General Decision NumberMT 080008 MT8.doc
DOC document 31 KB Posted
- Attached to
- RECOVERY - dOMINION CREEK TUNNELL AND TRESTLE REPAIR-SANDERS COUNTY LO LO NAT. FOREST, MT
- Solicitation number
- AG-82B1-S-10-0297
About this file
Montan Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-004 S-10-0297 Abutment alterations.tif | TIF image | |
| A-004 Amendment Attachment.docx | DOCX document | |
| A-004 - S-10-0297.pdf | ||
| A-004 S-10-0297 West Abutment Drawing.tif | TIF image | |
| A-003 S-10-0297.pdf | ||
| MT20100001 heavy construction.txt | TXT text file | |
| A002-S-10-0297.pdf | ||
| Revised Sections B-M S-10-0297.doc | DOC document | |
| Specifications S-10-0297.docx | DOCX document | |
| A001-S-10-0297.pdf | ||
| S-10-0297 Questionnaire.docx | DOCX document | |
| pages 27 through 32.pdf | ||
| sf 1442 - s-10-0297.pdf | ||
| pages 22 through 26.pdf | ||
| vicinity map.pdf | ||
| pages 7 through 11.pdf | ||
| Map and pages 3 through 6.pdf | ||
| pages 12 through 16.pdf | ||
| pages 17 through 21.pdf | ||
| S-0297 dominion creek construction ifb.doc | DOC document | |
| pages 33 through 36.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MT080008 07/03/2009 MT8
Superseded General Decision Number: MT20070008
State: Montana
Construction Type: Building
Counties: Flathead, Lake, Lincoln, Mineral and Sanders
Counties in Montana.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 03/28/2008
2 04/04/2008
3 05/16/2008
4 10/03/2008
5 01/02/2009
6 05/08/2009
7 07/03/2009
ELEC0233-005 04/01/2002
Rates Fringes
Communication Technician
(Including HVAC Control
Wiring and other Low Voltage
Wiring)..........................$ 18.47 4.25%+4.82
ELEC0768-005 03/01/2008
Rates Fringes
Electricians: (Excluding HVAC
Control Wiring and other Low
Voltage Wiring)..................$ 27.10 10.71
* IRON0014-006 07/01/2009
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.34 16.58
PLUM0459-002 05/01/2009
Rates Fringes
PLUMBER/PIPEFITTER (Including
Piping for HVAC).................$ 28.26 11.15
SFMT0669-001 01/01/2009
Rates Fringes
SPRINKLER FITTER.................$ 28.55 15.30
SUMT1999-004 02/23/1999
Rates Fringes
Acoustical Ceiling Installer.....$ 10.38 .92
CARPENTER (Including Form
Work, excluding Acoustical
Ceilings, Batt/Blown
Insulation,Cabinets, Drywall, Hardwood Floors, and Overhead
Doors)...........................$ 13.97 2.16
CEMENT MASON/CONCRETE FINISHER...$ 15.05 .58
INSTALLER - OVERHEAD DOOR........$ 13.03 3.31
Insulator, Batt & Blown..........$ 9.77 .75
Laborers:
Cement Mason Tender.........$ 13.74 2.94
General.....................$ 10.17 2.58
PLUMBER/PIPEFITTER (Set HVAC unit only).......................$ 17.02 3.79
Power Equipment Operator
Backhoe.....................$ 13.00
Loader......................$ 13.80
ROOFER, Including Built Up, Composition and Single Ply
Roofs............................$ 13.21 4.35
Sheet Metal Worker (HVAC Duct
Work only).......................$ 13.90 2.00
Sheet Metal Worker (Set HVAC unit only).......................$ 17.02 3.79
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION