1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

2 7/7/2009

6. ISSUED BY:

USDA Forest Service Chattahoochee-Oconee National Forests 1755 Cleveland Highway Gainesville, GA 30501

7. ADMINISTERED BY (If other than 6.):

9A. AMENDMENT OF SOLICITATION NUMBER

AG-435H-C-09-0009

Rabun Beach Bath House, Loop 2 [ x ]

9B. DATED (see item 11)

6/5/2009

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

8. NAME AND ADDRESS OF CONTRACTOR

CODE FACILITY

10B. DATED (see item 13)

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X ] is extended, [ ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

A. THIS CHANGE IS ISSUED PURSUANT TO:

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (specify type of modification and authority )

E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION

See the following page for changes and clarifications.

The date for receipt of proposals is extended to July 16, 2009 ( same time of 4:30pm)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

MARCIA O’CONNOR

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY: /s/ Marcia O’Connor 7/7/09

(signature of authorized person) (signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

Solicitation AG-435H-S-09-0009

Rabun Beach Bathhouse, Loop 2

Amendment No. 1

Make the following changes:

Specification 06 10 00, Section 2.02 Dimension Lumber

Paragraph F. The GNI product is no longer available. An acceptable alternative is Lousiana

Pacific LPI 1-3/4” x 11-7/8” I-Joist.

Drawing sheet A-3. Change roofing felt to 30#. (Same as in Specification 03 10 00, 2.05C)

Drawing sheet C-101. Clarify the retaining wall note to read: Retaining wall is to be designed and provided by the contractor. Wall is to be constructed of broken face concrete block typical of a Keystone style face block. Contractor shall submit the wall design and specification to the COR for review and acceptance before commencing work on the retaining wall.