Premise wiring B145

Closed Solicitation Posted

Solicitation number
FA462626Q0009
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Malmstrom AFB, Montana 59402, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Air Force Global Strike Command is soliciting offers for a premises wiring upgrade project designated as PREMISE WIRING B145 at Malmstrom Air Force Base in Montana. The solicitation (FA462626Q0009) seeks a contractor to engineer, furnish, install, and test new plenum-rated Category 6 copper cabling and OM4 multimode fiber optic cabling throughout Building 145, including installation of communications racks and cabinets, AC power distribution units, and grounding infrastructure. The contractor must also remove and dispose of all existing outdated Cat-3/5 and abandoned fiber cabling in compliance with federal, state, and local environmental regulations. Evaluation will be based on price and conformance to the performance work statement, with award made to the lowest-priced qualified offer among the three lowest bids. The original response deadline of April 6, 2026 was extended to April 10, 2026, then further extended to April 17, 2026, and most recently to April 24, 2026, all at 1:00 PM Mountain Standard Time. A mandatory site visit was scheduled for April 7, 2026 at 10:00 MST.

This solicitation is set aside 100 percent for small businesses under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a size standard of $19,000,000. The project requires installation of 198 Cat-6 drop outlets totaling 448 individual drops across six zones and eight OM4 multimode fiber dual-drop outlets totaling 16 duplex drops, along with twelve 48-port Cat-6 patch panels and one 48-port OM4 fiber patch panel distributed across five communications equipment locations. The contract is structured as a firm fixed-price arrangement with delivery required within 180 calendar days from the date of award, representing an extension from the original 90-day timeline. Prevailing wage requirements apply under the Service Contract Act with Montana Cascade County wage rates (Wage Determination No. 20155391, Revision 26). Performance will occur at Malmstrom Air Force Base, Montana, with inspection and acceptance at both the contractor's facility and the destination at the Air Force Communications Squadron.

Notice text

3 versions

Update #3 · Latest ·

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.

Amendment 0001:

1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402.

2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST

RFIs answered 

  1. How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time.
    1. We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution. 
  2. Please clarify the description “new/replacement”. Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there.
    1. There is a few area that require new drops to be cut in from existing cabling that is running out in the open.
  3. Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations?
    1. Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2.
  4. Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled.
    1. It should state somewhere that all unused copper will be removed from the building.
  5. Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there.
    1. Yes, for terminating to the patch panel. We will patch into the switch.

See Attached SOO for full details.

Update #2 ·

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.

Amendment 0001:

1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402.

2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST

See Attached SOO for full details.

Update #1 ·

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly.

See Attached SOO for full details.

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements West Yellowstone, Montana 59758, United States · NAICS 238210 Forest Service Total Small Business
56 CS FOC to Flightline and Wx Equipment, Luke AFB Luke Air Force Base, Arizona 85309, United States · NAICS 335921 Air Education and Training Command Woman-Owned Small Business
Request for Information - Sentinel OMC Packages & OGF, Malmstrom Air Force Base, MT Malmstrom AFB, Montana, United States · NAICS 236220 ENDIST Seattle No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity