Rabun Beach Bath House Loop 2

Award Notice Posted

Solicitation number
AG-435H-S-09-0009
Agency
Awarded
to Higgins Construction Company
Set-aside
No set-aside

Opportunity facts

Contract number
AG-435H-C-09-0033 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Chattooga River Ranger District 9975 Hwy. 441 S. Lakemont, Georgia 30552, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Contract Award

Update #2 ·

The date for receipt of proposals is extended to July 16, 2009 at 4:30pm.



PROJECT DESCRIPTION: The contractor shall provide all labor, equipment, tools and materials required to construct a new Rabun Beach Bath House, Loop 2, and demolish two other bathhouses. Construction consists of a new 853 SF concrete masonry unit, 6-unit with separate handicap accessible toilet, standing seam metal roof, new septic drain field, and approximately 100 feet of access road with handicap access parking.



Contract time is 120 calendar days.



PROJECT LOCATION: Chattahoochee-Oconee National Forests, Chattooga River Ranger District, Lake Rabun Road, Rabun County 218, Georgia. To reach the project, go north on US 441 from Tallulah Falls for approximately 1.1 miles, cross a bridge, then turn left (west) onto Old Hwy. 441. Continue on Old Hwy. 441 to the intersection with Lake Rabun Road. Take Lake Rabun Road west for about 3 miles to the campground on the left.



ESTIMATE COST RANGE: between $250,000 and $500,000.



SOLICITATION DOCUMENTS, SPECIFICATIONS, AND DRAWINGS: The solicitation, AG-435H-S-09-0009 will be issued via FedBizOpps, as a Request for Proposal and will be available for downloading on or about June 5, 2009 at the website address: http://www.fedbizopps.gov/



All vendors are required to be registered in Central Contractor Registration (CCR) prior to award of a contract, http://www.ccr.gov/







Update #1 ·

PROJECT DESCRIPTION: The contractor shall provide all labor, equipment, tools and materials required to construct a new Rabun Beach Bath House, Loop 2, and demolish two other bathhouses. Construction consists of a new 853 SF concrete masonry unit, 6-unit with separate handicap accessible toilet, standing seam metal roof, new septic drain field, and approximately 100 feet of access road with handicap access parking.



Contract time is 120 calendar days.



PROJECT LOCATION: Chattahoochee-Oconee National Forests, Chattooga River Ranger District, Lake Rabun Road, Rabun County 218, Georgia. To reach the project, go north on US 441 from Tallulah Falls for approximately 1.1 miles, cross a bridge, then turn left (west) onto Old Hwy. 441. Continue on Old Hwy. 441 to the intersection with Lake Rabun Road. Take Lake Rabun Road west for about 3 miles to the campground on the left.



ESTIMATE COST RANGE: between $250,000 and $500,000.



SOLICITATION DOCUMENTS, SPECIFICATIONS, AND DRAWINGS: The solicitation, AG-435H-S-09-0009 will be issued via FedBizOpps, as a Request for Proposal and will be available for downloading on or about June 5, 2009 at the website address: http://www.fedbizopps.gov/



All vendors are required to be registered in Central Contractor Registration (CCR) prior to award of a contract, http://www.ccr.gov/







Files

File Type Posted
information to offerors.doc DOC document
LWS_G-102_Revision.pdf PDF
bid amdt 1.pdf PDF
amdt_2.pdf PDF
Pre-Bid Meeting Attendees_Bath House.pdf PDF
amdt_1.doc DOC document
RFP_Rabun Beach Bath House Loop 2.doc DOC document
Vicinity and Site Map_Rabun Beach Bath House Loop 2.pdf PDF
Specifications_Rabun Beach Bath House Loop 2.pdf PDF
Standard Form 24_Bid Bond.pdf PDF
Drawings_Rabun Beach Bath House Loop 2.pdf PDF
Technical Proposal Format_Rabun Beach Bath House Loop 2.doc DOC document
Show all 12

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors