Purchase and delivery of storage container to USVI St. Thomas FEMA Bunker - Amendment 1 Q&A and Extension

Closed Solicitation Posted

Solicitation number
70FBR225Q00000071
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
St Thomas Virgin Islands, U.S. 00802, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Federal Emergency Management Agency (FEMA) Preparedness Section is procuring a 40-foot storage container along with comprehensive transportation, installation, and modification services to support facility downsizing efforts in the US Virgin Islands. The procurement encompasses purchasing a new container, managing complete door-to-door logistics from mainland vendor to St. Thomas including ocean freight and customs clearance, and providing crane services for final placement at the FEMA Bunker Complex. Additional requirements include insulating the container interior to at least R-4 value and installing a solar-powered ventilation system, with the container to be anchored on an existing concrete foundation slab. The contract will be awarded on a best value basis considering technical specifications (particularly transport logistics), past performance from similar contracts within the last three years, and price reasonableness through comparative analysis. Questions were due September 3rd at 5 PM EST, with proposal submissions due September 8, 2025.

This solicitation is designated as a total small business set-aside under NAICS code 332439 (Other Metal Container Manufacturing) with a size standard of 600 employees. The contract includes three distinct line items: container purchase, comprehensive shipping and freight services, and labor/materials for insulation and ventilation system installation. Performance must be completed within 120 days, with container acquisition required within 90 days and final installation subject to FEMA inspection before the performance period concludes. The work will be performed at the FEMA St. Thomas Bunker Site located at 35 Mosquito Point-Grambokola Hill Drive, Charlotte Amalie West, St. Thomas, USVI, with the container positioned at specific GPS coordinates (18.327140, -64.963416) next to an existing 20-foot white container. This procurement supports FEMA Region 2's closure of three warehouses by December 2025, requiring secure storage for residual equipment.

Notice text

2 versions

Update #2 · Latest ·

Purchase, transportation, unloading, and placement with crane service of container needed to support storage of residual warehouse equipment.

Please see Statement of Work for full details.

Please submit all inquiries via email. 

Q&A:

Q: Can we insulate the container at our shop and ship it insulated or will the insulated need to be done on site?

A: Either 

Q: Should the container have one door or two doors?

A: Should be a typical container with 2 doors.

Q:Should it be the standard 8-foot height, or a 9-foot high cube?

A: Eight feet is fine.

Q: Does FEMA require the container to be ISO-certified (CSC plated), and must it be U.S.-manufactured, or are foreign-manufactured containers acceptable under Trade Agreements if they meet all specifications?

A: FAR Clause 52.225-1 Buy American-Supplies applies to this solicitation 

Q: Could FEMA confirm that the delivery address is the FEMA Office Bunker, 35 Mosquito Point, Charlotte Amalie West, St. Thomas, USVI 00802, and clarify the exact placement point within the site?

A: FEMA St. Thomas Bunker Site, 35 Mosquito Point-Grambokola Hill Drive, Charlotte Amalie West, St. Thomas, USVI 00802.   Should be placed on existing foundation slab next to the white 20-foot container (exact coordinates are: 18.327140, -64.963416).  Can be anchored to the existing concrete slab.

Q: Can FEMA provide pictures or diagrams of the site, including where the container will be placed and the approximate crane distance from the bunker?

A: Pictures have been attached to this solicitation

Q: For insulation, is there a preferred R-value or thickness FEMA expects?

A: Insulation should be AT LEAST R-4.

Q: For the solar-powered ventilation system, is a specific brand/model required, or will any system that meets airflow requirements be acceptable?

A: No.  

Q: What anchoring method is preferred at the site (e.g., concrete footings, hurricane tie-downs)? Will FEMA provide site condition information, or should the contractor assess onsite?

A: The container will be placed on an existing concrete foundation slab.  The container should be anchored directly to the slab.  Hurricane tie-downs are acceptable. FEMA will provide information to the vendor of the site and/or the vendor can physically inspect the site.

Q: Will FEMA require an in-person final inspection, or will a remote inspection (video/PowerPoint) be acceptable?

A: Both.  FEMA representatives have to escort the vendor onto the Bunker site.  However, the PM will need to at least see video confirmation of the installation.

Q: Can the vendor choose the most cost-effective mainland port of departure, or is a specific port required?

A: It is up to the vendor to figure out their Quality Control Plan 

Q: Regarding duties and tariffs, are there any exemptions/clearances in place, or should contractors budget for full costs?

A: It is the vendor’s responsibility to manage all customs and territorial requirements.  If it benefits the project, vendor can announce this container is for FEMA.

Q: For local road/oversize permits in St. Thomas, does FEMA already hold these, or must the contractor obtain them?

A: FEMA has no permits.  The container is not oversized.  Vendor to arrange all necessary actions to get the container from port to the Bunker.

Q: Will FEMA provide a cleared laydown area at Mosquito Point, or is site prep (grading/clearing) part of the contractor’s scope?

A: There may be some minimal vegetation clearing at the edge of the foundation otherwise the site is clear and ready for placement of the container.

Q: Must the Project Manager be based on-island, or can they operate remotely with local subcontractor support?

A: The PM will be remote.

Q: The period of performance is 120 days. Does FEMA expect completion sooner, or is the full timeline acceptable to allow for shipping and installation?

A: 120 days is the maximum, FEMA expects completion sooner

Q: For past performance evaluation, will FEMA accept subcontractor past performance if identified in the proposal?

A: Yes.

Update #1 ·

Purchase, transportation, unloading, and placement with crane service of container needed to support storage of residual warehouse equipment.

Please see Statement of Work for full details.

QUESTIONS DUE: September 3rd 5pm EST

Please submit all inquiries via email. 

Files

File Type Posted
Cont Pic 2.pdf PDF
Cont Pic 1.pdf PDF
Technical Evaluation Factors Storage Containers.docx DOCX document
1.1.4 Container SOW.docx DOCX document
2.2.1 Sol_70FBR225Q00000071.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Disaster Overseas Transportation Support (DOTS) - AS/GU/CNMI Pago Pago American Samoa, United States · NAICS 48311 Federal Emergency Management Agency No set-aside
Request for Information (RFI) - Disposal and Destruction of Expired Commodities District of Columbia 20472, United States · NAICS 562211 Federal Emergency Management Agency No set-aside
RFI - FEMA - Supply Chain Management System (SCMS) Washington, District of Columbia 20024, United States · NAICS 518210 Federal Emergency Management Agency No set-aside