R3 Early Warning System Repair and Installation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
127EAV25Q0055
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
517810 All Other Telecommunications
PSC
7G22 It And Telecom - Network: Satellite And Rf Communications Products (Hw, Perpetual License Software)
Place of performance
Springerville, Arizona, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service Southwest Region is procuring repair and installation services for Early Warning Systems at two high-hazard dams: Hulsey Lake Dam in Apache-Sitgreaves National Forest, Arizona, and McClellan Dam in Cibola National Forest, Texas. The contract requires repairing existing EWS units and installing one unit at each dam location, including replacement of necessary components with proprietary AMCI Wireless components, verification of performance, and ensuring reliable data transmission through cellular or satellite routes. The procurement also includes two submersible pressure transmitters with specific technical requirements (freeze-proof, 0-15 psig pressure range, 4-20mA output, 3-year warranty) and 100 feet of additional sensor cable. The Forest Service will evaluate proposals using Lowest Price Technically Acceptable criteria, with technical and past performance factors weighted more heavily than price. Pre-award questions are due by September 3, 2025, and quotes must be submitted by 5:00 PM Pacific Daylight Time on September 12, 2025.

This opportunity is designated as a 100% small business set-aside under NAICS code 517810 (All Other Telecommunications). No current contractors or incumbents are identified in the solicitation documents. While the total contract value is not disclosed, the procurement involves work at two distinct dam locations requiring specialized telecommunications equipment and installation services. The contract includes a 90-day completion timeline from award, with work to be performed during normal business hours. Performance will take place primarily in Springerville, Arizona, though the contract encompasses dam sites in both Arizona and Texas, requiring contractors to account for various environmental conditions at both locations.

Notice text

To repair existing Early Warning System units for Hulsey Lake Dam and McClellan Dam in Region 3, including replacement of necessary components and verification of performance.

Questions are due No Later Than (NLT) 03 September 2025

Please read through the solicitation and follow the instructions in  FAR 52.212-1 when submitting your quotes. 

Quotes are due NLT 5:00PM PD on 12 September 2025.

Attachments

Files attached to this notice, newest first
File Type Posted
A6 RFQ 127EAV25Q0055.pdf PDF
A6 WD 2015-5477 AZ.pdf PDF
A6 WD 2015-5269 TX.pdf PDF
A6 SOI 127EAV25Q0055.xlsx XLSX spreadsheet

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
R3 Early Warning System Repair and Installation Award Award Notice
R3 Early Warning System Repair and Installation This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity