RECOVERY-Culvert Replacement - Forest Road 2160 MP 2. 4
Awarded Award Notice Posted
- Solicitation number
- AG-0489-S-09-0061
- Agency
- Operations Center Northwest Economic Recovery Operations, Department of Agriculture
- Awarded
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Olympic National Forest 1835 Blacklake Blvd SW Olympia, Washington 98512, United States
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
Added: Feb 25, 2010 1:56 pm
Please note correction to page 97 in the solicitation to FAR clause 52.228-1 Bid Guarantee.
Bid Bond is required at 20% of bid price not 100% of bid price. No other changes to this solicitation
Update #5 ·
Added: Feb 09, 2010 5:38 pm The current proposal due date is hereby extended until 11 March 2010 at 4:00pm Pacific time. New specs and designs will be posted for potential vendors to bid on within two weeks. The government reserves the right to extend the due date in the future if needed.
Update #4 ·
Added: Feb 04, 2010 6:00 pm
Modified: Feb 09, 2010 3:02 pmTrack Changes
The Government is planning on providing Amended specifications on or around Feburary 8, 2010 for this project. The Bid Due date will be extended to a future date after the amended specifications are issued.
Please check back on this site for updated specification and a revised due date.
The current proposal due date is hereby suspended until further notice.
Update #3 ·
Added: Feb 04, 2010 6:00 pm
The Government is planning on providing Amended specifications on or around Feburary 8, 2010 for this project. The Bid Due date will be extended to a future date after the amended specifications are issued.
Please check back on this site for updated specification and a revised due date.
The current proposal due date is hereby suspended until further notice.
Update #2 ·
Added: Dec 02, 2009 12:32 pm
Modified: Jan 11, 2010 12:56 pmTrack Changes
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PROCUREMENT.
The U.S. Forest Service, EROC-NW servicing Region 6 has a requirement to replace a culvert with a larger open bottom pipe arch (18 feet span, 9 feet rise, 95 feet long) in accordance with plans and specifications. Work includes traffic control, testing of soil erosion, pollution control; clearing and grubbing, removal of existing culver, excavation and haul of existing fill material; placement and compaction of structural backfill, constructing a stream simulation rock stream channel, placing riprap, placing, shaping an compacting aggregate surfacing; seeding and mulching. Work includes furnishing all materials, excavation, backfill and disposal of excess materials.
The contractor shall provide all management and project administration services, quality control, logistical support, equipment, materials and supplies required to complete the project on time and within schedule in compliance with drawings and specifications. The contractor shall also provide as necessary, flagmen and traffic controls to protect the project and public. Award will be made in sufficient time for planning and preparation to complete work by either August 3, 2010 or September 3, 2010 as directed by the Contracting Officer.
A negotiated, firm fixed price contract is comtemplated requiring a submission of both a technical and a price proposal. Award will be made to the offeror whose proposal offers the best value to the Government. The estimated construction range of magnitude for this project is between $250,000 and $500,000.
The solicitation is expected to be released on or around January 7 2010.
Bids are Due Feb 10, 2010 NLT 1600 HRS PST
This is a full and open competition
Update #1 ·
Added: Dec 02, 2009 12:32 pm
THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA) PROCUREMENT.
The U.S. Forest Service, EROC-NW servicing Region 6 has a requirement to replace a culvert with a larger open bottom pipe arch (18 feet span, 9 feet rise, 95 feet long) in accordance with plans and specifications. Work includes traffic control, testing of soil erosion, pollution control; clearing and grubbing, removal of existing culver, excavation and haul of existing fill material; placement and compaction of structural backfill, constructing a stream simulation rock stream channel, placing riprap, placing, shaping an compacting aggregate surfacing; seeding and mulching. Work includes furnishing all materials, excavation, backfill and disposal of excess materials.
The contractor shall provide all management and project administration services, quality control, logistical support, equipment, materials and supplies required to complete the project on time and within schedule in compliance with drawings and specifications. The contractor shall also provide as necessary, flagmen and traffic controls to protect the project and public. Award will be made in sufficient time for planning and preparation to complete work by either August 3, 2010 or September 3, 2010 as directed by the Contracting Officer.
A negotiated, firm fixed price contract is comtemplated requiring a submission of both a technical and a price proposal. Award will be made to the offeror whose proposal offers the best value to the Government. The estimated construction range of magnitude for this project is between $250,000 and $500,000.
The solicitation is expected to be released on or around January 7 2010.
Attachments
| File | Type | Posted |
|---|---|---|
| MOU-Jan25_signed.pdf | ||
| Amendment 2.pdf | ||
| Solicitation R3.docx | DOCX document | |
| Solicitation R2.docx | DOCX document | |
| Adjusted Schedule of Items.doc | DOC document | |
| Revised Drawings FS Rd 2160.pdf | ||
| Adjusted Work Descrip.doc | DOC document | |
| Past Perf.docx | DOCX document | |
| Sol Amend 1.pdf | ||
| Solicitation R1.doc | DOC document | |
| licitation R1.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| Rd 2160 Drawings20090813_115615.pdf | ||
| Fire Plan.doc | DOC document | |
| WA1_dvb.htm | HTM file |
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| FOR INFORMATION ONLY - AWARD NOTICE TYPO CORRECTION for Solicitation AG-0489-S-09-0061 Recovery-Olympic NF, Rd 2160 Culvert Replacement | Award Notice | |
| Recovery-Olympic NF, Aquatic Species Passage and Road Decommission - Rd 2160 Culvert Replacement | Award Notice | |
| RECOVERY-Culvert Replacement - Forest Road 2160 MP 2. 4 | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity