Prebid06152010MeetingNotes.pdf
PDF 24 KB Posted
- Solicitation number
- AG-4419-S-10-0525
About this file
Meeting Notes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PrebidMeetingAttendees061510.pdf | ||
| BayCreekArea_map.pdf | ||
| FT487_map.pdf | ||
| Solicitation amend 02.pdf | ||
| Revised_06072010_SCHEDULE OF ITEMS.docx | DOCX document | |
| ATTACHMENT_D.docx | DOCX document | |
| Amend 01.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| Experience_Capability Statement.doc | DOC document | |
| Maps.pdf | ||
| SF 1442.pdf | ||
| DBA_WD.pdf | ||
| 1442 cont_0525.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-4419-S-10-0525, Recovery, Shawnee Horse Trail Pre-bid Meeting Notes
Location: Eddyville, IL at 10:00 AM
Discussed the following items with the potential Bidders.
Note the Amendment and Solicitation, 2 copies of each need to be returned
Discussed the Revised 06/07/2010 Schedule of Items which includes Base Bid Item plus 5
Optional Bid Items
Base Item will be awarded and Optional Bid Items as funding is available
Discussed Section C
Accessibility of trails, Standard Spec book, Use of motorized equipment being <60”, Timber rattlesnake being protected, Certified in ORCA, CCR
Aug. 23 estimated start date
Discussed Special Project Specifications
Attachment B and C trail details
FAR Clauses, 52.222-6 Davis Bacon Rates, 52.228-1 Bid Guarantee is 20% of bid price, 52.228-15
Performance and Payment Bonds, 100% of contract total
Section M – Evaluation Factors for Award
Rated on Past Experience and Performance
All bidders shall submit a summary of prior trail construction experience, 4 completed projects
Project Schedule – listing of all existing contracts with percent work completed
Price and technical evaluations will be basis for award
Submit forms with company info
Discussed drawings and maps
We then traveled to the Lusk Creek Trailhead location and talked about keeping aggregate dump sites over to the sides so traffic can still use site. All dumpsites in contract are accessible by tandum dump trucks.
We then went to Bay Creek area to the beginning of FT 033A. Discussed the blue center line flagging with stations written on it. All trails center line is marked this way.