About this opportunity

The United States Army Corps of Engineers Mobile District is seeking a prime contractor to provide comprehensive power generation services at Soto Cano Air Base in Honduras. The solicitation requires the selected vendor to furnish, install, and operate utility-grade electric power generation modules capable of supplying the entire base's peak demand of 6,500 kilo-volt-amperes (kVA) at 0.8 power factor. The contract will be structured as a Firm Fixed Price (FFP) arrangement with one base year and four one-year option periods, totaling five years of service. Offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) to download and respond to the solicitation, with proposals due by April 2, 2025. The government will evaluate technical proposals, past performance documentation, and compliance with specific submission requirements, including a 60-page technical approach with detailed formatting guidelines.

The procurement is unrestricted and open to businesses under NAICS Code 221112 with up to 950 employees. The contract scope extends beyond power generation to include operating and maintaining an existing 2-megawatt photovoltaic farm, managing fuel systems, and maintaining electrical distribution infrastructure both inside and outside the switchyard. The government anticipates awarding the contract by May 31, 2025, with requirements that new generators be on-site by June 1, 2026, and operational by June 24, 2026. The place of performance is exclusively in Honduras, specifically at Soto Cano Air Base. While no specific incumbent is mentioned, the contract involves taking over existing power generation and distribution systems, suggesting potential continuity of services from a previous contractor.

Notice text

11 versions

Update #11 · Latest ·

Please see Amend 0009. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #10 ·

Amend 0008 is to update provisions and clauses in accordance with recently issued Executive Orders only. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #9 ·

Please see Amend 0007. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #8 ·

Amend 0006 extends the proposal due date. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #7 ·

Amend 0005 extends the proposal due date. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #6 ·

Amend 0004 extends the proposal due date. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #5 ·

Please see Amend 0003. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #4 ·

Amendment 1000 is to post the Pre-proposal Conference Attendance Sheet only. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #3 ·

Please see Amend 0002. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #2 ·

This amendment is to update the contact information for the preproposals site visit POC to to Mr. Cesar Sabillon at +504 2234-4636 ext. 6845079 or (251) 694-3734 and extend the registration time until 10:00 a.m. Central Standard Time on 2 December 2024 The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Update #1 ·

The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, one base year and four (4) one year option periods. The work consists of supplying and supporting all generator set activities for prime power operations in support of ASA Soto Cano, Honduras. Power generation and distribution activities are defined as preparation, transport, installation, preventive maintenance, scheduled maintenance, emergency maintenance, service, maintenance of associated fuel systems, oil water separator and all distribution system maintenance including the underground and overhead systems within the switchyard. In addition, the Contractor shall be responsible for the Operations and Maintenance of all installed primary distribution from the high side of the transformers, all switchyard primary, pole top switches, primary metering units including Voltage transformers (VT) and Current Transformers (CT), primary metal-clad switchgear assembly, and the overhead primary ahead of the four reclosers, including the reclosers themselves and all their associated parts, located outside of the switchyard fence. The work also consists of the operation, monitoring, and maintenance of an existing government owned 2-megawatt (MW) photovoltaic (PV) farm. The PV farm operates in parallel with the generators as a fuel saving/peak shaving measure. This procurement is unrestricted. The NAICS Code applicable to this requirement is 221112, the size standard for which is a concern, including its affiliates, who number of employees does not exceed 950.The solicitation will only be issued as a direct download at the following website: https://piee.eb.mil. All offerors must be registered in the Procurement Integrated Enterprise Environment (PIEE) before they will be allowed to download solicitation information. The solicitation will not be provided in a printed paper format; however, the Government reserves the right to revert to paper medium when it is determined to be in the Government?s best interest. Therefore, it is the responsibility of the offeror to check the website for solicitation posting and any changes to this solicitation. Those registering are responsible for the accuracy of the information provided.

Files

Notice history

Notice Type Posted
Provide Prime Power, Soto Cano Air Base (AB), Honduras Award Award Notice
This notice Latest solicitation Solicitation
Provide Prime Power, Soto Cano Air Base (AB), Honduras Pre-Solicitation
Provide Prime Power, Soto Cano Air Base (AB), Honduras Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors