Program Management and Instructional Support Services
Award Notice Posted
- Solicitation number
- VA79810RP0096
- Agency
-
VA Strategic Acquisition Center Frederick
Headquarters, Department of Veterans Affairs
- Awarded
- to Pricewaterhousecoopers LLP
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- VA798-10-D-0073 Federal IDV award
- NAICS code
- 541611 Administrative Management and General Management Consulting Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
7 versions
Update #7 · Latest ·
##FileName: 287636/THIS IS A COMBINED SYNOPSIS.DOC
Update #6 ·
The purpose of amendment 0005 is to identify the response date. The questions and answers remain the same as in previous amendments.
The response date remains May 19, 2010.
Question
Is there a minimum and/or maximum time restriction for the video clips?
Answer
Updated Section L.2.3 Volume I: Technical Proposal. Part 3 Key Personnel to read - The video shall demonstrate the instructor's teaching style and should be between five (5) minutes and ten (10) in length. The five (5) minute minimum and ten (10) maximum apply to each individual instructor's video clip.
Questions and Answers from Amendment 0003
1. Question
How is FAC-C learning being validated now?
Answer
Most CON courses contain a pre- and post-assessment and intern cohorts are provided with a government developed and issued competency assessment at the start and finish of each program year
2. Question
How will the "knowledge transfer" occur between FAC-C contractors and awardee?
Answer
Offerors should propose the methodology for knowledge transfer in their proposals.
3. Question
On page 45, item 1c, it says "… shall include at least one (1) project management course and one (1) leadership course. The duration of the project management course shall be a minimum of one (1) week in length." What is the expected duration of the "leadership course"?
Answer
The current duration of the leadership curriculum is outlined in the table on page 44 (Section J, Attachment 4). Offerors shall propose the design and implementation of a leadership training program in accordance with Attachment J.4, paragraph A1(d).
4. Question
How will the cost to provide a "web based content management system" be covered?
Answer
The offeror's proposal should account for this in their hourly rate.
5. Question
Is there an existing schedule of planned FAC-C training courses per cohort? If so, please provide that data to allow us to illustrate a thorough sequencing diagram.
Answer
There currently is no proposed schedule of FAC-C training that coincides with this requirement. Offerors shall propose their solution for sequencing program components in their proposal. After contract award, all parties will work together to solidify exact dates for all program components.
6. Question
Please describe the technology currently in use to manage student registration, reporting, assessing and cross-functional communications.
Answer:
The intern cohorts are government employees and they are in-resident. All communications between government and contractor are either done through e-mail or in-person.
7. Question
Due to the significant nature of potential responses to the questions submitted, it is requested that the proposal due date be extended to 7 business days past the receipt of the VA's answers.
Answer
The due date for proposals remains at 3:00 local time on May 19, 2010 as stated in the solicitation.
8. Question
Attachment J.4, paragraph 1a, first sentence refers to "Using the chart in Section C.1 as a baseline and guide, ---". Section C1, does not contain such a chart.
Answer
Attachment J.4, paragraph 1a, first sentence has been corrected to read …" Using the chart in J.4 Section A, Statement of Work, as a baseline and guide, the contractor shall propose an intern program that is 36 months in length.
9. Question
If all days are added for each component in the chart on page 44, they exceed the maximum work days in a given year. Please clarify?
Answer
The chart was provided just to give offerors' a general snapshot of the current program components. The proposed sequencing is limited to a normal work year.
10. Question
Will on-site facilities and government Furnished property (GFP) be provided to the successful offeror? If so, how much of each?
Answer
No
11. Question
Is there a specified file format for submission of the video clips?
Answer
Quick Time or Windows Media will be used to view the video clips.
12. Question
Is there a minimum and/or maximum time restriction for the video clips?
Answer
Corrected Section L.2.3 Volume I: Technical Proposal. Part 3 Key Personnel - added the following sentence - The video shall be between five (5) minutes and ten (10) minutes in length.
13. Question
Are offerors allowed to hand-carry CD-ROM proposals to CAI Frederick (Page 86, Section L.2.5.1 ELECTRONIC FILE SUBMISSION)
Answer
Yes, offerors are allowed to hand-carry CD-ROM proposal to CAI Frederick. Please make sure the proposal is addressed to Department of Veterans Affairs, Center for Acquisition Innovation - Frederick, Attention: James Poe, 7485 New Horizon Way, Frederick, MD 21703.
14. Question
Do resumes count toward the 30 page limit in the Technical proposal?
Answer
No
15. Question
Do letters of commitment count toward the 30 page limit in the Technical proposal?
Answer
No
16. Question
On page 44 you reference a chart in Section C.1. There appears to be no such chart in the RFP; could you please clarify this reference?
Answer
Please refer to question number 8.
17. Question
Could hard copy fingerprints be submitted in lieu of electronic fingerprinting? (Page 12 section (ii) Electronic Fingerprint Form)
Answer
Hard copy fingerprints cannot be submitted in lieu of electronic fingerprinting.
18. Question
Does the Times New Roman 10pt. font restriction apply to graphics and tables?
Answer
Yes, the Times New Roman 10pt font restriction applies to graphics and tables.
19. Question
Do the tables of contents, list of figures, and cover page count towards the 30 page limit in the Technical proposal?
Answer
No
20. Question
Is the incumbent eligible to bid on the contract?
Answer
Yes, the incumbent is eligible to bid on the contract.
21. Question
What current curriculum materials can be made available?
Answer
The solicitation includes all of the materials that will be made available.
22. Question
Is there an intern 'roadmap' or program guide available for those interns already in the program that can be shared by the bidders to review during the proposal process?
Answer
There is not a roadmap that is available for offerors. However, the purpose of the chart on p. 44 (Attachment J.4) is to provide a general snapshot of the required program components. Offerors are required to propose the sequencing that they determine to be the best solution in developing future generations of trusted business advisors in contracting for the VA. The components and their sequencing should provide a comprehensive curricula and holistic approach to ensure that interns learn an array of skills and obtain requisite acquisition certifications.
23. Question
Is there any certification other than FAC-C required in the program?
Answer
No.
24. Question
Are the interns Federal career interns or Federal Presidential Management Fellows?
Answer
Interns are in the Federal Career Intern Program (FCIP).
25. Question
Upon completion of the program, at what typical level are the graduates working - Level 7-9 or 9-11 (or their equivalents)?
Answer
The three-year internship program begins at the GS-7 level with full performance to the GS-12 level. .
26. Question
Is the contractor required to maintain records on all interns?
Answer
Refer to Attachment J.4, C. Task Order Deliverables - page 48, items 3, 6, and 7. In order to participate in the In process review and to provide summary of intern grades for all training on a quarterly basis, the contractor will need to maintain certain types of records on all interns in order to meet these requirements.
27. Question
What documentation is required for conversion from intern to FTE?
Answer
This will be handled by the VA.
28. Question
Is new curriculum development required or do existing materials need enhancement?
Answer
The successful contractor will be required to develop materials. Refer to Attachment J.4, A.1 Statement of Work p. 44 and 45 - The contractor will be required to (b) develop and implement the hands-on learning laboratories/skill building; (d) design and implement a leadership training program.
29. Question
Have the criteria for interns' success been determined, e.g., retention, conversion?
Answer
No
30. Question
What is the current intern recruitment process?
Answer
The VA strategically recruits for GS-1102's throughout the country under the FCIP. Candidates for the program must have a Bachelor's Degree or a minimum of 24 hours of business credits to be considered. Under this requirement, the contractor will not be responsible for the recruitment of intern classes.
31. Question
Where are the interns recruited from?
Answer
The VA strategically recruits throughout the country.
32. Question
On page 45, item C, "the contractor shall be responsible for providing FAC-C elective requirements, which at a minimum shall include at least (1) one Project Management course and one (1) leadership course …". Are these two elective topics to be offered as a minimum per certification level or across all three certification levels?
Answer
The electives are to be offered as a minimum per certification level.
33. Question
On page 46, item J, "Additional Feedback by instructors in the form of coaching is required." Is this the internship program contractor's or the FAC-C contractor's responsibility?
Answer
This is a requirement of the Program Management and Training contractor under this requirement.
34. Question
Page 46, Item J. What is the response requirement from the FAC-C contractor to meet this timeframe?
Answer
The individual written feedback about intern performance for all training over 24 hours (3 days) is required no later than five (5) business days after course completion. (Refer to Attachment J.4, C. Task Order Deliverables - page 48, item 6.)
35. Question
Page 44, Item 1A. How long is the typical job rotational assignment? How diverse is the geographic scope of these rotations, as it can impact sequencing of events? Are the rotations similar in scope for each of the cohort participants?
Answer
The majority of job rotations will be in the Frederick, Maryland, and Washington, DC - Baltimore, Maryland, metropolitan area with potential opportunities at various VA facilities across the nation depending on the acquisition support needs of the department. There are VA facilities in all 50 states, Puerto Rico, and the District of Columbia. Guided by seasoned professionals, interns will complete job assignments that may take place in Frederick, Maryland, or in the field at a VA facility or VA administrative office. As the program progresses, the interns will transition from participating in formal coursework to devoting more time to job rotation assignments. Knowledge is also broadened by visits to VA Medical Centers and meetings with industry representatives.
The length of the job rotation period varies throughout the three year period. During the first year, typically the rotations last between 1 month and 3 ½ months; during the second year, the rotations typically range between 2 months and 2 ½ months; during the third year, rotations encompass the majority of the year. The scope of the work the interns participate in during their rotational periods is dependent upon the type of acquisition work being performed at the various locations.
36. Question
What ate the requirements for a VA-specific system (firewall/web/system)?
Answer
At this time there is no intent on the part of the Government for the contractor to have connection through the firewall when not on VA premises.
Update #5 ·
The purpose of this amendment 0004 is to correct the answer to the following question.
Question
Is there a minimum and/or maximum time restriction for the video clips?
Answer
Updated Section L.2.3 Volume I: Technical Proposal. Part 3 Key Personnel to read - The video shall demonstrate the instructor's teaching style and should be between five (5) minutes and ten (10) in length. The five (5) minute minimum and ten (10) maximum apply to each individual instructor's video clip.
Questions and Answers from Amendment 0003
1. Question
How is FAC-C learning being validated now?
Answer
Most CON courses contain a pre- and post-assessment and intern cohorts are provided with a government developed and issued competency assessment at the start and finish of each program year
2. Question
How will the "knowledge transfer" occur between FAC-C contractors and awardee?
Answer
Offerors should propose the methodology for knowledge transfer in their proposals.
3. Question
On page 45, item 1c, it says "… shall include at least one (1) project management course and one (1) leadership course. The duration of the project management course shall be a minimum of one (1) week in length." What is the expected duration of the "leadership course"?
Answer
The current duration of the leadership curriculum is outlined in the table on page 44 (Section J, Attachment 4). Offerors shall propose the design and implementation of a leadership training program in accordance with Attachment J.4, paragraph A1(d).
4. Question
How will the cost to provide a "web based content management system" be covered?
Answer
The offeror's proposal should account for this in their hourly rate.
5. Question
Is there an existing schedule of planned FAC-C training courses per cohort? If so, please provide that data to allow us to illustrate a thorough sequencing diagram.
Answer
There currently is no proposed schedule of FAC-C training that coincides with this requirement. Offerors shall propose their solution for sequencing program components in their proposal. After contract award, all parties will work together to solidify exact dates for all program components.
6. Question
Please describe the technology currently in use to manage student registration, reporting, assessing and cross-functional communications.
Answer:
The intern cohorts are government employees and they are in-resident. All communications between government and contractor are either done through e-mail or in-person.
7. Question
Due to the significant nature of potential responses to the questions submitted, it is requested that the proposal due date be extended to 7 business days past the receipt of the VA's answers.
Answer
The due date for proposals remains at 3:00 local time on May 19, 2010 as stated in the solicitation.
8. Question
Attachment J.4, paragraph 1a, first sentence refers to "Using the chart in Section C.1 as a baseline and guide, ---". Section C1, does not contain such a chart.
Answer
Attachment J.4, paragraph 1a, first sentence has been corrected to read …" Using the chart in J.4 Section A, Statement of Work, as a baseline and guide, the contractor shall propose an intern program that is 36 months in length.
9. Question
If all days are added for each component in the chart on page 44, they exceed the maximum work days in a given year. Please clarify?
Answer
The chart was provided just to give offerors' a general snapshot of the current program components. The proposed sequencing is limited to a normal work year.
10. Question
Will on-site facilities and government Furnished property (GFP) be provided to the successful offeror? If so, how much of each?
Answer
No
11. Question
Is there a specified file format for submission of the video clips?
Answer
Quick Time or Windows Media will be used to view the video clips.
12. Question
Is there a minimum and/or maximum time restriction for the video clips?
Answer
Corrected Section L.2.3 Volume I: Technical Proposal. Part 3 Key Personnel - added the following sentence - The video shall be between five (5) minutes and ten (10) minutes in length.
13. Question
Are offerors allowed to hand-carry CD-ROM proposals to CAI Frederick (Page 86, Section L.2.5.1 ELECTRONIC FILE SUBMISSION)
Answer
Yes, offerors are allowed to hand-carry CD-ROM proposal to CAI Frederick. Please make sure the proposal is addressed to Department of Veterans Affairs, Center for Acquisition Innovation - Frederick, Attention: James Poe, 7485 New Horizon Way, Frederick, MD 21703.
14. Question
Do resumes count toward the 30 page limit in the Technical proposal?
Answer
No
15. Question
Do letters of commitment count toward the 30 page limit in the Technical proposal?
Answer
No
16. Question
On page 44 you reference a chart in Section C.1. There appears to be no such chart in the RFP; could you please clarify this reference?
Answer
Please refer to question number 8.
17. Question
Could hard copy fingerprints be submitted in lieu of electronic fingerprinting? (Page 12 section (ii) Electronic Fingerprint Form)
Answer
Hard copy fingerprints cannot be submitted in lieu of electronic fingerprinting.
18. Question
Does the Times New Roman 10pt. font restriction apply to graphics and tables?
Answer
Yes, the Times New Roman 10pt font restriction applies to graphics and tables.
19. Question
Do the tables of contents, list of figures, and cover page count towards the 30 page limit in the Technical proposal?
Answer
No
20. Question
Is the incumbent eligible to bid on the contract?
Answer
Yes, the incumbent is eligible to bid on the contract.
21. Question
What current curriculum materials can be made available?
Answer
The solicitation includes all of the materials that will be made available.
22. Question
Is there an intern 'roadmap' or program guide available for those interns already in the program that can be shared by the bidders to review during the proposal process?
Answer
There is not a roadmap that is available for offerors. However, the purpose of the chart on p. 44 (Attachment J.4) is to provide a general snapshot of the required program components. Offerors are required to propose the sequencing that they determine to be the best solution in developing future generations of trusted business advisors in contracting for the VA. The components and their sequencing should provide a comprehensive curricula and holistic approach to ensure that interns learn an array of skills and obtain requisite acquisition certifications.
23. Question
Is there any certification other than FAC-C required in the program?
Answer
No.
24. Question
Are the interns Federal career interns or Federal Presidential Management Fellows?
Answer
Interns are in the Federal Career Intern Program (FCIP).
25. Question
Upon completion of the program, at what typical level are the graduates working - Level 7-9 or 9-11 (or their equivalents)?
Answer
The three-year internship program begins at the GS-7 level with full performance to the GS-12 level. .
26. Question
Is the contractor required to maintain records on all interns?
Answer
Refer to Attachment J.4, C. Task Order Deliverables - page 48, items 3, 6, and 7. In order to participate in the In process review and to provide summary of intern grades for all training on a quarterly basis, the contractor will need to maintain certain types of records on all interns in order to meet these requirements.
27. Question
What documentation is required for conversion from intern to FTE?
Answer
This will be handled by the VA.
28. Question
Is new curriculum development required or do existing materials need enhancement?
Answer
The successful contractor will be required to develop materials. Refer to Attachment J.4, A.1 Statement of Work p. 44 and 45 - The contractor will be required to (b) develop and implement the hands-on learning laboratories/skill building; (d) design and implement a leadership training program.
29. Question
Have the criteria for interns' success been determined, e.g., retention, conversion?
Answer
No
30. Question
What is the current intern recruitment process?
Answer
The VA strategically recruits for GS-1102's throughout the country under the FCIP. Candidates for the program must have a Bachelor's Degree or a minimum of 24 hours of business credits to be considered. Under this requirement, the contractor will not be responsible for the recruitment of intern classes.
31. Question
Where are the interns recruited from?
Answer
The VA strategically recruits throughout the country.
32. Question
On page 45, item C, "the contractor shall be responsible for providing FAC-C elective requirements, which at a minimum shall include at least (1) one Project Management course and one (1) leadership course …". Are these two elective topics to be offered as a minimum per certification level or across all three certification levels?
Answer
The electives are to be offered as a minimum per certification level.
33. Question
On page 46, item J, "Additional Feedback by instructors in the form of coaching is required." Is this the internship program contractor's or the FAC-C contractor's responsibility?
Answer
This is a requirement of the Program Management and Training contractor under this requirement.
34. Question
Page 46, Item J. What is the response requirement from the FAC-C contractor to meet this timeframe?
Answer
The individual written feedback about intern performance for all training over 24 hours (3 days) is required no later than five (5) business days after course completion. (Refer to Attachment J.4, C. Task Order Deliverables - page 48, item 6.)
35. Question
Page 44, Item 1A. How long is the typical job rotational assignment? How diverse is the geographic scope of these rotations, as it can impact sequencing of events? Are the rotations similar in scope for each of the cohort participants?
Answer
The majority of job rotations will be in the Frederick, Maryland, and Washington, DC - Baltimore, Maryland, metropolitan area with potential opportunities at various VA facilities across the nation depending on the acquisition support needs of the department. There are VA facilities in all 50 states, Puerto Rico, and the District of Columbia. Guided by seasoned professionals, interns will complete job assignments that may take place in Frederick, Maryland, or in the field at a VA facility or VA administrative office. As the program progresses, the interns will transition from participating in formal coursework to devoting more time to job rotation assignments. Knowledge is also broadened by visits to VA Medical Centers and meetings with industry representatives.
The length of the job rotation period varies throughout the three year period. During the first year, typically the rotations last between 1 month and 3 ½ months; during the second year, the rotations typically range between 2 months and 2 ½ months; during the third year, rotations encompass the majority of the year. The scope of the work the interns participate in during their rotational periods is dependent upon the type of acquisition work being performed at the various locations.
36. Question
What ate the requirements for a VA-specific system (firewall/web/system)?
Answer
At this time there is no intent on the part of the Government for the contractor to have connection through the firewall when not on VA premises.
Update #4 ·
The purpose of this amendment is to:
1. Correct Attachment J.4, paragraph 1a, first sentence. It has been changed to read "Using the chart in J.4 Section A, Statement of Work, as a baseline and guide, the contractor shall propose an intern program that is 36 months in length.
2. Correct Section L.2.3 Volume I: Technical Proposal. Part 3 Key Personnel - added the following sentence - The video shall be between five (5) minutes and ten (10) minutes in length.
3. Provide Questions and Answers.
Questions and Answers
1. Question
How is FAC-C learning being validated now?
Answer
Most CON courses contain a pre- and post-assessment and intern cohorts are provided with a government developed and issued competency assessment at the start and finish of each program year
2. Question
How will the "knowledge transfer" occur between FAC-C contractors and awardee?
Answer
Offerors should propose the methodology for knowledge transfer in their proposals.
3. Question
On page 45, item 1c, it says "… shall include at least one (1) project management course and one (1) leadership course. The duration of the project management course shall be a minimum of one (1) week in length." What is the expected duration of the "leadership course"?
Answer
The current duration of the leadership curriculum is outlined in the table on page 44 (Section J, Attachment 4). Offerors shall propose the design and implementation of a leadership training program in accordance with Attachment J.4, paragraph A1(d).
4. Question
How will the cost to provide a "web based content management system" be covered?
Answer
The offeror's proposal should account for this in their hourly rate.
5. Question
Is there an existing schedule of planned FAC-C training courses per cohort? If so, please provide that data to allow us to illustrate a thorough sequencing diagram.
Answer
There currently is no proposed schedule of FAC-C training that coincides with this requirement. Offerors shall propose their solution for sequencing program components in their proposal. After contract award, all parties will work together to solidify exact dates for all program components.
6. Question
Please describe the technology currently in use to manage student registration, reporting, assessing and cross-functional communications.
Answer:
The intern cohorts are government employees and they are in-resident. All communications between government and contractor are either done through e-mail or in-person.
7. Question
Due to the significant nature of potential responses to the questions submitted, it is requested that the proposal due date be extended to 7 business days past the receipt of the VA's answers.
Answer
The due date for proposals remains at 3:00 local time on May 19, 2010 as stated in the solicitation.
8. Question
Attachment J.4, paragraph 1a, first sentence refers to "Using the chart in Section C.1 as a baseline and guide, ---". Section C1, does not contain such a chart.
Answer
Attachment J.4, paragraph 1a, first sentence has been corrected to read …" Using the chart in J.4 Section A, Statement of Work, as a baseline and guide, the contractor shall propose an intern program that is 36 months in length.
9. Question
If all days are added for each component in the chart on page 44, they exceed the maximum work days in a given year. Please clarify?
Answer
The chart was provided just to give offerors' a general snapshot of the current program components. The proposed sequencing is limited to a normal work year.
10. Question
Will on-site facilities and government Furnished property (GFP) be provided to the successful offeror? If so, how much of each?
Answer
No
11. Question
Is there a specified file format for submission of the video clips?
Answer
Quick Time or Windows Media will be used to view the video clips.
12. Question
Is there a minimum and/or maximum time restriction for the video clips?
Answer
Corrected Section L.2.3 Volume I: Technical Proposal. Part 3 Key Personnel - added the following sentence - The video shall be between five (5) minutes and ten (10) minutes in length.
13. Question
Are offerors allowed to hand-carry CD-ROM proposals to CAI Frederick (Page 86, Section L.2.5.1 ELECTRONIC FILE SUBMISSION)
Answer
Yes, offerors are allowed to hand-carry CD-ROM proposal to CAI Frederick. Please make sure the proposal is addressed to Department of Veterans Affairs, Center for Acquisition Innovation - Frederick, Attention: James Poe, 7485 New Horizon Way, Frederick, MD 21703.
14. Question
Do resumes count toward the 30 page limit in the Technical proposal?
Answer
No
15. Question
Do letters of commitment count toward the 30 page limit in the Technical proposal?
Answer
No
16. Question
On page 44 you reference a chart in Section C.1. There appears to be no such chart in the RFP; could you please clarify this reference?
Answer
Please refer to question number 8.
17. Question
Could hard copy fingerprints be submitted in lieu of electronic fingerprinting? (Page 12 section (ii) Electronic Fingerprint Form)
Answer
Hard copy fingerprints cannot be submitted in lieu of electronic fingerprinting.
18. Question
Does the Times New Roman 10pt. font restriction apply to graphics and tables?
Answer
Yes, the Times New Roman 10pt font restriction applies to graphics and tables.
19. Question
Do the tables of contents, list of figures, and cover page count towards the 30 page limit in the Technical proposal?
Answer
No
20. Question
Is the incumbent eligible to bid on the contract?
Answer
Yes, the incumbent is eligible to bid on the contract.
21. Question
What current curriculum materials can be made available?
Answer
The solicitation includes all of the materials that will be made available.
22. Question
Is there an intern 'roadmap' or program guide available for those interns already in the program that can be shared by the bidders to review during the proposal process?
Answer
There is not a roadmap that is available for offerors. However, the purpose of the chart on p. 44 (Attachment J.4) is to provide a general snapshot of the required program components. Offerors are required to propose the sequencing that they determine to be the best solution in developing future generations of trusted business advisors in contracting for the VA. The components and their sequencing should provide a comprehensive curricula and holistic approach to ensure that interns learn an array of skills and obtain requisite acquisition certifications.
23. Question
Is there any certification other than FAC-C required in the program?
Answer
No.
24. Question
Are the interns Federal career interns or Federal Presidential Management Fellows?
Answer
Interns are in the Federal Career Intern Program (FCIP).
25. Question
Upon completion of the program, at what typical level are the graduates working - Level 7-9 or 9-11 (or their equivalents)?
Answer
The three-year internship program begins at the GS-7 level with full performance to the GS-12 level. .
26. Question
Is the contractor required to maintain records on all interns?
Answer
Refer to Attachment J.4, C. Task Order Deliverables - page 48, items 3, 6, and 7. In order to participate in the In process review and to provide summary of intern grades for all training on a quarterly basis, the contractor will need to maintain certain types of records on all interns in order to meet these requirements.
27. Question
What documentation is required for conversion from intern to FTE?
Answer
This will be handled by the VA.
28. Question
Is new curriculum development required or do existing materials need enhancement?
Answer
The successful contractor will be required to develop materials. Refer to Attachment J.4, A.1 Statement of Work p. 44 and 45 - The contractor will be required to (b) develop and implement the hands-on learning laboratories/skill building; (d) design and implement a leadership training program.
29. Question
Have the criteria for interns' success been determined, e.g., retention, conversion?
Answer
No
30. Question
What is the current intern recruitment process?
Answer
The VA strategically recruits for GS-1102's throughout the country under the FCIP. Candidates for the program must have a Bachelor's Degree or a minimum of 24 hours of business credits to be considered. Under this requirement, the contractor will not be responsible for the recruitment of intern classes.
31. Question
Where are the interns recruited from?
Answer
The VA strategically recruits throughout the country.
32. Question
On page 45, item C, "the contractor shall be responsible for providing FAC-C elective requirements, which at a minimum shall include at least (1) one Project Management course and one (1) leadership course …". Are these two elective topics to be offered as a minimum per certification level or across all three certification levels?
Answer
The electives are to be offered as a minimum per certification level.
33. Question
On page 46, item J, "Additional Feedback by instructors in the form of coaching is required." Is this the internship program contractor's or the FAC-C contractor's responsibility?
Answer
This is a requirement of the Program Management and Training contractor under this requirement.
34. Question
Page 46, Item J. What is the response requirement from the FAC-C contractor to meet this timeframe?
Answer
The individual written feedback about intern performance for all training over 24 hours (3 days) is required no later than five (5) business days after course completion. (Refer to Attachment J.4, C. Task Order Deliverables - page 48, item 6.)
35. Question
Page 44, Item 1A. How long is the typical job rotational assignment? How diverse is the geographic scope of these rotations, as it can impact sequencing of events? Are the rotations similar in scope for each of the cohort participants?
Answer
The majority of job rotations will be in the Frederick, Maryland, and Washington, DC - Baltimore, Maryland, metropolitan area with potential opportunities at various VA facilities across the nation depending on the acquisition support needs of the department. There are VA facilities in all 50 states, Puerto Rico, and the District of Columbia. Guided by seasoned professionals, interns will complete job assignments that may take place in Frederick, Maryland, or in the field at a VA facility or VA administrative office. As the program progresses, the interns will transition from participating in formal coursework to devoting more time to job rotation assignments. Knowledge is also broadened by visits to VA Medical Centers and meetings with industry representatives.
The length of the job rotation period varies throughout the three year period. During the first year, typically the rotations last between 1 month and 3 ½ months; during the second year, the rotations typically range between 2 months and 2 ½ months; during the third year, rotations encompass the majority of the year. The scope of the work the interns participate in during their rotational periods is dependent upon the type of acquisition work being performed at the various locations.
36. Question
What ate the requirements for a VA-specific system (firewall/web/system)?
Answer
At this time there is no intent on the part of the Government for the contractor to have connection through the firewall when not on VA premises.
Update #3 ·
Department of Veterans AffairCombined Synopsis/Solicitation for Program Management and Instructional Support Services
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format prescribed in Subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation number is VA798-10-RP-0096, and it is being issued as a Request for Proposal (RFP).
The NAICS code for this requirement is 541611. The Small Business Administration (SBA) size standard for the NAICS code 541611 is $7M.
The Veteran Center for Acquisition Innovation (CAI) intends to issue a Firm-Fixed Price Indefinite Delivery/Indefinite Quantity type contract. The anticipated period of performance is for a term of five (5) years.
VA798-10-RP-0096 and incorporated provisions and clauses are those in effect through Federal Acquisition Circular Fac 2005-40.
Place of Contract Performance: Performance will be predominantly at the VA Acquisition Academy (VAAA) in Frederick, MD.
VA98-10-RP-0096 will be distributed solely through the FedBizOpps website (http://www.fedbizopps.gov). All future information about this acquisition, including solicitation amendments will also be distributed solely through the FedBizOpps. Interested parties are responsible for monitoring the FedBizOpps website to assure that they have the most up-to-date information about this acquisition.
Attachments: ****SF1449 (Includes all applicable FAR AND VAAR clauses, SOW and Evaluation Factors etc. and separate Attachments (Price Schedule, Mission Support Standard Operating Procedure)****
SUBMISSION OF QUESTIONS DEADLINE
Through Monday, May 10, 2010.
CLOSING DATE:
No later than 3:00 pm local time on Wednesday, May 19, 2010.
Update #2 ·
This solicitation was mistakenly posted as a combined synopsis/solicitation. We will attempt to post this solicitation using a pre-solicitation notice.
Update #1 ·
Department of Veterans AffairsCombined Synopsis/Solicitation for Program Management and Instructional Support Services
Please refer to RFP: VA798-10-RP-0096 for the SF 1449 and attached documents.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format prescribed in Subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation number is VA798-10-RP-0096, and it is being issued as a Request for Proposal (RFP).
The NAICS code for this requirement is 541611. The Small Business Administration (SBA) size standard for the NAICS code 541611 is $7M.
The Veteran Center for Acquisition Innovation (CAI) intends to issue a Firm-Fixed Price Indefinite Delivery/Indefinite Quantity type contract. The anticipated period of performance is for a term of five (5) years.
VA798-10-RP-0096 and incorporated provisions and clauses are those in effect through Federal Acquisition Circular Fac 2005-40.
Place of Contract Performance: Performance will be predominantly at the VA Acquisition Academy (VAAA) in Frederick, MD.
VA98-10-RP-0096 will be distributed solely through the FedBizOpps website (http://www.fedbizopps.gov). All future information about this acquisition, including solicitation amendments will also be distributed solely through the FedBizOpps. Interested parties are responsible for monitoring the FedBizOpps website to assure that they have the most up-to-date information about this acquisition.
Attachments: ****SF1449 (Includes all applicable FAR AND VAAR clauses, SOW and Evaluation Factors etc. and separate Attachments (Price Schedule, Mission Support Standard Operating Procedure)****
SUBMISSION OF QUESTIONS DEADLINE
Through Monday, May 10, 2010.
CLOSING DATE:
No later than 3:00 pm local time on Wednesday, May 19, 2010.
Files
| File | Type | Posted |
|---|---|---|
| REVISED J.3 PROGRAM MANAGEMENT AND INSTRUCTIONAL SUPPORT SERVICES PRICING SCHEDULE.XLS | XLS spreadsheet | |
| VA798-10-RP-0096 0001.doc | DOC document | |
| VA798-10-RP-0096.doc | DOC document | |
| J.3 PROGRAM MANAGEMENT AND INSTRUCTIONAL SUPPORT SERVICES PRICING SCHEDULE.XLS | XLS spreadsheet | |
| J.8 ATTACHMENT SERVICE COMPONENT.PDF |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity