R-11 Parking Construction
Closed Solicitation Posted
- Solicitation number
- W50S6X-21-B-0001
- Agency
- Delaware National Guard Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236 Construction of Buildings
- PSC
- Y1LZ Construction Of Parking Facilities
- Place of performance
- New Castle, Delaware 19720, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for the construction of a new canopy and parking area for refueling trucks at a military facility in New Castle, Delaware. The Department of the Army Delaware Army National Guard will remove existing pavements and turf grass to construct a pre-engineered metal building canopy with spread footings and column piers, along with stormwater piping and electrical work. Proposals are due by specified dates in amendments, with a bid bond and payment and performance bonds required. Evaluation will consider price, technical approach, and experience with similar military construction projects.
This opportunity is set aside for small businesses and has an estimated value between $1-5 million. The NAICS code is 237990 and PSC code is S206. The work will be performed at the New Castle, Delaware facility and include parking spaces for five refueling trucks under the new canopy. Two contractors submitted bids ranging from $237,301 to $300,900 in response to the solicitation. The government estimate was $185,750.
Notice text
8 versions
Update #8 · Latest ·
***9/7/202*** THIS UPDATE IS TO BREAK OUT THE GOVERNMENT'S BID INSTEAD OF SHOWING IT AS A LUMP SUM.
***THIS UPDATE IS TO INCLUDE THE BID OPENING RESULTS***
***THIS IS TO RESPOND TO QUESTION 8 THAT WAS SUBMITTED DURING THE QUESTION AND ANSWER PERIOD. SINCE THE ANSWER TO THIS QUESTION DOES NOT CHANGE THE SPECIFICATIONS, NO AMENDMENT WILL BE ISSUED. LAST AMENDMENT ISSUED IS AMENDMENT 04. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
8. QUESTION: can you provide the name of the company that the Pre-engineered Metal Canopy specifications are based upon?
ANSWER: There is no preferred or basis of design manufacturer other than the performance requirements as shown as acceptable in the drawings and specifications. The drawing and specification performance requirements are intended to be descriptive enough to allow for an open bidding environment with multiple PEMB designers / suppliers, while maintaining project quality.***
***Amendment 04*** THE PURPOSE OF THIS AMENDMENT IS TO SUPPLY THE ANSWERS TO THE QUESTIONS THAT OFEERORS PRESENTED. THIS AMENDMENT WILL ALSO INCLUDE PICTURES OF THE CANOPY FOOTINGS, THE SOIL REPORT, THE CIVIL DEMOLITION PLAN, AND THE FINAL GEOTECHNICAL REPORT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 03*** EXTENDED BID OPENING DATE FROM 26 MAY 2021 TO 16 JUNE 2021. ANSWERS TO SUBMITTED QUESTIONS WILL BE POSTED AS SOON AS RECEIVED. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 02*** UPDATED WAGE DETERMINATION DE20210008 DATED 14 MAY 2021. ADD SITE VISIT MINUTES AND SITE VISIT SIGN IN ROSTER. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 01*** REMOVE ATTACHMENT 2- NEW CASTLE DRAWINGS AND CHANGE IT TO RESERVED. THIS DRAWING WAS A DUPLICATE OF ATTACHMENT 3. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Update #7 ·
***THIS UPDATE IS TO INCLUDE THE BID OPENING RESULTS***
***THIS IS TO RESPOND TO QUESTION 8 THAT WAS SUBMITTED DURING THE QUESTION AND ANSWER PERIOD. SINCE THE ANSWER TO THIS QUESTION DOES NOT CHANGE THE SPECIFICATIONS, NO AMENDMENT WILL BE ISSUED. LAST AMENDMENT ISSUED IS AMENDMENT 04. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
8. QUESTION: can you provide the name of the company that the Pre-engineered Metal Canopy specifications are based upon?
ANSWER: There is no preferred or basis of design manufacturer other than the performance requirements as shown as acceptable in the drawings and specifications. The drawing and specification performance requirements are intended to be descriptive enough to allow for an open bidding environment with multiple PEMB designers / suppliers, while maintaining project quality.***
***Amendment 04*** THE PURPOSE OF THIS AMENDMENT IS TO SUPPLY THE ANSWERS TO THE QUESTIONS THAT OFEERORS PRESENTED. THIS AMENDMENT WILL ALSO INCLUDE PICTURES OF THE CANOPY FOOTINGS, THE SOIL REPORT, THE CIVIL DEMOLITION PLAN, AND THE FINAL GEOTECHNICAL REPORT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 03*** EXTENDED BID OPENING DATE FROM 26 MAY 2021 TO 16 JUNE 2021. ANSWERS TO SUBMITTED QUESTIONS WILL BE POSTED AS SOON AS RECEIVED. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 02*** UPDATED WAGE DETERMINATION DE20210008 DATED 14 MAY 2021. ADD SITE VISIT MINUTES AND SITE VISIT SIGN IN ROSTER. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 01*** REMOVE ATTACHMENT 2- NEW CASTLE DRAWINGS AND CHANGE IT TO RESERVED. THIS DRAWING WAS A DUPLICATE OF ATTACHMENT 3. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Update #6 ·
***THIS IS TO RESPOND TO QUESTION 8 THAT WAS SUBMITTED DURING THE QUESTION AND ANSWER PERIOD. SINCE THE ANSWER TO THIS QUESTION DOES NOT CHANGE THE SPECIFICATIONS, NO AMENDMENT WILL BE ISSUED. LAST AMENDMENT ISSUED IS AMENDMENT 04. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
