Adjusted Schedule of Items.doc
DOC document 134 KB Posted
- Attached to
- RECOVERY-Culvert Replacement - Forest Road 2160 MP 2. 4 Federal contract opportunity
- Solicitation number
- AG-0489-S-09-0061
About this file
Revised bid schedule for reference only
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MOU-Jan25_signed.pdf | ||
| Amendment 2.pdf | ||
| Solicitation R3.docx | DOCX document | |
| Solicitation R2.docx | DOCX document | |
| Revised Drawings FS Rd 2160.pdf | ||
| Adjusted Work Descrip.doc | DOC document | |
| Past Perf.docx | DOCX document | |
| Sol Amend 1.pdf | ||
| Solicitation R1.doc | DOC document | |
| licitation R1.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| Fire Plan.doc | DOC document | |
| WA1_dvb.htm | HTM file | |
| Rd 2160 Drawings20090813_115615.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
FOREST ROAD 2160 MP. 2.4 CULVERT REPLACEMENT
Pacific Ranger District Olympic National Forest Jefferson County
B- 1 - SCHEDULE OF ITEMS
BASE ITEM
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
| 15101 |
| Mobilization |
| Lump Sum |
| 1 |
| $ |
| $ |
| 15201 |
| Construction Survey and Staking, Method II, Tolerance B |
| Lump Sum |
| 1 |
| $ |
| $ |
| 15401 |
| Contractor Testing |
| Lump Sum |
| 1 |
| $ |
| $ |
| 15713 |
| Soil Erosion & Pollution Control |
| Lump Sum |
| 1 |
| $ |
| $ |
| 20105 |
| Clearing and Grubbing, Disposal of tops and limbs L, Logs L, Stumps L |
| Lump Sum |
| 1 |
| $ |
| $ |
| 20301 |
| Removal of Culverts |
| Each |
| 1 |
| $ |
| $ |
| 20401 |
| Roadway Excavation, Compaction Method B, Finishing Method B |
| Cubic Yard |
| 2860 |
| $ |
| $ |
| 20407 |
| Select Borrow |
| Cubic Yard |
| 100 |
| $ |
| $ |
| 20415 |
| Unsuitable Excavation |
| Lump Sum |
| 1 |
| $ |
| $ |
| 20806 |
| Structural Excavation |
| Lump Sum |
| 1 |
| $ |
| $ |
| 20808 |
| Structural Backfill |
| Cubic Yards |
| 1420 |
| $ |
| $ |
| 25101A |
| Placed Riprap, Class 5 |
| Cubic Yards |
| 50 |
| $ |
| $ |
| 25101B |
| Placed Riprap, Class 4 |
| Cubic Yards |
| 100 |
| $ |
| $ |
| 30111 |
| Aggregate Surface Course, Grading D, Compaction Method B |
| Cubic Yards |
| 130 |
| $ |
| $ |
| 60301 |
| 18’ Structural Plate Pipe, 0.188 inch (Gage Thickness) |
| Foot. |
| 95 |
| $ |
| $ |
| 62528 |
| Seeding, Fertilizing and Mulching, Dry Method |
| Lump Sum |
| 1 |
| $ |
| $ |
| 64804 |
| Placed Streambed Simulation Rock, Bed Class16, Method A. |
| Cubic Yard |
| 220 |
| $ |
| $ |
TOTAL
SUBTOTAL BID PRICE (BASE ITEM) $
PART I - SCHEDULE OF ITEMS continued
OPTIONAL ITEM A
Option
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
A
Construction Season Performance Period, Option A
Lump Sum
SUB TOTAL BID PRICE (OPTIONAL ITEM A) $ _____________
OPTIONAL ITEM B
Option
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
B
Construction Season Performance Period, Option B
Lump Sum
SUB TOTAL BID PRICE (OPTIONAL ITEM B) $ _____________
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
* Items shown with this symbol are designated as Contract Quantities.
TOTAL BID PRICE (BASE + OPTION A) $ _____________
TOTAL BID PRICE (BASE + OPTION B) $ _____________
Be sure to enter TOTAL BID PRICE IN Item 17 on back of Standard Form 1442.
BASIS OF AWARD: One contract will be awarded to the responsive bidder offering the lowest total acceptable bid.
File details come from the government source that posted it. Updated .