Recovery: designated trail system to support equestiran use, shawnee national forest
Award Notice Posted
- Solicitation number
- AG-4419-S-10-0525
- Agency
-
Operations Center East
Economic Recovery Operations, Department of Agriculture
- Awarded
- to Hammer Lgc, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-4419-C-10-0566 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Shawnee National Forest Harrisburg, Illinois 62946, United States
Notice details come from SAM.gov. Updated .
Notice text
7 versions
Update #7 · Latest ·
THIS AMENDMENT PROVIDES ATTENDEES AND NOTES FROM JUNE 15, 2010 SITE VISIT.
Update #6 ·
THIS AMENDMENT "REITERATES" THE DESIGNATED TIME & LOCATION FOR THE SITE VISIT ANNOUNCED IN MAY 6, 2010, CHANGE TO THIS AMENDMENT.
THIS AMENDMENT ALSO PROVIDES UPDATED SCHEDULE OF ITEMS AND ADDITIONAL MAPS AND DOCUMENTATION TO HELP INTERESTED PARTIES PREPARE THEIR PROPOSALS.
Update #5 ·
THIS AMENDMENT PROVIDES FURTHER CLARIFICATION OF THE SCHEDULED SITE VISIT:
TIME: 10:00 AM
LOCATION: Eddyville, IL. Eddyville is located on State Highway 145, 18 miles south of Harrisburg, IL. The forest has a warehouse located on Marla Street and we will meet there and discuss the specifications and answer questions.
A field visit is scheduled for anyone wishing to see new trail construction locations and topography of the area, to the Millstone Lake area.
THERE IS NO SF 30 FOR THIS AMENDMENT: IT IS CLARIFICATION OF AMENDMENT 01.
Update #4 ·
THIS AMENDMENT EXTENDS THE RESPONSES DUE DATE.
Update #3 ·
PROPOSALS WILL NOT BE ACCEPTED UNTIL AFTER THE SITE VISIT ON JUNE 15TH DUE TO REVISED SPECIFICATIONS & SUPPORT DOCUMENTATION BEING GENERATED.
THERE IS NO SF 30 ASSOCIATED WITH THIS AMENDMENT. AN AMENDMENT IS FORTHCOMING THAT WILL PROVIDE THE REVISED SPECIFICATIONS.
Update #2 ·
THIS AMENDMENT ONLY ADDRESSES RESPONSES DUE DATE OMITTED FROM SOLICITATION POSTING.
Update #1 ·
RECOVERY: Specified major work includes new trail construction requiring the basic clearing and grubbing, 36 finished trail tread excavation along with all necessary drainage structures, trail restoration, aggregate surfacing and base course. Trail restoration shall include, but not limited to brushing and restoring of the original trail template, 36 to 48 finished trail tread excavation with grade dips; construction drainage structures, aggregate surfacing and base course, Gallatin, Saline and Pope Counties, Harrisburg, IL.
The Government's estimate is between: $500,000 and $1,000,000
This project will be solicited "unrestricted."
Files
| File | Type | Posted |
|---|---|---|
| Prebid06152010MeetingNotes.pdf | ||
| PrebidMeetingAttendees061510.pdf | ||
| ATTACHMENT_D.docx | DOCX document | |
| Solicitation amend 02.pdf | ||
| Revised_06072010_SCHEDULE OF ITEMS.docx | DOCX document | |
| BayCreekArea_map.pdf | ||
| FT487_map.pdf | ||
| Amend 01.pdf | ||
| 1442 cont_0525.pdf | ||
| Maps.pdf | ||
| Experience_Capability Statement.doc | DOC document | |
| DBA_WD.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| SF 1442.pdf |