8. QUESTION: can you provide the name of the company that the Pre-engineered Metal Canopy specifications are based upon?
ANSWER: There is no preferred or basis of design manufacturer other than the performance requirements as shown as acceptable in the drawings and specifications. The drawing and specification performance requirements are intended to be descriptive enough to allow for an open bidding environment with multiple PEMB designers / suppliers, while maintaining project quality.***
***Amendment 04*** THE PURPOSE OF THIS AMENDMENT IS TO SUPPLY THE ANSWERS TO THE QUESTIONS THAT OFEERORS PRESENTED. THIS AMENDMENT WILL ALSO INCLUDE PICTURES OF THE CANOPY FOOTINGS, THE SOIL REPORT, THE CIVIL DEMOLITION PLAN, AND THE FINAL GEOTECHNICAL REPORT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 03*** EXTENDED BID OPENING DATE FROM 26 MAY 2021 TO 16 JUNE 2021. ANSWERS TO SUBMITTED QUESTIONS WILL BE POSTED AS SOON AS RECEIVED. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 02*** UPDATED WAGE DETERMINATION DE20210008 DATED 14 MAY 2021. ADD SITE VISIT MINUTES AND SITE VISIT SIGN IN ROSTER. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 01*** REMOVE ATTACHMENT 2- NEW CASTLE DRAWINGS AND CHANGE IT TO RESERVED. THIS DRAWING WAS A DUPLICATE OF ATTACHMENT 3. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Update #5 ·
***Amendment 04*** THE PURPOSE OF THIS AMENDMENT IS TO SUPPLY THE ANSWERS TO THE QUESTIONS THAT OFEERORS PRESENTED. THIS AMENDMENT WILL ALSO INCLUDE PICTURES OF THE CANOPY FOOTINGS, THE SOIL REPORT, THE CIVIL DEMOLITION PLAN, AND THE FINAL GEOTECHNICAL REPORT. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 03*** EXTENDED BID OPENING DATE FROM 26 MAY 2021 TO 16 JUNE 2021. ANSWERS TO SUBMITTED QUESTIONS WILL BE POSTED AS SOON AS RECEIVED. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 02*** UPDATED WAGE DETERMINATION DE20210008 DATED 14 MAY 2021. ADD SITE VISIT MINUTES AND SITE VISIT SIGN IN ROSTER. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 01*** REMOVE ATTACHMENT 2- NEW CASTLE DRAWINGS AND CHANGE IT TO RESERVED. THIS DRAWING WAS A DUPLICATE OF ATTACHMENT 3. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Update #4 ·
***AMENDMENT 03*** EXTENDED BID OPENING DATE FROM 26 MAY 2021 TO 16 JUNE 2021. ANSWERS TO SUBMITTED QUESTIONS WILL BE POSTED AS SOON AS RECEIVED. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 02*** UPDATED WAGE DETERMINATION DE20210008 DATED 14 MAY 2021. ADD SITE VISIT MINUTES AND SITE VISIT SIGN IN ROSTER. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 01*** REMOVE ATTACHMENT 2- NEW CASTLE DRAWINGS AND CHANGE IT TO RESERVED. THIS DRAWING WAS A DUPLICATE OF ATTACHMENT 3. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Update #3 ·
***AMENDMENT 02*** UPDATED WAGE DETERMINATION DE20210008 DATED 14 MAY 2021. ADD SITE VISIT MINUTES AND SITE VISIT SIGN IN ROSTER. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
***AMENDMENT 01*** REMOVE ATTACHMENT 2- NEW CASTLE DRAWINGS AND CHANGE IT TO RESERVED. THIS DRAWING WAS A DUPLICATE OF ATTACHMENT 3. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Update #2 ·
***AMENDMENT 01*** REMOVE ATTACHMENT 2- NEW CASTLE DRAWINGS AND CHANGE IT TO RESERVED. THIS DRAWING WAS A DUPLICATE OF ATTACHMENT 3. PLEASE SIGN AND RETURN THE ORIGINAL SOLICITATION ALONG WITH ALL AMENDMENTS. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Update #1 ·
- The project involves the following: Removal of existing pavements and turf grass area for construction of new canopy and R-11 refueler parking. Parking is provided for five (5) trucks. Provide storm water drain piping and electrical for canopy lighting, power reels, gates, controls and receptacles. Entire area is fenced. Canopy is Pre-Engineered Metal Building with spread footing and column pier design; and incidental related work.
- Funds are not presently available for this contract. Currently, the Government anticipates funds will become available prior to but no later than the bid opening. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
- This project is on a secure military facility.
- All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113.
- The Government reserves the right to limit access to the facility based on adverse results to the background investigation.
- All personnel accessing the military facility consent to search of their persons and property.
- Magnitude of Construction: FAR 36.20(c) - Between $1,000,000 and $5,000,000
- Bid Bond: Bid Bond is required. ref: FAR 52.228-1
- Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award
- Vendors MUST be registered in SAM at time of proposal. ref: 52.204-7(b)(1)
- The Site Visit will be conducted in person on a specific date that can be found in SECTION 00100 and FAR Clause 52.236-27
Attachments
Show all 26
Notice history
| Notice | Type | Posted |
|---|---|---|
| R-11 Parking Construction | Solicitation | |
| R-11 Parking Construction | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity