft Trailhead. From the trailhead, travel approximately 2 miles east to the tunnel and trestle. Fort Missoula, Montana 59807, United States

Notice details come from SAM.gov. Updated .

Notice text

RECOVERY - This project is for the construction activities for the Dominion Creek Tunnel and Trestle Repair project in accordance with contract plans and specifications. The construction activities include but are not limited to: abutment repair, removing existing ballast and ballast boxes, installing new glu-lam deck panel, installation of cable rail system, tunnel concrete repair, installation of gabion baskets, trail pothole repair, miscellaneous and ancillary structures, and traffic control. Quality control of all work is the Contractors responsibility. The Government will inspect the work periodically to ensure quality is being met.

Files

File Type Posted
A-004 - S-10-0297.pdf PDF
A-004 S-10-0297 West Abutment Drawing.tif TIF image
A-004 Amendment Attachment.docx DOCX document
A-004 S-10-0297 Abutment alterations.tif TIF image
MT20100001 heavy construction.txt TXT text file
A-003 S-10-0297.pdf PDF
Revised Sections B-M S-10-0297.doc DOC document
A002-S-10-0297.pdf PDF
Specifications S-10-0297.docx DOCX document
A001-S-10-0297.pdf PDF
S-10-0297 Questionnaire.docx DOCX document
Map and pages 3 through 6.pdf PDF
pages 7 through 11.pdf PDF
pages 12 through 16.pdf PDF
pages 33 through 36.pdf PDF
pages 27 through 32.pdf PDF
sf 1442 - s-10-0297.pdf PDF
pages 22 through 26.pdf PDF
vicinity map.pdf PDF
General Decision NumberMT 080008 MT8.doc DOC document
pages 17 through 21.pdf PDF
S-0297 dominion creek construction ifb.doc DOC document
Show all 22

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors