About this opportunity

The Naval Facilities Engineering Systems Command (NAVFAC) Northwest is seeking public feedback on the potential use of a Project Labor Agreement (PLA) for a construction project at Naval Base Kitsap in Bremerton, Washington. The project, designated P859, involves upgrading electrical systems for the CVN 78 aircraft carrier, including demolition and construction of a new substation, electrical and civil/structural work, site preparation, and other infrastructure improvements. The total estimated cost of the project is between $100-250 million, with a period of performance of approximately 2,000 calendar days. NAVFAC is soliciting responses to a questionnaire from the public, including government entities, unions, contractors, and small businesses, to gather information on specialized construction, labor availability, interest in participation, and potential impacts of a PLA requirement. Responses to the questionnaire are due by November 8, 2024 and should be submitted via email.

This is not a solicitation and there is no set-aside designation. The government does not intend to award a contract based on this market survey or pay for the requested information. The NAICS code for this project is 237130 - Power and Communication Line and Related Structures Construction, and the PSC is Y1NZ - Construction Of Other Utilities. The government has not provided any information about potential incumbents or current contractors.

Notice text

This is a request for information/market survey.  This is not a request for proposal, request for quote, or an invitation for bid.  There will be no solicitation, specification, or drawings available at this time.

Description: Naval Facilities Engineering Systems Command (NAVFAC), Northwest is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project.  The construction project is for Building and/or Heavy (non-building/residential) requirements in support of P859 CVN 78 Aircraft Carrier Electrical Upgrades, Naval Base Kitsap (NBK) Bremerton, Puget Sound Naval Shipyard (PSNS), located in the State of Washington. The designated Defense Priorities and Allocation System (DPAS) priority rating for this project is DX-C2.

Construction may include, but is not limited to: demolition of an existing substation and the construction of a new substation at a different locations; construction of a new substation building made of concrete and steel that houses indoor switchgear, battery banks, an office, restroom facilities, fire protection, and HVAC; electrical, civil, and structural work required to upgrade power connections to accommodate simultaneous mooring;  Antiterrorism (AT) features; pile wall reinforcement and transformer fire separation wall; foundations made of concrete for exterior electrical equipment and secondary containment systems, such as transformers, circuit breakers, and disconnect switches; electrical duct banks made of concrete-encased polyvinyl chloride (PVC) conduits that connect the new substation to the existing kilovolt (kV) transmission line and the shipyard distribution system; site preparation including site clearing, excavation and grading, and removal and disposal of hazardous material and contaminated soil; pavement resurfacing and site improvements; electrical utilities; mechanical utilities including storm water, sanitary sewer, water distribution and compressed air distribution to supply the substation buildings.  Project will be design-bid-build (DBB).  NAICS Code: 237130.  In accordance with DFARS 236.204, the magnitude of construction is anticipated to be between $100,000,000 and $250,000,000.  General period of performance is anticipated to be approximately 2,000 calendar days.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f).  Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction projects with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects.  When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire. 

This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list.   This survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government.  The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information.  The Government will not provide a debriefing on the results of this survey.  All information will be held in a confidential manner and will only be used for the purposes intended.

Submission Instructions: Responses shall be submitted on the attached questionnaire via email to sylva.kabuanseya.civ@us.navy.mil and emily.m.slate.civ@us.navy.mil no later than 2:00 p.m. PST, 8 November 2024. Please title the subject line of your e-mail as “(Insert Company Name) – P859 PLA RFI Questionnaire – N4425525R1500”. Emails can be no larger than 5 MB in size. If more than 5 megabytes are needed, more than one email may be sent.

Files

File Type Posted
P859_PLA RFI and Questionnaire.docx DOCX document

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
PLA RFI for Repair of Waterfront Utility Services Transmitted via a Utilidor Tunnel at NSB Kings Bay, GA Kings Bay, Georgia, United States · NAICS 237110 Naval Facilities Engineering Command No set-aside
Unaccompanied Personnel Housing Restoration at NSB Kings Bay, GA Kings Bay, Georgia, United States · NAICS 236220 Naval Facilities Engineering Command No set-aside
N4008527R0039 Design-Bid-Build (DBB) P-200, Aircraft Maintenance Hangar, Marine Corps Air Station (MCAS) Cherry Point, North Carolina Cherry Point, North Carolina, United States · NAICS 236220 Naval Facilities Engineering Command No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors