Quonset Point Fuels Storage Complex Replacement Construction at the Rhode Island Air National Guard Station in North Kingstown, Rhode Island
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912WJ20R0011
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- North Kingstown RI 02852 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This notice provides advance information for the construction of a new Fuels Storage Complex Replacement at the Quonset Point Rhode Island Air National Guard Station in North Kingstown, Rhode Island. The U.S. Army Corps of Engineers Engineering District New England will issue a solicitation to replace the truck offload and fillstand positions, pumping and filtration equipment, and construct a new 600 GPM pumphouse and control room to upgrade the existing refueler parking area. The solicitation will utilize best value tradeoff procedures and have an estimated value between $5,000,000 to $10,000,000.
The procurement is designated as a total small business set-aside with a NAICS code of 236220 for construction of buildings. Interested parties must register on SAM.gov to access the solicitation when issued on or around July 2020. Questions may be directed to the Contract Specialist Elizabeth Glasgow by email.
Notice text
PRE-SOLICITATION NOTICE for the Quonset Point Fuels Storage Complex Replacement Construction at the Rhode Island Air National Guard Station in North Kingstown, Rhode Island.
The New England District, U.S. Army Corps of Engineers (District) will be issuing a solicitation for the construction of the Fuels Storage Complex Replacement at the Quonset Point Rhode Island Air National Guard Station in North Kingstown, Rhode Island.
The work required shall consist of the following:
- Replace the truck offload and fillstand positions and associated pumping / filtration equipment in compliance with UFC 3-460-01 Design: Petroleum Fuel Facilities and the DoD Type III Hydrant System Standards, as applicable
- Construction of a new 600 gallon per minute (GPM) capacity pumphouse with control room, offload skids, fuel pumps, filter / separator vessels, truck fillstand equipment, associated valves, piping and electrical equipment
- Upgrades to the existing refueler parking area
- Existing storage tanks will be reused with the new system
- Construction will be phased to allow the existing system to operate until most of the new system is completed
The NAICS code for the work described herein is 236220. The estimated magnitude of the work is expected to be between $5,000,000 and $10,000,000. This requirement will be solicited as a small business set-aside procurement using the Best Value Tradeoff acquisition procedures.
This is not an invitation for bids at this time. The solicitation requirements and contract documents, to include instructions for submission and the response date, will be available on or about July 2020 and will be available for downloading by accessing the SAM.beta.Gov website (https://beta.sam.gov/). In order to view this solicitation, prospective bidders are required to self-register their firm with SAM.beta.Gov (go to https://beta.sam.gov/ and register under Vendor/Citizen). Amendments, if any, to the solicitation will be made available at https://beta.sam.gov/. Telephonic, mailed or fax requests will not be accepted. Registrants are responsible for the accuracy of the information on the SAM.beta.Gov Registration List. All responsible sources may submit a bid which shall be considered by the District. Additional questions may be emailed to the Contract Specialist, Elizabeth Glasgow, at Elizabeth.K.Glasgow@usace.army.mil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Quonset Point Fuels Storage Complex Replacement Construction at the Rhode Island Air National Guard Station in North Kingstown, Rhode Island | Award Notice | |
| Quonset Point Fuels Storage Complex Replacement Construction at the Rhode Island Air National Guard Station in North Kingstown, Rhode Island | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island. | ENDIST New England | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity